3.3. SR 04-28-2003TO: FROM: DATE: S U BJ ECT: *Item 3.3.* MEMORANDUM Mayor and City Council Lori Johnson, Finance Director April 28, 2003 Consider Public Safety Facility and City Hall/Utilities Change Orders The following change orders have been requested on the public safety and city hall building projects. Contractor Bid Package Change Order Change Order Number Number Amount PUBLIC SAFETY BUILDING Serice Construction, Inc. (Remove brick at curved wall ) Steinbrecher Painting (Delete wall for room 122) Dryden Excavating, Inc. (Lower drain tile for south elevator pit) Daka Metal Fabricators (Extra Lintel) Schindler Elevator Corporation (Relocate elevator #1 machine room) Kelleher Construction (Concrete blanketing at topping slab) Regal Contractors (Door changes in mechanical rooms) Northern Air Corporation (Deduction for part substitutions) Total Previously Approved Total Change Orders to Date 10 1 $ (630.00) 26 1 (80.00) 1 2 1,000.00 11 5 210.00 39 1 2,300.00 8 2 360.00 13 1 429.00 42 1 (1,048.00) 2,541.00 42,569.00 45,110.00 CITY HALL PUBLIC UTILITIES Roof Tech 13 (Upgrade roof ) George F. Cook Construction 10 (Temporary enclosures) George F. Cook Construction 10 (Temporary enclosures) George F. Cook Construction 10 (Furnish and install projection screen & TV brkts) George F. Cook Construction 1 (Remove shake roof) Total Previously Approved Total Change Orders to Date $ 988.92 1,379.00 1,302.00 1,905.00 5,448.00 11,022.92 1,950.00 12,972.92 Action Requested The City Council is asked to approve the change orders as noted above.