Loading...
5.1. SR 08-19-1996ITEM 5.1. Hty of MEMORANDUM TO: FROM: DATE: SUBJECT: Mayor & City Council Bruce A. West, Fire Chief August 13, 1996 Approval of Bid for 1250 GPM Triple Combination Pumper At the June 17, 1996, City Council meeting, the Elk River City Council authorized advertisement for bids for a 1250 gpm triple combination firefighting apparatus. Specifications were requested by three companies. On July 23, 1996, at 10 a.m., a bid opening was held at the Elk River City Hall. A single bid was received from Pierce Manufacturing, Inc., in the amount of $299,875. The Elk River Fire Department Truck Committee met to review the bid from Pierce Manufacturing for its compliance with the set of specifications and found the bid to be in compliance. At the August 19, 1996, City Council meeting, on behalf of the Elk River Fire Department Truck Committee, I am requesting the approval of Pierce Manufacturing, Inc.'s bid of $299,875 for the purchase of the 1250 gpm triple combination pumper. Attached to this memo are items added to the bid from Pierce Manufacturing in reference to NFPA 1901. The National Fire Protection Association (NFPA) has been continually working on guidelines and requirements for firefighting apparatus. The 1996 NFPA version of new requirements have been added into our bid from Pierce Manufacturing. It was noted that if the City of Elk River and its fire department elected not to take the 1996 version of NFPA 1901 added revisions, the contract would have to be received at Pierce Manufacturing prior to August 9, 1996. Upon review by the Elk River Fire Department Truck Committee, it was concluded that the list of revisions for the new fire department pumper should be included in the overall total bid. Please review and refer to the deletion items in reference to our specifications and what is now included in NFPA 1996 revisions. With the review of the Elk River Fire Department specifications, there have been deletions of approximately $1,400. The net change in the total price of the truck, when considering the bid additions and deletions, is an additional $1,400. Attached is a memo from Assistant City Administrator Lori Johnson which discusses the financing options presented with the bid from Pierce 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 Manufacturing, Inc. The various financing options that have been reviewed and discussed between the city administrator, assistant city administrator, and myself. The Elk River Fire Department Truck Committee has volunteered many hours over the past twelve to fourteen months putting together a set of specifications that address today's firefighting and firefighting into the year 2010 and beyond. I, along with the Elk River Fire Department Truck Committee, will be present at the August 19, 1996, City Council meeting to answer any questions you may have in reference to approval of the 1250 gpm triple combination firefighting apparatus. If you have any questions prior to the August 19 Council meeting, please feel free to give me a call at the Elk River Fire Department at 441-4919. The financing package that is being recommended calls for $74,000 to be paid on this truck. This is the 1995, 1996, and 1997, reserve allocation that the City Council has and is expected to approve during the budget process. The balance of the truck will be financed in the years 1998-2004 on a lease/purchase plan. The annual expenditure is expected to be $41,000 and this expenditure is scheduled to be financed through contributions to the city from the utilities department. I support this purchase from Pierce and the financing method. I am always a little concerned when the city only receives one bid for a piece of equipment that is in this price range. However, this is not unusual in the fire equipment industry. I feel comfortable that the fire department has gotten a good product at a good price. '( ?~ I(~ ~,~ CITY OF ELK RIVER Option Bid Ir'the City of Elk River elects to have this apparatUS provided to meet the 1996 version" of NFPA 1901, please add $2,768.00 to our total bid price. Please note that is a contract is not received at Pierce Manufacturing prior to August 9, 1996, this option must be taken. : P.02 City of Elk River NFPA 1996 Revisions The SCBA brackets in the crew cab and cab will be provided with Zt~matic #CRS collision restraint straps are required by NFPA. The front warning lights will be red Code 30scflaser warning lights instead of the Whelen ~ specified as Whelen ~/3 h2ve not yet been approved for the newest version of NFPA. There will be Code 3 Model 40 strobe lights provided on each side of the apparatus at the fl'ont cab, center, and rear as required by NFPA to meet the lower level optical warning and optical power requirements. Please note these will also replace the Whelen #73 intersection lights specffied. There will be two (2) Code 3 Model 40 strobe lights provided at the rear of the apparatus as required by NFPA to meet the lower level optical warning and optical power requirements. 5. Perimeter scene lights will be provided with lighting capable of providing illumination at a minimum level of 1 foot-candle on ground areas within 30 inches of the edge of the apparatus in areas designed for personnel to climb onto the apparatus or descend from the apparatus to ground level. Lighting designed to provide illumination on area under the driver and crew riding area exits will be activated automatically when the exit doors are opened. All other ground area lighting will be switchable. 6. An interlock will be provided to prevent operation ofthe ladder rack unless the apparatus parking brake has been activated. A steady red indicator light will be located on the cab instrument panel and illuminated when the hydraulic ladder rack is not in the stowed position. The light will be labeled "Ladder Rack". In addition, the 'Do Not Move Apparatus" light located in the cab will be activated when the hydraulic ladder rack is not in the stowed position. ,It,ll - 30 ~ 12:21P P.O3 City of Elk River h~I~PA 199~ Revisions 7. Flashin~ _~mber lights ~acing the fl-ont'and rear will be provided on the.. ladder rack and be activated whenever the rack is in the down position. s. A voltmeter will be provided on the pump panel. 9. An indicator li~t will be provided to indicate when the 4" larEe diameter discharge valve is in the clo6ed position. ity of iver TO: FROM: DATE: SUBJECT: Mayor and City Council Lori Johnson, Finance Director August 15, 1996 Fire Department Pumper Financing As Bruce outlined in his memo, he is requesting approval of the purchase of a pumper with a cost of $301,275.00. The Council has already discussed the funding of this purchase and that information is reiterated in the previous memo. With the funding in place, the remaining item to be discussed is the financing mechanism to be used. First, the contract requires an additional interest payment if the city does not pay $142,650.00 for the chassis at the time of frame-up at the factory. This additional interest adds $4,250.00 to the price of the pumper. Assuming that there is $72,000.00 in reserve, that payment will be made at time of frame-up which will reduce the additional interest cost to approximately $2,125.00. This brings to total cost of the pumper to approximately $303,400.00 with a balance remaining to be paid of approximately $231,400.00. The balance remaining could be financed several ways; an internal loan, equipment certificates, or manufacturer financing could be used. At this point it seems most probable that manufacturer financing will be used unless equipment certificate interest rates are lower at the time of financing. The manufacturer is guaranteeing interest rates of 5.6 percent for five years, 5.8 percent for seven years, and 5.95 percent for ten years. Since the financing does not need to be finalized until three weeks prior to delivery of the vehicle, there is no need to make a decision at this point. It is impossible to guess where interest rates will be in ten or twelve months when we take delivery; if rates are lower, an equipment certificate will be issued for the pumper. In no case will the interest rate be higher than listed above. Finally, all of our funding discussions have been based on a seven year repayment term. Based on the guaranteed rate for a seven year term, an annual payment of approximately $41,000.00 is required. Unless rates or funding change substantially prior to delivery of the pumper, the term will remain at seven years. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425