Loading...
6.2. SR 04-06-2009REQUEST FOR ACTION ver To Item Number Ci Council 6.2. Agenda Section Meeting Date Prepared by Public Works A ri16, 2009 Ter Maurer, Public Works Director Item Description Reviewed by Discussion of (3) Street Improvement projects contained in Lori ohnson, Ci Administrator 2009 Capital Improvements Program (CIP) Reviewed by Action Requested Staff requests direction from the City Council on whether or not to proceed to an informational meeting for the three street improvement projects contained in the 2009 CIP. Background/Discussion As was discussed with the City Council briefly last month, there are three street improvement projects contained in the 2009 CIP. The projects consist of (1) the Norfolk, Morton, Lowell and King Avenue neighborhood south of Main Street; (2) Railroad Drive, Freeport, Evans Avenue neighborhood south of Main Street: (3) a mill and overlay of Main Street from Lowell Avenue to Orono Road. These areas are shown on the attached three exhibits. As requested by the City Council, we have done further analysis of the three areas relative to the improvements needed, the estimated project costs, potential assessable properties, and the remaining city contribution. Based on this information, the following is a brief description of our findings: A. Norfolk, Morton, Lowell and King Avenue Neighborhood In this neighborhood, the concrete curb and gutter is generally in good shape, although there are some needed spot repairs. The bituminous surfacing is deteriorated to the point that it needs to be replaced. The concrete sidewalk throughout the neighborhood is also in disrepair. The proposed improvements would leave the existing concrete curb and gutter, mill the existing bituminous surfacing completely leaving as much as possible for additional aggregate base and repave two layers of bituminous surfacing. All of the concrete sidewalk is anticipated to be replaced with the addition of new pedestrian ramps at the appropriate locations. There are minor storm sewer repairs also anticipated with this project. There are no anticipated sanitary sewer improvements and only the replacement of old style hydrants for watermain improvements. The anticipated construction cost including overhead and a small contingency is approximately $500,000. We estimate that there are approximately 55 - 60 assessable units in this area. Since this is a new approach to street rehabilitation being much more than an overlay, but less than a total reconstruction, there is no past history of assessment level. Staff feels that with an assessment between $4,000-$5,000 per single family home, the result 2009 Projects Page 2 Apri12, 2009 would be an assessment of approximately half of the project cost. That would leave approximately $250,000 of city contribution. B. Railroad Drive, Freeport, Evans Avenue Neighborhood This area needs more extensive improvements. The streets are relatively narrow; there is no concrete curb and gutter; and the area is lacking an underground drainage system. The other issue we uncovered in this area is that it appears a portion of Evans Avenue as it crosses the Vernon Cemetery property was vacated sometime in the past. It would be necessary to work with the property owners and the cemetery association to re-establish a public right-of--way in this area. The proposed improvements in this area would be a general widening of the roads to a minimum of 26 feet. Freeport and Evans, for the first block south of Main Street, would need to be wider to accommodate the on-street parking that often overflows from the commercial buildings located on Main Street. A storm sewer piping system would be extended into the area from the intersection of Main Street and Evans Avenue to pickup runoff that in the past has caused isolated flooding problems. There are no anticipated sanitary sewer improvements necessary and only minor hydrant replacement and relocations anticipated on the water system. The estimated cost of the improvements in this area including overhead and a small contingency are just under $1 million. A review of the properties estimates that there are approximately 50 assessable units throughout the area, ranging from multi-family, townhome, single-family and some commercial. It is anticipated that because of the density of the neighborhood, that the assessment rate used in 2007 for street reconstruction of $6,500 per single-family resident would appropriate to use in 2009. This is a relatively expensive project with a significant assessment against the properties in the area. One other option that could be explored and presented at an informational meeting would be to extend storm sewer into the area, widen Freeport and Evans Avenues for the first block south of Main Street, including concrete curb and gutter, to accommodate the on-street parking, and then look at an overlay or other rehabilitation of the bituminous surfaces throughout the remainder of the area in an effort to reduce the project costs and therefore, reduce the potential assessments to the benefitted properties. C. Main Street Mill and Overlay between Lowell Avenue and Orono Road This project would consist of simply milling the existing bituminous surface, removing the milled material, and repaving between the existing concrete curb and gutter. This is a project that the city submitted for stimulus funding but was unsuccessful in the first tier of local projects in our MnDOT district. MnDOT has indicated that there may be another tier of local projects, but there has been no specific information provided on when or how this second tier of projects may be chosen. If stimulus funding is not forthcoming for this project, there is $500,000 earmarked in the city's 2009 CIP. One other funding option for this construction would be use of Municipal State Aid dollars. However, State Aid dollars for the next 2 - 3 years have been committed to the 193`d Avenue project. In order to use State Aid dollars on Main Street, the city would have to fund the construction in the short term and then get reimbursed when Municipal State Aid dollars become available after payment for the 193`d Avenue project. C:\Documents and Settings\jjohnson\Local Settings\Temporuy Internet Files\OLK49\04 O6 09 cc memo projects.doc 2009 Projects Page 3 April 2, 2009 One of the questions that needs to be discussed when this project moves forward is should the abutting properties be assessed for the equivalent of an overlay to the street? If so, at what level? The anticipated construction cost for this project including overhead and a small contingency is approximately $665,000. It is estimated that there are approximately 70 assessable units along the route. The 2008 Overlay Improvement project assessed each single family home $1,400. An assessment at that level would generate approximately $100,000 towards the Main Street project cost. If the City Council wanted to assess a lesser amount using the argument that the road may have needed an overlay earlier because of the amount of traffic carried by Main Street, an assessment of $1,000 per unit would generate $70,000, and an assessment of $700, or half of the 2008 overlay rate, would generate just under $50,000. I would not recommend committing entirely to this project until we have exhausted all opportunities for stimulus funding, which I would hope we would know about within 30 - 60 days. However, if the City Council feels an assessment to the benefitting property owners for this repaving would be appropriate, we could begin the feasibility study and hold an informational meeting. Financial Impact Each of these three projects has a financial impact to the city for participation in the cost. Based on the assessment rates discussed above, the city's total participation in all three of these projects could range as high as $1.5 million. Attachments • Three area location maps Action Motion by Second by Vote Follow Up C:\Documents and Settings\jjohnson\Local Settings\Temporary Internet Files\OLK49\04 06 09 cc memo projects.doc Z W Q N Z Q ~ ~ ~ ~ Z ~ ~ ~ W 0 ~- ~ O Z 0 0 N m a~ a` a~ C N Q Y_ O c z° N J LL z < a 2009 PAVEMENT MANAGMENT EVANS AVENUE, RAILROAD DRIVE AREA N Legend Evans Avenue, Railroad Drive Area Z W C'3 Q Z Q z w w Q 0 0 N c~ N Q C Q O O Z cis c~ 0 0 c 0 O 0 m c a~ Q' a~ O J .... c~ i Q~ Q~ i a--~ C .~ G z ®~ 0 c 0 O 0 m 3 0 J_ T cV N N d C_ I as J