Loading...
6.9. SR 07-08-1996'ity of ITEM 6.9. MEMORANDUM 'Vel' Mayor and City Council FROM: Phil Hals, Street/Park Superintendent DATE: July 8, 1996 SUBJECT: Meadowvale Heights - Hiking/Biking Trails On June 12, 1996, about twenty residents from the Meadowvale Heights development appeared before the Park and Recreation Commission in opposition to the proposed hiking/biking trails. The arguments against the trail were basically as follows: · An eight foot bituminous trail with a five foot boulevard takes a lot away from their front yards. · The trail in the south western corner is a dead end at the railroad tracks. · Elgin Drive is a residential street with local traffic, which allows pedestrian use of the street. · The trail between Elgin Drive and Denver Street will negatively impact back yard drainage and is only slightly shorter in distance than following the street. There were no strong sentiments expressed, pro or con, for the trail in the northeast corner of the plat. All present were in agreement that the trail that links the city park in the northwest corner (off Elgin Court) should remain. Staff Recommendations · Remove Class 5 base that has been installed on all trail areas, except the access trail to the city park, and place topsoil and seed in those areas. · The city retain the easements for future park use. · The trail access to the city park be completed in the near future. · The UPA pole in the trail from Elgin Drive to Denver Street remain as is and the moneys from this project be used for other park development. Since only two members of the Park and Recreation Commission were present and there was not a quorum, no formal action was taken. It was the consensus of those present that they agreed with staff recommendations. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425