Loading...
5.10. SR 08-05-1996CONSULT[NGENGINE~ 1326 Enemy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888-2923 Fax:612-644-9446 July 19, 1996 File: 230-331-20 Mr. Pat Klaers City Administrator City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: LOWELL AVENUE UPGRADE Dear Mr. Klaers: ITlglt 5.10. CIVIL ENGINEERING: ENVIRONMENTAL MUNICIPAL P~ANNING SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION I have been in contact with Don Schumacher of Cretex Companies, Ken Beaudry of Beaudry Oil, and Dr. Jarmoluk concerning the Lowell Avenue upgrade. Both Don Schumacher and Dr. Jarmoluk are very much in favor of the improvement and are willing to sign a petition waiving their rights to appeal. Ken Beaudry indicated support for the project but concern regarding the timing of the improvement. He is very much against any improvement that would be constructed yet this fall. As you are aware, he is in the process of constructing a new office building on Proctor Avenue. Currently, he is operating his entire business out of his Lowell Avenue facilities. By the spring of 1997, the bulk of his operation will be operated out of the Proctor Avenue facilities. He indicated that he would support a project if it were done in 1997. ELECTRICAL/MECHANICAL ENGINEERING: HVAC POWER DISTRtBUTION SCADA SYSTEM CONTROLS Given this, I would suggest that the project go through the normal improvement project process, whereby a feasibility is ordered, public hearing held, project bid, and an assessment hearing is held before awarding the project. There is ample time to get these steps completed and still have a project under construction in the spring of 1997. This would also allow the City time to include Sherburne County in the hearing process, so there will be no need to negotiate with them relative to paying their assessments. OFFICES IN: MINNEAPOLIS PRIOR LAKE ST. PAUL WASECA Attached is a draft resolution ordering the feasibility. Without a petition from the abutting property owners, this would be a City-initiated project; it therefore requires a 4/5 vote to proceed. We have already done the preliminary survey work, anticipating a 1996 construction schedule. Therefore, the feasibility study would be a rather simple document, primarily detailing costs and assessments. During the preparation of the feasibility, I plan to meet with the affected property owners and work out any details on a preliminary design so that all property owners are happy with the project before the public hearing is held. 230/331-2210.jul An Equal Opportunity Employer Mr. Pat Klaers July 22, 1996 Page Two In the spring of 1997, I believe there will be other projects that this could be tacked onto for bidding purposes. Jarvis Street improvement is the first thing that comes to mind. I am sure that there will be other projects available that this could be tacked onto to ensure a reasonable bid. If you have any questions regarding this, please call. Sincerely, MSA, CONSULTING ENGINEERS TJM :tw Attachment 331-2210.jul 230/331-2210.jul RESOLUTION 96- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION OF THE CITY OF ELK RIVER ORDERING A PRELIMINARY FEASIBILITY REPORT IN THE MATTER OF THE LOWELL AVENUE IMPROVEMENT OF 1996 WHEREAS WHEREAS the City has determined that it should consider improving certain property by reconstructing Lowell Avenue (the improvement); and Council must first secure a preliminary feasibility study in order to consider making the improvement; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: This matter shall be referred to MSA, Consulting Engineers, who is requested to provide to the City Council a report advising, in a preliminary way, whether the proposed improvement is feasible and whether the improvement should thus be made as proposed or in connection with some other improvement and the estimated cost of the improvement as recommended. Passed and adopted this __ day of ,19 ATTEST: Henry A. Duitsman, Mayor Sandra A. Thackeray, City Clerk 230/331-2210.jul