Loading...
6.2. ERMUSR 05-16-2006~/ Elk River Municip al Utilitie s 13069 Orono Parkway F,Ik River, MN 55330 May 4, 2006 To: Elk River Municipal Utilities Commission Jerry Takle James Tralle John Dietz From: Bryan Adams Subject: Annual URGE Tests phone: 763.441.2020 Fax: 763.441.8099 Ellc River Municipal Utilities operates and maintains 4 diesel generation units at our power plant. These units are contracted to Great River Energy through a Power Transaction Agreement at the current price of $2.75/kw/month based upon the proven capacity from the annual URGE test. The current contract expires October 31, 2005 and is extended on an "evergreen" basis. The attached letter reflects this year URGE test results. The URGE test results have steadily increased the past few years due to more maintenance and better training. Again your staff of Mike Price, Adam Freiberg, and Steve Ziemer did a great job performing this URGE test. The capacity results from this test will result in $346,104 in annual payments from Great River Energy. This payment is a .3$ increase over last year. This years URGE test results probably reflect the ultimate capacity of this 4engine facility. Although each engine may fluctuate in its output the aggregate output will change little or may decrease overtime. ~/ Elk River Municip al Utilitie s 13069 Orono Parkway Elk River, MN 55330 May 4, 2006 Mr. Sam Kokkinen Great River Energy Association P.O. Box 800 Elk River, MN 55330 Dear Sam; phone: 763.441.2020 Fax: 763.491.8099 The annual URGE tests were run on the diesel units under our Power Transaction Agreement on February 9, 2002 and as amended on October 30, 2003. The results were as follows: Unit Name Plate Ca acity Date Run Beginnin Time Ending Time Kwh Generated Kw Capacity 1 500 Kw 5/2/06 1:00 2:00 624 Kwh 624 Kw 2 500 Kw 5/3/06 12:45 1:45 640 Kwh 640 Kw 3 3000 Kw 5/3/06 10:00 11:00 3448 Kwh 3448 Kw 4 5000 Kw 5/2/06 9:45 10:45 5776 Kwh 5776 Kw Total 10,488 Kw If you have any questions about the above, do not hesitate to call. Best re rds, / ,~~''G` Bry{~n Adams, P.E. General Manager cc: Glen Sundeen Dave Berg Theresa Slominski ELK RIVER MUNICIPAL UTILITIES GENERATION REPORT URGE TEST RUN for 2006 DATE 5/3/2006 TIME 7:00 OUTSIDE TEMP. 51 Kwh ENGINE FUEL OIL ENGINE TIME METER HOURS METER GAS METER 5/2/2006 Start 13:00 Stop 8946.13 Stop 372.5 Stop 1650 #1 Stop 14:00 Start 8939.89 Start 371 Start 1540 Engine #1 Totals Ur a Tested at 624 Kw for 1 Hr Ind. MW 0.65 Mwh 0.624 Hrs. Run 1.5 Fuel Oil 55 Net Generation 0.624 Load Limit 5.875 5/3/2006 Start 12:45 Stop 9048.22 Stop 324.6 #2 Stop 13:45 Start 9041.82 Start 323.1 Engine #2 Totals Ur a Tested at 640 Kw for 1 Hr Ind. MW 0.656 Mwh 0.64 Hrs. Run 1.5 Fuel Oil 55 Net Generation 0.64 Load limit 5.9 5/3/2006 Start 10:00 Stop 9020.69 Stop 13380.5 Stop 653448 Stop 876397 #3 Stop 11:00 Start 8986.21 Start 13376.5 Start 652767 Start 876396 Engine #3 Totals Ur a Tested at 3,448 Kw for 1 Hr Ind. MW 3.65 Mwh 3.448 Hrs. Run 4 Fuel Oil 681 Gas 1 Net Generation 3.448 Load Limit 8.95 5/2/2006 Start 9:45 Stop 8908.15 Stop 17550.9 Stop 2874 Stop 274323 #4 Stop 10:45 Start 8850.39 Start 17547.4 Start 1863 Start 274323 Engine #4 Totals Ur a Tested at 5,776 Kw for 1 Hr Ind. MW 5.92 Mwh 5.776 Hrs. Run 3.5 Fuel Oil 1011 Gas 0 Net Generation 5.776 Load Limit 7.2 Engine Run Totals Urge Mwh 10.488 Fuel Oil 1802 Gas 1 7-24-2003