Loading...
3.0 ERMUSR 10-09-2007ELK RIVER MUNICIPAL UTILITIES REGULAR MEETING OF THE UTILITIES COMMISSION September 11, 2007 Members Present: Jerry Takle, President; Jerry Gumphrey, Vice Chair; James Tralle, Tryzstee Staff Present: Bryan Adams, General Manager; Glenn Sundeen, Line Superintendent; ~' David Berg, Water Superintendent; Theresa Slominski, Finance Director/Office Manager; Troy Adams, Engineering Manager; Judy McSpadden, Recording Clerk 1. Call meeting to order September 11, 2007 President Jerry Takle called the September 11, 2007, meeting to order 2. Consider Utilities Agenda James Tralle moved to approve the September 11, 2007, Utilities Agenda. Jerry Gumphrey seconded the motion. Motion carried 3-0. 3. Consider Consent Agenda Jerry Gumphrey moved to approve the Consent Agenda as follows: August Check Register August 14, 2007, Minutes Financial Reports James Tralle seconded the motion. Motion carried 3-0. 5.1 Staff Up-dates Bryan Adams reported on the progress of the Northstar Access wireless Internet system. Currently they have approximately 50 customers connected with the capability of 150. MMUA's summer meeting covered the time of use metering that will be implemented in the future. MMUA will be hiring someone to coordinate the CIP programs for the municipals'. Glenn Sundeen informed commissioners of a primary outage due to a dead tree falling on overhead electric lines. Secondary outages were due to old cable failing and squirrels. The current rebuild projects were discussed. James Tralle asked what happens to the old cable, Glenn responded it was left in the ground and abandoned. Troy Adams is documenting the old cable for mapping and future locating. Jerry Gumphrey felt that the old cable should be removed. Glenn responded that it would be very costly. Troy Adams reported 12 Security system installs with numerous service calls. The V~aco Substation transformer was inspected at the site and found to have some loose parts from assembly and additional loose parts laying in the bottom of the tank. This will be sent bacl~ on Friday September 14`!' to the manufacturing plant for inspection. James Tralle asked if we could ask for an extended warranty due to the issues. Staff responded that we already have a five year warranty. Jerry Takle indicated an additional extended warranty would probably,not be given. Generally problems develop in the first year of operation. Page 2 Regular meeting of the Elk River Municipal Utilities Commission September 11, 2007 David Berg updated on the water maintenance being done on the hydrants, valves, and flushing of hydrants. Theresa Slominski reviewed the deposit procedure and progress to date. The Utilities... and City have joint property and liability insurance through the MN League of Cities. The City is looking at changing the deductible on the insurance policy to a $5000 deductible instead of the current $2500. The majority of our damages are under the $2500 range and never make it to the claim filing stage. There would be a premium savings to change the policy. Also, the health insurance with Blue Cross Blue Shield will increase by 12.7% for 2008. This will be approximately $50,000 for Utilities portion and employees at $150 per year for single coverage, $300 for single plus one, and $500 for family coverage. Jerry Gumphrey would like to revisit this issue to ensure that it will not be a burden to the employee, staff responded the insurance committee made up of employees can meet to discuss the costs and the 75% / 25% split. 5.2 Review Abandoned Water Service Policy As homes are demolished or moved from a site, the abandoned water service continues to be a problem. Recently there have been a number of houses demolished on either major streets or streets that were recently rebuilt and the county or city will not issue street disruption permits to allow the owner to disconnect the water service. The county or city does not want the new street cut and damaged to remove a water service that may never leak. The utilities position is the possible contamination from the stub water lines. The major concern is finding the correct or unknowing property owner and having them fix a leak if and when one develops. Our current policy allows the property owner to post a bond, but many property owners do not want the hassle of the long term bond. City Engineers suggest having the property owner pay Elk River Municipal Utilities to take on the liability to remove the water service when it develops a leak. Discussion followed regarding the options. Jerry Gumphrey would like staff to get pricing to repair a leaking water service. This will be revisited at a future meeting. 5.3 Review Elk River Geolo~y In August Bryan Adams and David Berg attended a DNR sponsored meeting concerning water quality and quantity issues in the northwest suburbs. The main purpose was to promote the shared use (and construction cost) of a proposed surface water treatment plant in Ramsey, Minnesota. DNR wants the City of Ramsey to use a Mississippi River source treatment plant in lieu of Mt. Simon Hinkley aquifer wells. DNR is allowing Elk River to utilize the Mt. Simon Hinkley aquifer because of our pro-active conservation record and being outside the seven county metro area. Area maps of the northwest suburbs were reviewed. Elk River is on the edge of the Mt. Simon Hinkley aquifer that runs under the metro area across and into Wisconsin. If more communities tap into the aquifer, the water table in the aquifer could drop to the point of Elk River being out of water. This is why the DNR wants us to have test wells to monitor the water depth in the aquifer. Page 3 Regular meeting of the Elk River Municipal Utilities Commission September 11, 2007 6.1 Review & Consider Bid Tabulation for Well #9 Construction On September 6, 2007, bids were received for the construction of Well #9. Staff recommends awarding to Traut Companies, the lowest responsive bidder. James Tralle moved to approve Traut Companies, the lowest responsive bidder, for Well #9 construction. Jerry Gumphrey seconded the motion. Motion carried 3-0. 6.2 Review & Consider Proposed 2008 Capital Proiects The first cut of the capital budget for 2008 was reviewed. Electric construction and rebuild projects were reviewed. Staff added there is cable available in inventory for some of the projects. Water projects include painting or removing the Jackson Street tower. Staff wvas directed to look into the possibility of someone taking over the care and upkeep or removal. The Engineering and Administrative department capital budgets were also reviewed. 6.3 Review Substation & Well Electric System Maintenance In the process of compiling the proposed 2008 capital budgets, some maintenance items were found that need to be addressed. These items are building roof inspections, substation maintenance, and water treatment plant electrical inspections. Jerry Gumphrey moved to approve the inspections needed for buildings, substation maintenance, and water treatment plants electrical equipment. James Tralle seconded the motion. Motion carried 3-0. 6.4 Review Wind Power Tariff Elk River Municipal Utilities offers a Wind Power program through Great River Energy where our customers can purchase blocks of 100KWH of wind power for an additional $2.25 per month. There are approximately 197 customers on the program. The wind power rate was recently changed from $2.25 to $1.90 per block. The State Legislation previously required electric utilities to make good faith efforts towards providing renewable energy. The Renewable Energy Standard Legislation passed in 2007 changed from "good faith effort" to "shall provide a % of their total electric sales to retail customers from eligible renewable technologies". With this change from "good faith efforts" to "shall", is it ethical to promote a program where customers pay more for a product we are now obligated to provide? Consensus from commissioners is to send a letter to the customers that are on the program notifying them of this change and asking if they still want to continue. Jerry Takle moved to approve the rate change from $2.25 to $1.90 per block for wind power. Jerry Gumphrey seconded the motion. Motion carried 3-0. Page 4 Regular meeting of the Elk River Municipal Utilities Commission September 11, 2007 Other Business There was no other business. The next regularly scheduled meeting of the Ells River Municipal Utilities Commission will be Tuesday, October 9, 2007. President Jerry Takle adjourned the regular meeting of the Elk River Municipal Utilities Commission at 5:45 p.m. spectfully s bmi d, Judy Mc adden Recording Clerk