Loading...
6.1. ERMUSR 05-10-2007~i Elk River -~ Municipal Utilities 13069 Orono Parkway F.Ik River, MN 55330 April 17, 2007 To: Elk River Municipal Utilities Commission Jerry Takle Jerry Gumphrey Jim Tralle From: Bryan Adams Subject: Annual URGE Tests phone: 763.441.2020 Fax: 763.441.8099 Elk River Municipal Utilities operates and maintains 4 diesel generation units at our power plant. These units are contracted to Great River Energy through a Power Transaction Agreement at the current price of $2.75/kw/month based upon the proven capacity from the annual URGE test. The current contract expires October 31, 2003 and is extended on an "evergreen" basis. The attached letter reflects this year URGE test results. The URGE test results have steadily increased the past few years due to more maintenance and better training. Again your staff of Mike Price, Adam Freiberg, and Steve Ziemer did a great job performing this URGE test. The capacity results from this test will result in $349,008 in annual payments from Great River Energy. This years URGE test results probably reflect the ultimate capacity of this 4 engine facility. Although each engine may fluctuate in its output the aggregate output will change little or may decrease overtime. ELK RIVER MUNICIPAL UTILITIES GENERATION REPORT URGE TEST RUN for 2007 DATE 4/11/2007 TIME 7:30 OUTSIDE TEMP. 40 Kwh ENGINE FUEL OIL ENGINE TIME METER HOURS METER GAS METER Start 11:30 Stop 386.16 Stop 375.3 Stop 1930 #1 Stop 12:30 Start 379.84 Start 373.1 Start 1780 Engine #1 Totals Ur a Tested at 632 Kw for 1 Hr Ind. MW 0.66 Mwh 0.632 Hrs. Run 2.2 Fuel Oil 75 Net Generation Mwh 0.632 Start 12:30 Stop 477.27 Stop 327.2 #2 Stop 13:30 Start 470.79 Start 325.9 Engine #2 Totals Ur a Tested at 648 Kw for 1 Hr Ind. MW 0.68 Mwh 0.648 Hrs. Run 1.3 Fuel Oil 75 Net Generation Mwh 0.648 Start 10:00 Stop 461.84 Stop 13406.1 Stop 656576 Stop 876401 #3 Stop 11:00 Start 427.2 Start 13402.7 Start 656003 Start 876401 Engine #3 Totals Ur a Tested at 3,464 Kw for 1 Hr Ind. MW 3.7 Mwh 3.464 Hrs. Run 3.4 Fuel Oil 573 Gas 0 Net Generation Mwh 3.464 Start 9:45 Stop 362.3 Stop 17581 Stop 9169 Stop 274323 #4 Stop 10:45 Start 303.98 Start 17577.9 Start 8281 Start 274323 Engine #4 Totals Ur a Tested at 5,832 Kw for 1 Hr Ind. MW 6 Mwh 5.832 Hrs. Run 3.1 Fuel Oil 888 Gas 0 Net Generation Mwh 5.832 Engine Run Totals Urge Mwh 10.576 Fuel Oil 1611 Gas 0 7-24-2003 Load Profi le Spreadsheet -- Site: - Power Plant 1 _ _ _ - ~- ~ i - ng Date R - ----- --- 4/10/2007 - 4/10/2007 -- - Prima Q Y = - uantities -- - - - ~ __ I __ _ __ _ Energy _ __ i Date Time kWh d 4/10/2007 7:00:00 AM - 0 4/10/2007 - 7:15:00 AM 0 _ _ _ _ _ _ _ -- -- 4/10/2007 7:30:00 AM 0 ' -__ -~ 4/10/2007 7:45:00 AM _ 0 ~ 4/10/2007 8:00:00 AM _ 0 _ _ _ _ 4/10/2007 _ 8:15:00 AM 24 -- ~-- -- ~ - - ---- 4/10/2007 8:30:00 AM 760 4/10/2007 8:45:00 AM 784 __ 4/10/2007 9:00:00 AM 768 4/10/2007 9:15:00 AM 784 ---- __ 1 4/10/2007 9:30:00 AM -- _ 856 4/10/2007 9:45:00 AM i 1216 _ ' _ - 4/10/2007 10:00:00 AM ~ 1464 __ _ __ , 4/10/2007 _ 10:15:00 A M _ ' 1456 6 r- - 4/10/200 7 _ 1 0:30:00 AM ~145 #4 U r e _ _ _ 4/10/2007 . 10:45:OOAM I 1 -- t -- - --- ---- _ 4/10/2007 11:00:00 AM _ 21 5832 kW 99 _ _ _ _ 4/10/2007 11 15:00 A _ 72 ~ + 4/10/2007 . ~ 11:30:00 AM ~ __ _ 112 _ ~, 4/10/2007 11.45.00 AM - - - 160 - _ 4/10/2007 12:00:00 PM 160 i 4/10/200_7 12:15:00 PM 152 i ~ ~ Urge __ 4/10/2007 _ 12:30:00 PM 160 _______ 4/10/2007 -- 12:45:00 PM - 32 - _632 kW --- 4/10/2007 1:00:00 PM 0 _ 4/10/2007 - ----- ___ 1:15:00 PM -- ------- ~ 0 ~ _ ~ _ /1.0/2007 4/10/2007 4/10/2007 1:30:0_0_PM ~ 1:45:00 PM 2:00:00 PM 0 ~ ~ _ 0 0 - _ _ l~ f ~ I ~_ __ _ _ 4/10/2007 ---------- 2:15:00 PM __ 0 _ __ _ ---- -~ - -- _ - - - I --, __ -- -- - -~ -- ---- - - ~ - - - I --- -- _-- ~- Load Profile S readsheet - - Site: Power Plant Date Rang 4/11/2007 - 4/1 1/2007 _ Primary Q uantities Energy Date Time kWh d 4/11/2007 7:00:00 AM 0 4/11 /2007 7:15:00 AM 0 4/11/2007 7:30:00 AM 0 4/11 /2007 7:45:00 AM 0 4/11/2007 8:00:00 AM 0 4/11 /2007 8:15:00 AM 352 4/11 /2007 8:30:00 AM 408 4/11/2007 8:45:00 AM 472 4/11/2007 9:00:00 AM 464 4/11/2007 9:15:00 AM 464 4/11 /2007 9:30:00 AM 592 4/11 /2007 9:45:00 AM 592 4/11/2007 10:00:00 AM 728 4/11/2007 10:15:00 AM 864 4/11 /2007 10:30:00 AM 872 4/11/2007 10:45:00 AM 864 #3 U r e 4/11 /2007 11:00:00 AM 864 4/11/2007 11:15:00 AM 592 3464 kW 4/11!2007 11:30:00 AM 224 4/11 /2007 11:45:00 AM 0 4/11/2007 12:00:00 PM 0 4/11/2007 12:15:00 PM 0 4/11/2007 12:30:00 PM 80 4/11/2007 12:45:00 PM 160 4/11/2007 1:00:00 PM 160 4/11 /2007 1:15:00 PM 168 #2 U rg e 4/11/2007 1:30:00 PM 160 4/11/2007 1:45:00 PM 16 648 kW