ERMUSR MEMOS 03-10-2009Elk River Municipal Utilities 13069 Orono Parkway • P.O. Box 430 Elk River, MN 55330-0430 March 6, 2009 To: Elk River Municipal Utilities Commission John Dietz Jerry Gumphrey Daryl Thompson From: Vance Zehringer Subject: Miscellaneous Phone: 763.441.2020 Fax: 763.441.8099 Sales of electricity for February 2009 aze up 12% over a like period last yeaz. Sales of water for February 2009 aze down 8.5% over a like period last year, but sales year-to-date aze up 2.9%. Discussions with potential power suppliers has not progressed appreciably over the last two weeks pending fiuther input from our present power supplier, Connexus Energy. The Confidentiality Agreement has been changed to eliminate reference to the City of Elk River and has been signed and forwarded to Connexus Energy. A meeting has been scheduled on Mazch 9, and if anything of any substance results, that information will be presented in the closed meeting. We did generate anon-binding Letter Of Interest with Central Minnesota Municipal Utilities Agency (CMMPA) to keep us in the loop for a share of the Big Stone II Project in case we decide that is in our best interest. A copy of that non-binding Letter Of Interest is attached. CMMPA continues to be interested in partnering with us in becoming our full requirements power supplier once our contract with Connexus Energy expires. Contacts with Minnesota Municipal Power Agency (NIlVIPA) have failed to produce anything meaningful -they aze not interested in adding additional members at this time. As mentioned at the Feb Commission Meeting, Wright Hennepin Cooperative Electric Association (WHCEA) has decided not to make us an offer because Basin Power Cooperative has made a decision not to sell power to any municipals. They have been removed from the list of potential power suppliers. Finding a suitable wholesale power supplier may be more difficult than originally perceived! Staff was directed to secure bids for inspecting the integrity of the Jackson Street Water Tower. To date, KLM Engineering and SEH Engineering have expressed interest is performing same for us. The KLM bid has been received, but we are awaiting a bid from SEH. Both bids will be presented for your consideration at the April commission meeting. Some pertinent information was included in the cover letter accompanying the KLM bid. That cover letter is attached. The Contract for a communication antenna on the Gary Street water tower is in the fmal stages, and we hope to be able to provide the finished product for action at the March 10 Utilities Commission Meeting. An Annual Report to the Elk River City Council was presented at their March 2 meeting. A copy of same is attached for your perusal. J~ Elk River ML1111C1p~ Ut111t1eS 13069 Orono Parkway • P.O. Box 430 Phone: 763.441.2020 Elk River, MN 55330-0430 Fax: 763.441.8099 March 5, 2009 To: Bob Schulte, CEO Central Minnesota Municipal Power Agency 459 South Grove Street Blue Earth, MN 56013 Subj: Expression Of Interest In Big Stone II Project This letter shall serve as an expression of interest by Elk River Municipal Utilities (ERMU) for participation in the Big Stone II Project at a level of approximately 30 megawatts. We understand that this expression of interest is non-binding, but is meant to start a process if mutual due diligence, data gathering, and information exchange between ERMU and Central Minnesota Municipal Power Agency (CMMPA), and the Big Stone II Project. It does not represent a commitment by ERMU, CMMPA, the Big Stone II Project, or any other party to actually participate in the Big Stone II Project, or that participation would be offered to ERMU. Sirnc/e~ely, (/ 11 'Q/lte~ ~ Vance Ze ger General Manager, ERMU Copy: Troy Adams, ERMU Zehringer, Vance =rom: Shawn Mulhern [smulhern@klmengineering.com] Sent: Thursday, March 05, 2009 12:46 PM To: Zehringer, Vance Cc: Laurie Sylte Subject: Proposal for Jackson Street Water Tower Inspection Attachments: Elk River, MN MU 100,000 Rivited Tower.doc Vance, Please review the attached proposal. As discussed the rough estimate for a demolition would be in the range of $25,000-$50,000. A discussion with my partner Jack Kollmer regarding the disposal of scrap metal with lead paint is still not regulated. In the future we do expect to see this will change into a law. The cost of this would be very difficult for KLM to estimate. Again the removal could be done at ground level with Blastox or Pre-tox. The owner will still be on the record for this material from cradle to grave. If it does get scrapped out there is a transfer of ownership. After KLM has evaluated the tower we will be able to give you a better idea as to the cost effectiveness of taking it down or keeping it and repainting. In our enclosures I have include the MPCA rule for lead paint removal. Please call me with any questions. Shawn A. Mulhern Marketing Manager KLM Engineering, Inc. 651-773-5111 Phone 651-773-5222 Fax 612-817-9899 Cell smulhern(a~klmengineerin .com vwvw.klmen ineerin~ c~ DISCLAIMER: The information in this message is confidential, may be legally privileged, and is intended for the sole use of the adds Access to this message by another person is not permitted. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or committed in reliance on it is prohibited and may be unlawful. If you have received this e-mail by mistake, please e-mail the sender by replying to this message, and deleting the original and any printout thereof. 3/5/2009 3/5/2009 3/5/2009 3/5/2009 3/5/2009 3/5/2009 3/5/2009 3/5/2009