3.3. SR 04-28-2003TO:
FROM:
DATE:
S U BJ ECT:
*Item 3.3.*
MEMORANDUM
Mayor and City Council
Lori Johnson, Finance Director
April 28, 2003
Consider Public Safety Facility and City Hall/Utilities Change
Orders
The following change orders have been requested on the public safety and city hall building
projects.
Contractor
Bid Package Change Order Change Order
Number Number Amount
PUBLIC SAFETY BUILDING
Serice Construction, Inc.
(Remove brick at curved wall )
Steinbrecher Painting
(Delete wall for room 122)
Dryden Excavating, Inc.
(Lower drain tile for south elevator pit)
Daka Metal Fabricators
(Extra Lintel)
Schindler Elevator Corporation
(Relocate elevator #1 machine room)
Kelleher Construction
(Concrete blanketing at topping slab)
Regal Contractors
(Door changes in mechanical rooms)
Northern Air Corporation
(Deduction for part substitutions)
Total
Previously Approved
Total Change Orders to Date
10 1 $ (630.00)
26 1 (80.00)
1 2 1,000.00
11 5 210.00
39 1 2,300.00
8 2 360.00
13 1 429.00
42 1 (1,048.00)
2,541.00
42,569.00
45,110.00
CITY HALL PUBLIC UTILITIES
Roof Tech 13
(Upgrade roof )
George F. Cook Construction 10
(Temporary enclosures)
George F. Cook Construction 10
(Temporary enclosures)
George F. Cook Construction 10
(Furnish and install projection screen & TV brkts)
George F. Cook Construction 1
(Remove shake roof)
Total
Previously Approved
Total Change Orders to Date
$ 988.92
1,379.00
1,302.00
1,905.00
5,448.00
11,022.92
1,950.00
12,972.92
Action Requested
The City Council is asked to approve the change orders as noted above.