Loading...
7.2. SR 04-20-2009~~ Elk REQUEST FOR ACTION River To Item Number Ma or and Ci Council 7.2. Agenda Section Meeting Date Prepared by Public Works Aril 20, 2009 Te Maurer, Public Works Director Item Description Reviewed by Consider Initiating 429 Assessment Process for Completion of Lori ohnson, Ci Administrator Trott Brook Crossing and Windsor Meadows Developer Reviewed by Projects Action Requested Adoption of the two attached resolutions ordering the preliminary feasibility report for completion of the developer improvements in Trott Brook Crossing and Windsor Meadows. Since these would be considered City-initiated improvements, the resolutions require a super majority (4/5) of the Council to adopt them. Background/Discussion Trott Brook Crossing is a subdivision of multi-family and single-family lots located east of Twin Lakes Road and south of CSAH 12 that has gone for several years without the developer completing the final lift of bituminous surfacing and other minor punch list items. Windsor Meadows is a cluster development west of CSAH 1 and south of County Road 33, which is in a similar state of non-completion. Attached are exhibits showing each of these developments. Both of these developments have had the letters of credit lapse, and currently the City has no security to force the developer, or in the case of Windsor Meadows, the bank, to complete the project. City Attorney Peter Beck has researched the issue and has suggested that the City could undertake a 429 assessment project on each of these developments to complete the final lifts of blacktop and other minor punch list work. The assessment of this work would be levied against lots that are still in the developer's name. No assessment would be levied against lots that are currently built on or not owned by the developer. Financial Impact The financial risk to the City using this approach would be that the lots that the assessment would be levied against would go tax forfeit and the assessment would not be paid. However, staff has had numerous meetings over the past several months to discuss these types of issues, and with these two projects, this seems to be the best approach to getting the improvements completed. Attachments ^ Exhibits of the two developments ^ Resolutions Action Motion by Second by Vote Follow Up S:\EngineerImprovProj\2009 Improvement Projects\Windsor Meadows-TBC Final Lift\04 20 09 cc memo.doc Trott Brook Crossing Phase 2 N 01 SO 60 Feet H+FH+H Windsor Meadows N 018060 Feet H+H++H RESOLUTION 09-. A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION FOR THE CITY OF ELK RIVER ORDERING A PRELIMINARY FEASIBILITY REPORT IN THE MATTER OF THE TROTT BROOK CROSSING FINAL LIFT OF BITUMINOUS AND OTHER ANCILLARY ITEMS IMPROVEMENT OF 2009 WHEREAS the Ciry has determined that it should consider improving certain property by, placing the Final Lift of Bituminous and other ancillary items (the Improvement); and WHEREAS Council must first secure a preliminary feasibility study ui order to consider making the improvement; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: This matter shall be referred to Terry Maurer, Ciry Engineer, who is requested to provide to the Ciry Council a report advising, in a preliminary way, whether the proposed improvement is feasible and whether the improvement should thus be made as proposed or in connection with some other improvement and the estimated cost of the improvement as recommended. Passed and adopted this 20s' day of April, 2009. Stephanie A. Klinzing, Mayor ATTEST: Tina Allaxd, Ciry Clerk S:\EngineerImprovProj\2009 Improvement Projects\Windsor Meadows-TBC Final Lift\Resolutions\Order Feasib Report-TBC.doc RESOLUTION 09- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION FOR THE CITY OF ELK RIVER ORDERING A PRELIMINARY FEASIBILITY REPORT IN THE MATTER OF THE WINDSOR MEADOWS FINAL LIFT OF BITUMINOUS AND OTHER ANCILLARY ITEMS IMPROVEMENT OF 2009 WHEREAS the City has determined that it should consider improving certain property by, placing the Final Lift of Bituminous and other ancillary items (the Improvement); and WHEREAS Council must first secure a preliminary feasibility study in order to consider making the improvement; NOW, THEREFORE, BE IT RESOLVED by the City Council of the Ciry of Elk River, Minnesota: This matter shall be referred to Terry Maurer, City Engineer, who is requested to provide to the Ciry Council a report advising, in a preliminary way, whether the proposed improvement is feasible and whether the improvement should thus be made as proposed or in connection with some other improvement and the estimated cost of the improvement as recommended. Passed and adopted this 20~' day of April, 2009. Stephanie A. Klinzing, Mayor ATTEST: Tina Allard, Ciry Clerk S:\EngineerImprovProj\2009 Improvement Projects\Windsor Meadows-TBC Final Lift\Resolutions\Order Feasib Report-WM.doc