Loading...
5.4. ERMU SR 02-24-2009Elk River -~ Municipal Utilities 13069 Orono Parkway • P.O. Box 430 Elk River, MN 55330-0430 February 24, 2009 To: Elk River Municipal Utilities Commission Jerry Takle Jerry Gumphrey John Dietz From: Vance Zehringer Subject: Jackson Street Water Tower Phone: 763.441.2020 Fax: 763.441.8099 Elk River Municipal .Utilities has given the Heritage Preservation Commission until Sept 2009 to come up with a plan to save the Jackson Street Water Tower. Recently, more activity/interest has occurred in preserving this land mazk, so we did another examination of the structure and made more inquiries to more accurately assess the costs associated with preserving it. Attached is a lab test result performed by Corrosion Control consultants & Labs, subcontractor to KLM Engineering, Inc, which shows the presence of lead based paint. Initial cost estimates were 25K for touch-up painting and SOK to completely repaint the structure. That cost is now estimated to be 128K because the level of lead requires sand blasting to bare metal, and that means draping the tower and disposing of the paint as hazazdous material.. Repainting every 20 years is required. Elk River Municipal Utilities has budgeted 35K in 2009 to demolish the structure. No new estimate has been made to determine if that is adequate to cover demolition now that the structure is considered hazardous! A power point presentation revealing the present state of the structure will be available at the Commission meeting should you wish to review it. ~ ! ~ `~ /,. i w~~' f h w ~r" ~~ ~}_ ~' .,>. ~ ~ ~ , k,;~'M~~ k ' y QT} - tii~. ~ 9{ ~/' ~ ` ~!1' ~ mob, :? , .w..~ } J~".1 i~ ~ ~. ~' 1 ' 4 ~5 z ti- r _ ti ~a i ~ „~ r, fi Quad r `t: ~_ ~I i t i I~ ~~ '~ g~ f ,: s KL11~I E~g~n~eering, Inc. n.7.'d^' ry Est ~~-si ~~ . www.klmenaineerino.corn May 5, 2008 Mr. Bryan Adams, P.E. General Manager Elk River Municipal Utilities 13069 Orono Parkway Elk River, MN 55330 RE: Lead Test Results, Jackson Street Tower, Elk River Municipal Utilities. KLM Project No. MN 2504. Dear Mr. Adams; Thank you for the opportunity to assist you with the testing of the paint chips on the above referenced project. Seeing as how I seem unable to email you I have attached the test results from Corrosion Control Consultants and Labs, Inc. which show that the exterior paint is classified as lead-based paint. The two (2) samples test at 0.49% and 1.2%. Minnesota classifies lead based paint as any coating containing 0.50% or above. Given the potential for error in sampling and results slightly lower then actual, you have paint that should be considered as lead-based paint. The Chromium content is not high enough to cause problems. Please feel free to call me to discuss any questions you may have Sincerely, KLM Engineering, Inc. Jack R. Kollmer President /Principal JRK/ls C:UsURKVNN2504 Elk River Lead Test Results OS-OS-OB.doc 01/27!2009 11:16 6169408139 CCCL MI PAGE 02 CORROSION CO1~ ~ ROL CONSULTANTS & LABo, INC. a GPI company ANALYTICAL I;ATORATORY REPORT firiday, May 2, 2008 Pago 1 of 1 CUSTOMER: KLM Engineering, Inc. DATE RECF)<VED: Tuesday, April 29, 2008 PO Box 897, 3394 Lake Elmo Ave N PO/PROJECT #: MN 2504 Lake Elmo, MN 55042 SVBM><'l"l'AL *: 2008-04-29-009 LAB NUMBER: M28892 Sampled Dy: City Date Sampled: Friday, April 18,1008 Job Location: Elk River, MN Sample DcscripHo^: Paint Chips Semple IdantlgaSaa: 1- 3attom- Exi'arior Preparation Method: FPA 600/K 93/200M-P (Total Metals in Paint Chips, Sonication) Analysis Method: EPA ti010II (ICP-AES Method for Deternunadon of Metals) Date AnaFyud: Thursday, May 1, 2008 RI;PORTAYG £1.1;M1rlYl' R,~SU>r fbv~rcinht) )<,1H11x08T,) Lead 0.49 % 0.0050 _ Chramiam 0.06 % 0,0013 LAB NUMBEI;t: AAZ8893 Sampled By: City Date Sampled: Friday, April 1$, 20A$ .bb location: Elk Rivet. IWd 8ampic Description: Paint Chips Sample Identification: Z- Top- CsJerior I'reparattow Method: EPA 600/R-93/200M-P (Total Metals in Isaint Chips, Sonication) Analysis Method: FAA 6010B (ICP-AES Method for Determination of Metals) Date Analyzed: Thursday, May 1, 2008 REPORTING EI.EMt;lV1' RESULT f'bv weleht) LIMiT (1tL) Lead l.Z % 0.0050 Chromium 0.33 "/° 0.0013 % Unless otherwise notexl, the condition of each sample was acceptable upon receipt, all laboratory quality control requirements were rnet, and sample resuUs have sot beet adjusted baye~d1 ion, ~~i~e~ld blank or other analytical blank results, Tests Reviewed By: Megan Colwell, Senior Chemist ~""~"''"` C~ dual w es and air; and in the Industrial Hyg~one Pro ~ _~ tnctals in air. -rats rcpon sh not be rep aced except ii, without wr en approve o CC L. lndlvidual sample results relate only to the sample as receivod by the laboratory 4403 Donkey CT SE • Kentwood, MI 49512-4034 • (616) 940-3112 • www.ccclabs.conn • www.gpinet.com