Loading...
7.2. SR 09-09-1996CON~[LTING ENG[NEER~ 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888-2923 Fax: 612-644-9446 CIVIL ENGINEERING: ENVIRONMENTAL ~,4UNiCIFAL ,NNING SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRICAL/MECHANICAL ENGINEERING HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS OFFICES IN: ,[NNEAPOLIS PRIOR LAKE ST. PAUL WASECA ITEM 7.2. September 5, 1996 File: 230-277-30 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 JOPLIN/TH 10 INTERSECTION AND NORTH FRONTAGE ROAD IMPROVEMENTS Dear Council Members: We have tabulated the bids that were received on Thursday, August 22nd, for the above- referenced project. There were a total of nine bidders. The following list provides the bidder and total bid. Bauerly Brothers, Inc. R. L. Larson Excavating Richard Knutson, Inc. Ryan Contracting, Inc. Forest Lake Contracting W. B. Miller, Inc. Valley Paving, Inc. Hardrives, Inc. Northdale Construction, Inc. $666,711.10 $672,681.51 $677,072.O9 $724,887.08 $730,194.75 $769,483.80 $799,895.70 $812,780.35 $832,286.96 As you are aware, there was no feasibility done for this project, since it is funded with state and local money and the portion to be assessed was petitioned for, waiving their rights to appeal the assessment. The low bid submitted by Bauerly Brothers, Inc., is slightly below the Engineer's estimate for the project. Bauerly Brothers, Inc., has previously completed similar type projects; therefore, we are prepared to recommend award to them as the lowest responsible bidder. One of the conditions in the Cooperative Agreement between MnDOT and the City of Elk River is that MnDOT must concur in writing to the award of the contract to the low bidder. We have submitted the necessary paperwork and asked for their concurrence. An Equal Opportunity Employer Honorable Mayor and City Council September 5, 1996 Page Two As of the date of this memo, we have not received written concurrence. Therefore, the award of this project should be conditioned upon that concurrence. Attached is a draft resolution for the City Council's consideration which would award the project to Bauerly Brothers, Inc., contingent upon MnDOT approval. If you have any questions regarding this, I will be in attendance at Monday evening's City Council meeting. Sincerely, MSA, CONSULTING ENGINEERS Terry J. MaUrer, P.E. TJM:tw 277-0505.sep RESOLUTION 96- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MATTER OF THE JOPLIN STREET/TH 10 INTERSECTION AND NORTH FRONTAGE ROAD IMPROVEMENT OF 1996 WHEREAS WHEREAS pursuant to Resolution 96-54, competitive bids were solicited and received for the Joplin Street/TH 10 Intersection and North Frontage Road improvement as set forth in the bid tabulation attached hereto and incorporated herein by this reference; and the City Council has considered the amount of the bids and the responsibility of the bidders and determined that Bauerly Brothers, Inc., is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: The Mayor and City Administrator are authorized and directed to execute, on behalf of the City, such contract with Bauerly Brothers, Inc., as is approved by the City Attorney for the completion of the Joplin Street/TH 10 Intersection and North Frontage Road improvement according to the approved plans and specifications designated in Resolution 96-54. This award is contingent on the City receiving written concurrence to the award from MnDOT. o The City Administrator is authorized and directed to forthwith return to all bidders the deposits made with their bids upon execution of the contract above specified. Passed and adopted this 9th day of September, 1996. ATTEST: Henry A. Duitsman, Mayor Sandra A. Thackeray, City Clerk 000-0502.sep