Elk River Municipal .Utilities has given the Heritage Preservation Commission until Sept
2009 to come up with a plan to save the Jackson Street Water Tower. Recently, more
activity/interest has occurred in preserving this land mazk, so we did another examination
of the structure and made more inquiries to more accurately assess the costs associated
with preserving it.
Attached is a lab test result performed by Corrosion Control consultants & Labs,
subcontractor to KLM Engineering, Inc, which shows the presence of lead based paint.
Initial cost estimates were 25K for touch-up painting and SOK to completely repaint the
structure. That cost is now estimated to be 128K because the level of lead requires sand
blasting to bare metal, and that means draping the tower and disposing of the paint as
hazazdous material.. Repainting every 20 years is required.
Elk River Municipal Utilities has budgeted 35K in 2009 to demolish the structure. No
new estimate has been made to determine if that is adequate to cover demolition now that
the structure is considered hazardous!
A power point presentation revealing the present state of the structure will be available at
the Commission meeting should you wish to review it.
~ ! ~ `~ /,.
i
w~~'
f
h w
~r" ~~
~}_
~'
.,>. ~ ~ ~ ,
k,;~'M~~ k ' y QT}
- tii~. ~ 9{
~/' ~ ` ~!1' ~ mob, :? ,
.w..~ }
J~".1 i~
~ ~.
~' 1 '
4
~5
z ti-
r _
ti
~a i ~ „~
r,
fi
Quad
r
`t:
~_
~I
i
t
i
I~
~~
'~
g~
f
,: s
KL11~I E~g~n~eering, Inc.
n.7.'d^'
ry
Est ~~-si ~~
. www.klmenaineerino.corn
May 5, 2008
Mr. Bryan Adams, P.E.
General Manager
Elk River Municipal Utilities
13069 Orono Parkway
Elk River, MN 55330
RE: Lead Test Results, Jackson Street Tower, Elk River Municipal Utilities. KLM
Project No. MN 2504.
Dear Mr. Adams;
Thank you for the opportunity to assist you with the testing of the paint chips on the
above referenced project.
Seeing as how I seem unable to email you I have attached the test results from Corrosion
Control Consultants and Labs, Inc. which show that the exterior paint is classified as
lead-based paint. The two (2) samples test at 0.49% and 1.2%. Minnesota classifies lead
based paint as any coating containing 0.50% or above. Given the potential for error in
sampling and results slightly lower then actual, you have paint that should be considered
as lead-based paint.
The Chromium content is not high enough to cause problems.
Please feel free to call me to discuss any questions you may have
Sincerely,
KLM Engineering, Inc.
Jack R. Kollmer
President /Principal
JRK/ls
C:UsURKVNN2504 Elk River Lead Test Results OS-OS-OB.doc
01/27!2009 11:16 6169408139 CCCL MI PAGE 02
CORROSION CO1~ ~ ROL CONSULTANTS & LABo, INC. a GPI company
ANALYTICAL I;ATORATORY REPORT firiday, May 2, 2008 Pago 1 of 1
CUSTOMER: KLM Engineering, Inc. DATE RECF)<VED: Tuesday, April 29, 2008
PO Box 897, 3394 Lake Elmo Ave N PO/PROJECT #: MN 2504
Lake Elmo, MN 55042 SVBM><'l"l'AL *: 2008-04-29-009
LAB NUMBER: M28892
Sampled Dy: City Date Sampled: Friday, April 18,1008
Job Location: Elk River, MN Sample DcscripHo^: Paint Chips
Semple IdantlgaSaa: 1- 3attom- Exi'arior
Preparation Method: FPA 600/K 93/200M-P (Total Metals in Paint Chips, Sonication)
Analysis Method: EPA ti010II (ICP-AES Method for Deternunadon of Metals)
Date AnaFyud: Thursday, May 1, 2008
RI;PORTAYG
£1.1;M1rlYl' R,~SU>r fbv~rcinht) )<,1H11x08T,)
Lead 0.49 % 0.0050
_ Chramiam 0.06 % 0,0013
LAB NUMBEI;t: AAZ8893
Sampled By: City Date Sampled: Friday, April 1$, 20A$
.bb location: Elk Rivet. IWd 8ampic Description: Paint Chips
Sample Identification: Z- Top- CsJerior
I'reparattow Method: EPA 600/R-93/200M-P (Total Metals in Isaint Chips, Sonication)
Analysis Method: FAA 6010B (ICP-AES Method for Determination of Metals)
Date Analyzed: Thursday, May 1, 2008
REPORTING
EI.EMt;lV1' RESULT f'bv weleht) LIMiT (1tL)
Lead l.Z % 0.0050
Chromium 0.33 "/° 0.0013 %
Unless otherwise notexl, the condition of each sample was acceptable upon receipt, all laboratory quality control requirements
were rnet, and sample resuUs have sot beet adjusted baye~d1 ion, ~~i~e~ld blank or other analytical blank results,
Tests Reviewed By: Megan Colwell, Senior Chemist ~""~"''"` C~
dual w es and air; and in the Industrial Hyg~one Pro ~ _~ tnctals in air.
-rats rcpon sh not be rep aced except ii, without wr en approve o CC L.
lndlvidual sample results relate only to the sample as receivod by the laboratory
4403 Donkey CT SE • Kentwood, MI 49512-4034 • (616) 940-3112 • www.ccclabs.conn • www.gpinet.com