Loading...
5.5. SR 07-22-1996ity of AGENDA ITEM 5.5. iver TO: FROM: SUBJECT: MEMORANDUM Mayor and City Council Sandra Thackeray, City Clerk ~! July 19, 1996 Furniture Proposal From Facility Systems for Modification of City Offices INTRODUCTION: The City Council was recently informed of the need to restructure some of the City offices. The purpose of restructuring is to separate the building and zoning departments from the planning department. It is felt that there is too much congestion and confusion at the planning/building window, especially with the number of building permits that are issued on a daily basis. PROPOSED MODIFICATIONS: Separate the planning department from the building department. The building department will remain where it is and the planning department will move to the administration/finance section of city hall. It is proposed to build four additional free-standing workstations. The workstations will accommodate the planning secretary, the planning assistant and the planning intern. This will leave one free workstation. Move the city planner and city engineer offices directly across from the workstations. The city planner's office will be furnished with Herman Miller furniture and fixtures. Furniture and fixtures from the Economic Director's office will be used to furnish the city engineer's office. The reception area will be modified to accommodate people who request assistance from the planning department. These people will be greeted by the city receptionist who will then contact a planning employee to come up to assist the individual. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 Staff mailboxes will be moved from the front reception area to the copy room. With the addition of a planning window, the reception area will be more congested. To eliminate confusion in this area, it is proposed to move the mailboxes to the copy room. Th~ere will be an additional work area adff~d to the building department to accommodate the housing inspector. It is also proposed to move Paul Steinman's furniture to an empty office for the City Engineer and to re furnish Paul's office with Herman Miller furniture from facility systems. PROPOSED COST: The proposal received from Facility Systems for the above modifications is as follows: PROPOSED MODIFICATION SELL PRICE LIST PRICE PLANNING DEPARTMENT (consists of constructing four modular offices, equipment, lighting, electricity, and office furniture) $17,551 $43,841 COPY ROOM. (consists of moving mailboxes from reception area to copy room) 657 1,557 DIRECTOR OF ECONOMIC DEVELOP (consists of furnishing office) 2,027 4,819 RECEPTION AREA- (consists of adding an area to receive public for planning assistance) 1,501 2,988 BUILDING AND HOUSING (consists of adding a work station and furniture for housing inspector) 1,554 3,341 CITY PLANNER (consists of furnishing office) 5,047 11,433 TOTAL ~ 67.979 Staff has been working with Facility Systems on the above proposed modifications. Facility Systems offers the Herman Miller line of modular furnishing through the State Purchasing contract. By working through the State Purchasing Program the City can avoid the bidding process and yet can be assured of receiving quality furnishing at a very reasonable price. Council should note that the majority of the cost for these modifications is for the addition of four modular offices. This includes furniture, fixtures, walls, electrical work and installation of all furniture, fixtures and equipment. In essence the city is constructing 4 new offices, furnishing 7 workstations and modifying two workstations. If the city was not enrolled in the State Cooperative Purchasing contract, these modifications would cost $67,978.93. Staff feels that city is receiving an excellent quality of furniture for a very good price. Council should also note that the Herman Miller furniture is the furniture that was installed in the city offices during the time of original construction. Funding for this anticipated expansion of office space was planned during the initial building of the city hall. Staff recommends that Council authorize the expenditure of funds to complete the proposed modifications as stated in this memo. COUNCIL ACTION: Council motion to authorize the expenditure of funds to complete the proposed modifications as stated in this memo. s:\council\furnit.doc