Loading...
6.3. PCSR 08-14-2006~i City of Elk .~-^ River City of Elk River Item Number REQUEST FOR PLANNING COMMISION 6.3 ACTION Agenda Section Meeting Date Prepared by Plannin Items Se tember 14, 2006 erem Barnhart, Plannin Mana er Item Description Reviewed by CU 06-24 3 way ro erties Location 16112 Jarvis Street NW Introduction The applicant seeks approval to create a fenced in enclosure for the purposes of outside storage. Attachments • Request for Action • Location Map • Memo from City Engineer • Memo from Environmental Administrator • Correspondence from applicant • Site plan • Staff proposed site plan Action Requested Staff is recommending the Planning Commission recommend approval with the conditions as outlined. Planning Commission Action Motion by Second by vote Follow Up Page 2 Kober/ 3-way excavating Zoning: I2 -Medium Industrial Land Use: Medium Industrial Adjacent N - I2 -Medium Industrial Adjacent N -Medium Industrial Zoning: E - I2 -Medium Industrial Land Use: E -Medium Industrial S - I2 -Medium Industrial S -Medium Industrial W - I2 -Medium Industrial W -Medium Industrial Site Area: 4.79 acres Parking: Required: 7 stalls* Proposed: 8 stalls Landscape: Required: 25 overstory; 12 ornamental; 13 deciduous Proposed: 0 overstory; 0 ornamental; 0 deciduous Conforms: Land Use Plan -Yes Zoning Code -Yes Subdivision Code -Yes, with conditions 60 Day Rule: Action must be taken on this request by November 5 , 2006 Overview Kober/ 3 way properties are proposing to create a fenced in area to serve as outside storage at property located on 162"d Avenue. The applicant is not proposing a new building or building addition, and will use the existing building on site. Proposal The applicant is proposing to construct a 6 foot high, chain link fence around the rear of the property to create the outdoor storage area. The attached site plan shows the location of the proposed fence. Staff has a couple of suggestions based on the proposed fence location. The fence and storage area appears to encroach into the required front yard. A setback of 30 feet from the front property line must be maintained. The fence also appears to encroach into the required 25 foot setback adjacent to wetlands. The fence and ground treatment should be removed from this area. No changes to the building are proposed. S:\PLANNING\Case Files\2006\CUP\CU 06-24 Kober-3 Way Prop\Staff Report.doc Page 3 Kober/ 3-way excavating Parking and Circulation Access. Access to the site will be provided off of a newly extended 162nd Avenue, from Jarvis street. The plan shows three access locations. Staff would recommend that the accesses be adjusted to permit only 2. Parkin. The parking requirements for the property are based on the amount of office and warehouse/ garage space. It is estimated that the office is about 1000 square feet, and the garage/ warehouse is the remaining balance. The parking requirements, using these assumptions, are as follows: Office 3/1000 square feet 3.33 spaces Garage/warehouse .5/1000 square feet 3.33 spaces, or 7 total spaces It is suggested that the parking lot and access in the front yard area be paved. Landscaping The applicant proposes the introduction of ivy to the fence, which, once established, will provide natural screening for much of the year. In the winter, with the leaves gone, the matting of the vines will help provide some screening, but will not be as effective as it will be during the growing seasons. No other landscaping is proposed. The landscaping requirements for the subject property include the need for 50 trees. Staff would recommend that 8 over story trees be added to the front yard of the property, and 17 evergreen trees be added along the outside of the fence to provide screening. This will constitute '/a of the landscaping requirements, which appears to be consistent with the scale of improvements proposed. Grading, Drainage and Utilities No new utilities are proposed. It is understood that the property uses the well of the adjacent structure. If this is the case, the applicant should drill a new well on their property for their use. The attached engineers comment letter addresses grading concerns, which, in summary, suggest berming to ensure the surface water drains to the pond, rather than the wetland. Other comments are outlined in the memo, and should be addressed. Outside Storage The use of secure outside storage areas is critical to some businesses, particularly those that use large machinery and work with materials that need not be stored indoors. However, this need is balanced with preserving the neighborhood character. A recent site inspection found several apparently non business related items on the property. It is suggested that the boats, food trailer, modular home, and inoperable vehicles currently stored on site be removed, and the outside storage be preserved for equipment necessary for the operation of the business. S:\PLANNING\Case Files\2006\CUP\CU 06-24 Kober-3 Way Prop\Staff Report.doc Page 4 Kober/ 3-way excavating Standards for Issuance of a Conditional Use Permit (Section 30-654) The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: Weill not endanger, injure or detrimentally affect the use and enjoyment of other propery in the immediate vicinity or the public health, safety, morals, comfort, convenience orgeneral welfare of the neighborhood or the city. With proposed conditions/ stipulations, the adjacent properties would not receive any negative impact. 2. Dill be consistent avith the comprehensive plan. The use is consistent with the comprehensive plan, which guides the property for medium industrial. 3. 1Vill not impede the normal and orderly development and improvement of surrounding vacantproperty. The preservation of the street right of way means the surrounding area will develop independent of the subject request. 4. 1Vill be served adequately by and will not adversely affect essential public facilities and services including streets, police and fire protection, drainage, refuse disposal, water and sewer systems, parks and schools; and will not, in particular, create tra~c congestion or interference with tra~c on adjacent and neighboring public thoroughfares. With the development of an on site well, and adjacent public street, there should be no other impacts of essential public facilities. 5. Will not involve uses, activities, processes, materials, equipment and conditions of operation that avill be detrimental to any persons or properly because of excessive tra~c, noise, smoke, fumes, glare, odors, dust or vibrations. Based on the review of the site plan, it does not appear that the neighboring properties will be subjected to activities that are of a negative nature, including noise, smoke, fumes, odors, etc, provided the screening and setback conditions are adhered to. 6. bill not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. The wetland buffer as required will help preserve this natural feature. There are no other known natural, scenic, or historic features of the property. 7. lYlill fully comply with all other requirements of this Code, including any applicable requirements and standards for the issuance of a license or permit to establish and operate the proposed use in the city. It does not appear that the applicants axe wishing a variance from any requirement of the city. If denial of such a permit should occur, it shall accompany recommendations or determinations by findings or a report stating how the proposed use does not comply with the standards set forth in Section 30-654. Recommendation S:\PLANNING\Case Files\2006\CUP\CU 06-24 Kober-3 Way Prop\Staff Report.doc Page 5 Kober/ 3-way excavating Staff recommends that the Planning Commission recommend approval of the Conditional Use permit and improvements outlined in plans dated September 7, 2006 with the following conditions: 1. All comments of the City Engineer dated September 5, 2006, shall be addressed. 2. The fence and outdoor storage area preserve the required 30 front yard setback from 162nd. 3. The fence and outdoor storage are preserve the required 25 feet no touch, mow area adjacent to the wetland. 4. Only 2 accesses onto 162"d be permitted. 5. At minimum, the front drives within the right-of--way be paved with either concrete or asphalt. 6. A landscaping plan be developed that includes 8 overstory trees in the front yard, and 17 evergreen trees added along side the fenced area 7. The property includes a well for on site water usage. 8. Only equipment and material necessary for the operation of the business may be permitted to be stored in the outdoor storage yard. No boats, food trailers, modular homes, or inoperable vehicles. 9. A letter of credit in the amount of $50,000 shall be provided as a guarantee for the completion of the site improvements. 10. Fire department comments shall be addressed, including extending water main to loop within the site, and adding a third hydrant to the west end of the 185`'' Avenue water main. S:\PLANNING\Case Files\2006\CUP\CU 06-24 Kober-3 Way Prop\Staff Report.doc ~~~ . ~~ aver MEMORANDUM TO: Jeremy Barnhart, Planning Manager FROM: Terry Maurer, City Engineer DATE: September 5, 2006 SUBJECT: Kober Excavating/3-Way Properties As requested, we have reviewed the site plan for the Kober Excavating improvement to their property. Based on our review and comments received at the staff review meeting, we would offer the following comments: 1. Any improvement to the site will be required to follow the newly adopted Wetland Buffer Ordinance. Generally, the ordinance requires a 25-foot setback from the wetland boundary with no cut and no grading in this area. This would mean the hard surface, fencing and ponding be shown on their grading plan needs to be pulled back from the wetland boundary. There is also a requirement for signing of the wetland buffer area. 2. Given the type of use of the property and the proximity to the wetland area, it will be critical that the hard surfaced area is graded to drain towards the pond and not towards the wetland boundary. I would suggest that a minor amount of berming at the wetland buffer be included into their site work to ensure that there will be no drainage going directly into the wetland. 3. It is my understanding that they intend to use Class V gravel or similar type material for the area indicated hard surface. I am aware of other industrial sites in the City that have been allowed to use gravel surfaces for outside storage of equipment and materials. However, I have not verified that the City ordinance allows this type of surfacing in the zoning at the Kober site. 4. One of the suggestions received at the staff review meeting is that the applicant submit a general list of equipment and materials that would be stored on the site. 5. Another issue raised at the staff review meeting is a fence over six feet high will require a building permit. Therefore, the type of fencing should be detailed on the final plans. If it is over six feet tall, the building permit needs to be applied and general building permit requirements need to be followed. 6. Under a separate contract, 161` Avenue will be constructed this year past the Kober site. It is unclear from their site plan how they will deal with the area between the newly constructed street and the start of their future hard surfaced (gravel) area. This should be a green area with gentle berming to ensure that there is no ability for gravel to be washed to the new street. 7. Storm drainage calculations have been submitted, reviewed and approved. 8. A NPDES permit will be required along with a Storm Water Pollution Prevention Plan (SWPPP) in an 8 1/z" x 11" format signed by the engineer, contractor and owner. If you have any questions regarding any of these comments, please contact me. S:\PLANIVING\Case Files\2006\CUP\CU 06-24 Kober-3 WayProp\09 OS 06 Engrs memo.doc fiver MEMORANDUM TO: Jeremy Barnhart, Planning Manager FROM: Rebecca Haug, Environmental Administrator DATE: September 5, 2006 SUBJECT: Koberl3 Way Properties -Office Building, CU Ob 24 The above-mentioned site will need to adhere to the city's recently passed wetland buffer ordinance. The ordinance requires a 25 foot buffer strip from the delineated wetland boundary with monumentation at 200 foot intervals along the edge of the wetland buffer strip. Each monument shall state "Wetland Buffer: Under the City Code, no mowing, clearing or removal of vegetation in the buffer area is allowed. Call the City of Elk River for more information." In this area, no mowing, clearing or removal of vegetation will be allowed. Also, no fences are allowed to encroach in this area. If you have any questions, please feel free to call me at 763-635-1068. Thank you. 16112 Jarvis Street N. W Elk River, Minnesota 55330 3 Way Properties, LLC. City of Elk River 13065 Orono Road Elk River, MN. 55330 Mr. Jeremy Barnhart RE: Conditional Use Permit Application Land Use Application Form Dear Mr. Barnhart; Office: 763-441-2853 Fax: 763-421-9204 email: kober@pclink.com SATE RECEIVED --~..~1T -_____ September 6, 2006 I have received your letter dated September 5, 2006, regarding the conditional use permit application for the existing building at 16112 Jarvis Street NW. Following are my responses to your questions/concerns: 1: Regarding the recently passed wetland preservation ordinance. I am understanding that this ordinance is for new construction parcels only. Ours is an existing building and we are just wanting to correct the lot, not build on it, so this 25 foot wide no touch zone would not apply. 2: I have penciled in the proposed fence line for our property on the enclosed copy of the plan. I have included pictures of surrounding property fences which we are planning on using similar. We are intending on using ivy as the privacy screening. 3: The storage would be used mainly for materials used in our business including but not limited to pipe, fittings, equipment and trailers etc. If there is any other items needed or any suggestions you may have please contact me at 763-441-2853. Thank you. Sincerely, Glen Haugen Enc: Cc: file The intention of use for property located at 161 ] 2 Jarvis Street NW, Elk River is as follows: Offices, shop and outside storage for construction company. Hours of operation: M-Sa 6:00 a.m. to 8:00 p.m. Number of employees on the working on the premises 5, total of 25 employees working on various work sites throughout the metro area. Number of parking stalls existing: 10 Number of parking stalls additional: 6 Signage: proposing sign to be on the front of the building, wood or metal material approximate size to be 4'x8' Rental space for future outside storage: There is no new building to be considered in this application. There are no tree removals involved with this application, there is however a large amount of grading to be completed as stated on the site plan and grading plan that is on file. We have stockpiled a large portion of the material onsite that will be used to complete this. Several surrounding properties have this type of land usage. Examples: E. H. Renner Well, EJM Pipe, All City Sweeping, Collins Brothers Towing. For full utilization of the property the following needs to be completed: Site Grading which is on file with the city Storm Pond which is on file with the city Landscaping, we need to know the city's criteria for preparing a plan Fencing which is on file with the city We would like to complete the grading portion in connection with the construction of 161st Ave which runs on the south side of our property. It is our understanding will be completed this summer. Site plan grading to be completed fall 2006 Construct a storm pond fa112006 Class 5, fence and landscaping to be completed in 2007. We need to have the City of Elk River's criteria for the landscape portion. These are the items we would like to have considered in the Conditional Use Permit Application and Land Use Application. 3 Way Properties, LLC 16112 Jarvis Street N.W. Elk River, Minnesota 55330 Office:763-441-2853 Fax:763-421-9204 .~x0* A ~ ~ Ct1 n A ~ A ~ ~'' i ~ ~ A ~ ~ o co eov°'~~?~~ f ~ ~ ~ ~ ~ x ~ l ~ ~( ~ ~ N ~N ~ fTl N N I yy~ma zn H ~ ~g~o yz :~ ~ ~~ :~ ~ ~~ ~~~`~-~~ -V~o~ ~~o o See°e~~~ a~~8 "p Y~'" a"~ s'~~oo~~~e y zr~ y - g~ ~ Si 2~ "C boa S~ mB~~e .;G ~~g SF __ - - .. 3" MAGNETIC A F --r12 Z~Z~ m0~ s ~ ~ °~~~ $~~ se e~ ~$~ ~ o ~g~ ~ ~£~~ E~ g6 E °v$ Pis rg y << ~mn m0 ~yp~O 9NA0 O ~ ~P 2Y ~~ OAS 3 ~ ~} } E 9S ~~~ ~ s~ x s ~~ aGm~ in a ~ ~~ ~$~~ ag -~- ~ 'V- y f ~ 4 s ~~ 1 b~ I_ F&t~ ^3~ I I ;: j ICI I;i~ I:~ IV m I ~.. I t1 I I :. 1 I I " ....~ ~ ~ I 500.54 20~'IV I F~~ 698.34 't°,~_ ~. ~ \ •" • , :, z enu , eo~.n an as a +A`~,Fy ..... ; , _.. [Q~ ~y „E /~ ~'~,~ .698. f3 29972 GMAT{ ''" '1 2a \ ~ '~i 4'~ ~ ~' p, ~~ 4~, 9 \ \ 'a 2':vt `f'or Y' "ri `.°~~~ . i ~ ~ // - ~ ~ / \\ .~ "1' (b N ~] Q ~ o Gca ~ -`_ / 1 8 ~ i .. ~ ~, _ _ arm - £ I t o_ --wee----~f e ---~as7g-------~ L-- ~ 9a 949A9 _ ~ ~,~ j ~ ~ l " I I ~ X III N I N I I a~i' oo ~ '~ Om~Z nA G~..C 'p NS'N~~]^~Qo,..C icy om m ~~ °- a,2,' _ Qe='Gy r~~ mAi 24 r'~. oe m'f u$• co3u'"i ~Ny GF ss _ o=n o_ n`~~~~ ~Z ~ .. n ^e~m MAGNETIC 11nn ' c n H~ sN Cy vsA m ~ ~~ o ~p @ Q °s O-O yA ~Lt ~ e-} Sg 5° s~ n ~ D y A ~g~ ~ ~ y~ ~~ 2x 3a ;a ~ '^ ~ rho ~A"° °p~c $ ~ s a~ v~ x O ~~ v Uj , ~a a' ~ m n ZN