Loading...
6.11. SR 07-08-1996CON~ULTINGENG[NEER~ 1326 EnergyParkDrive @.Paul, MN 55108 612-644-4389 1-800-888-2923 Fax:612-644-9446 CIVIL ENGINEERING: ENVIRONMENTAL MUNICIPAL PLANNING SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRICAL/MECHANICAL ENGINEERING: HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS OFFICES IN: MINNEAPOLIS PRIOR LAKE ST. PAUL WASECA ITeM 6.11. June 26, 1996 File: 230-277-20 Ms. Lori Johnson Finance Director City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 JOPLIN STREET INTERSECTION / NORTH FRONTAGE ROAD MnDOT COOPERATIVE AGREEMENT Dear Ms. Johnson: Attached are two copies of a resolution and a Cooperative Agreement for the Joplin Street Intersection/North Frontage Road project. This is one more step in getting this project accomplished. This Cooperative Agreement spells out the participation and the method of payment for all of MnDOT's participation, with the exception of the signal. There will be a second Cooperative Agreement to cover the signal which will be forthcoming. This Cooperative Agreement has the standard language that we have seen in all other agreements. It requires MnDOT to give concurrence to the award of the contract and it spells out MnDOT's participation based on our preliminary estimates. After the contract is let, there will be a new participation calculation done based on the actual bid. The City can ask for payment from MnDOT after the contract is awarded and the documents executed with the Contractor. The remaining items to be accomplished on this project are the Cooperative Agreement for the signal which we expect shortly, the Haman easements executed, and the extinguishment of driveway rights for the Hartman rental property. These are in the possession of Mr. Haman and I understand from his attorney that he is actively trying to get the consent from mortgage companies, so we expect these documents back from Mr. Hartman in the near future. The final thing that we will need from MnDOT is an agreement to open up Joplin Street on the north side of Highway 10. They will be preparing that in the near future. Once we have all these documents prepared, we expect the Central Office to approve the plans for bidding. It appears from the amount of paperwork left to be done that it will be sometime toward the latter part of July before we receive approval to bid the project. An Equal Opportunity Employer Ms. Lori Johnson June 26, 1996 Page Two We would recommend City adoption of the attached resolution and authorization to enter into the attached Cooperative Agreement. If you have any questions regarding this, please call. Sincerely, MSA, CONSULTING ENGINEERS Terry J(l~laurer, P.E. TJM:tw Enclosure 277-2604.jun 74958 CITY OF ELK RIVER RESOLUTION BE IT RESOLVED that the City of Elk River enter into Agreement No. 74958 with the State of Minnesota, Department of Transportation for the following purposes, to-wit: to provide for payment by the State to the City of the State's share of the cost of grading, aggregate base, bituminous surfacing, concrete curb and gutter and storm sewer construction and other associated construction to be performed upon, along and adjacent to Trunk Highway No. 10 from 185th Avenue to Naples Street within the corporate City limits in accordance with plans, specifications and/or special provisions designated as State Project No. 7102-87 (T.H. 10=003). BE IT FURTHER RESOLVED that the proper City Officers are hereby authorized and directed to execute such agreement. CERTIFICATION State of Minnesota County of Sherburne City of Elk River I hereby certify that the foregoing Resolution is a true and correct copy of the resolution presented to and adopted by the Council of the City of Elk River at a duly authorized meeting thereof held on the day of , 1996, as shown by the minutes of said meeting in my possession. City Clerk (Signature) (Type or print name)