Loading...
5.1. PCSR 06-09-2009REQUEST FOR ACTION To Item Number Plannin Commission 5.1. Agenda Section Meeting Date Prepared by Plannin Items une 9, 2009 Rebecca Hau ,Environmental Admin Item Description Reviewed by Request by Knife River fox a Conditional Use Permit amendment to allow washing/processing operations at the Reviewed by Ernest Toth site, Case No. CU 09-14 Action Requested Staff supports a Planning Commission recommendation of approval of the Conditional Use Permit request, with the following conditions: 1. All comments from the memo dated June 4, 2009 from Mark Olson, Liesch Associates, Inc., shall be addressed. Background/Discussion The applicant wishes conditional use permit amendment approval to place a portable wash plant at the Ernest Toth Site. The water would be pumped out of the area that is being into the water table. The wash plant water would be recycled through a ponding system where water is contained and stored in a holding pond within the area of the wash plant operation. Financial Impact None Attachments • Location Map • Memo from Liesch Associates, Inc., dated June 4, 2009 • Applicant's Narrative • Proposed Washing Operations map • MN Dept. of Natural Resources Water Appropriation Permit Notification Form Case File: CU 07-19 Page 2 General Information Aggregate Industries Steve BruUri Applicant Knife River 60 Day Rule The application has been deemed complete as of Apri128, 2009. The City must take action by June 28, 2009. Requested Action Conditional Use Permit Amendment Approval Location and Size Approximately 200 acres east of Hwy 169 and south of 225" Ave Location Existing Use Land Use Plan Designation Current Zoning Subject Mineral Commercial Reserve CRT (ME) Property Extraction North Agriculture Commercial Reserve CRT South Mineral Commercial Reserve CRT (ME) Extraction East Agriculture Rural Residential A-1 (ME) West $arton Sand & Mining A-1 Gravel Overview The subject property has been used as a gravel operation fox a number of years, and has received the appropriate Conditional Use Permit for mineral extraction. Any amendment to a conditional use, unless expressly approved in the original CUP, requires a new CUP. AEplicable Regulations Conditional Use Permit The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: 7. 1-Vill not endanger, injure or detrimentally affect the use and enjoyment of other property in the immediate vicinity or the public health, safety, morals, comfort, convenience orgeneral avelfare of the neighborhood or the city. 2. i.Vill be consistent with the comprehensive plan. 3. Will not impede the normal and orderly development and improvement of surrounding vacantproperly. 4. 1Vill be served adequately by and aa~ill not adversely affect essential public facilities and services including streets, police and fire protection, drainage, refuse disposal, avater and seaver systems, parks and schools; and aarill not, in particular, create traffic congestion or interference avith traffic on adjacent and neighboring public thoroughfares. S:\PLANNING MAIN\Case Files\CUP\CU 09-14 Knife River\Knife River SR to PC.doc Case File: CU 07-19 Page 3 Aggregate Industries Steve Bruhn 5. Weill not involve uses, activities, processes, materials, equipment and conditions of operation that oriel be detrimental to any persons or property because of excessive tra~c, noise, smoke, fumes, glare, odors, dust or vibrations. 6. Weill not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. 7. Will fully comply with all other requirements of this Code, including any applicable requirements and standards for the issuance of a license orpermit to establish and operate the proposed use in the city. If denial of such a permit should occur, it shall accompany recommendations or determinations by findings or a report stating how the proposed use does not comply with the standards set forth in Section 30-654. In the review of the standards for CUP as outlined, it appears that the request is consistent with all of these standards. Analysis The operation of a wash plant will be consistent with the existing operations at the site. The applicant received approval to mine into the water table in 2006 and the operation will utilize the water from the areas that have been excavated below the water table. Washing is expected to be seasonal and intermittent depending on market demand. The applicant is required to meet noise level requirements set by the Environmental Protection Agency (EPA) and will use berms to reduce the effects of noise generated from the operation during their permitted hours. The site currently operates under a MICA Air Quality and Stormwater Permit. Recommendation Staff supports a recommendation of approval, subject to the conditions outlined above. Respectfully Submitted Rebecca Haug Environmental Administrator Action Motion by Second by Vote Follow Up S:\PLANNING MAIN\Case Files\CUP\CU 09-14 Knife River\Knife Rivex SR to PC.doc f'FC~d~I~~ J~d~ 0 5 ~COR I-IYDROGEOLOGISTS ^ ENGINEERS ^ ENVIRONMENTAL SCIENTISTS June 4, 2009 City, of Elk River Rebecca Haug, Environmental Administrator 13065 Orono Parkway „ r• ,-- ~r~~ Z Elk River, ivl~nneso~u ~.~~~~ RE: Knife River Co. (Toth Property) Proposed Gravel Washing Operations Dear Ms Haug: On behalf of the City of Elk River, Liesch Associates, Inc. (Liesch) has reviewed the proposed gravel washing operations for the Knife River operation located on the Ernest Toth property within the Elk River Gravel Mining District. The .proposed. gravel washing .operations requires a Minnesota Department of Natural Resources Water Apprapriations Permit for which an application has been submitted by the applicant. It is understood that washing operations will utilize water from areas that have been excavated below the water table and that .washing is expected to be seasonal and intermittent depending on market demand. The pumping rate is estimated at 250 gpm with an annual volume of up to one-million gallons. Liesch recommends that the following tasks be considered with respect to the proposed gravel washing operation: • Identify and/or confirm the location of nearby groundwater wells (groundwater receptors) and surface water receptors on and immediately surrounding the mining and gravel washing operation and document their proximity to the washing operations on a map. • Install a water table monitoring well or wells at the Site and generally between the washing operation and the nearby groundwater receptor(s). Survey the monitoring well(s) for horizontal and vertical control and identify their location on a Site map. • Measure and record water elevations at the monitoring well(s) within approximately one-week of initiating pumping of water from the dug pit for washing, mid-way during washing and within one-week upon cessation of washing operations. • Conduct water quality ~ testing of samples .collected' from .monitoring :.:well(s) .for diesel range organics (DRO) BETX, pH (field), temperature (field) acid specific conductance (field).prior to and at the cessation of washing operations on an annual basis. www.liesch.com LIESCH ASSOCIATES, INC. ^ 13400 15TH AVENUE NORTH ^ MINNEAPOLIS, MN 55441 ^ 763/489-3100 ^ FAX: 763/489-3 I O I Page 2 June 4, 2009 • In the event of a spill, washing operations should be terminated until such time that the extent and potential impact from the spill can be determined through testing as determined necessary by the City. If you have any questions or comments regarding the above recommendations please contact me at (763) 489-3134 or John Lichter (763) 489.3120 at your convenience. Sincerely, LIESCH ASSOCIATES, INC. ~~ ~~ r,~~~_l~ ~., y Project Manager cc: John Lichter W:\env\64815\wash operations ltr 5-29-09.doc A www.liesch.com THE LIESCH COMPANIES ^ MINNEAPOLIS ^ CHICAGO ^ LOS ANGELES ^ MADISON ^ MILWAUKEE ^ PHOENIX AN MDU RESOURCES COMPANY 4787 Shadow Wood Dr. NE Sauk Rapitls, MN 56319 (320) 251-9472 (320) 251-0011 FAX Apri123, 2009 City of Elk River Rebecca Haug, Environmental Administrator 13065 Orono Parkway Elk River MN 55330 RE: Conditional Use Permit Application Amendment -Washing Operations Toth Property Dear Rebecca: The purpose of this request is to provide information to the City of Elk River for a Conditional Use Permit application amendment to allow washing/ processing operations on the Ernest Toth site. Owner Richard Toth Trustee (Ernest Toth) 1714 Maple Court St. Cloud MN 56304 (320) 229-3839 Applicant• Knife River 4787 Shadow Wood Drive NE Sauk Rapids MN 56379 (320) 251-9472 Legal Description: W?/2-SE1/4-SE1/4 and the W1/s,El/2-SE1/4-SE1/4, and S1/2-SW 1/4 Sections 02-03, Township 33N, Range 26W, City of Elk River N Township, Sherburne County, Minnesota. Additional Information: A portable wash plant will be placed on site; water will be pumped out of the area that is being mined into the water table. The wash plant water will be recycled through a ponding system where water is contained and stored in a holding pond, which is located within the area of the wash plant operations. Stockpiling of processed material will be placed strategically around the operational area. An Equal Opportunity Employer AN MDU RESOURCES COMPANY 4787 Shadow Wood Dr. NE Sauk Rapids, MN 56379 (320) 251-9472 (320) 251-0011 FAX The recycling pond will be approximately 25' (wide) by 200' (long) with an approximate depth of 15'. No wastewater is discharged off site as a part of this operation. A DNR Water Appropriations permit has been applied for regarding a dug pond and pulling water for washing purposes (Permit # 97-0005). The amount of water used for washing will be determined by market demand and projects in the area. The type of equipment which will be used for washing aggregate includes the use of portable wash plant and stacking conveyors. A loader will feed the material to the indicated equipment above for processing operations. The following materials will be used for local city, county, state projects within the area, for aggregate base to roads and/ or products used for asphalt operations. Knife River operates under current MPCA Air Quality and Stormwater permits. We will meet all EPA noise level requirements. Stockpiles will be placed to aid in the reduction of noise. Knife River will meet all EPA noise level requirements during the time we are allowed to operate. Berms will be used to reduce the effects of any noise generated from our operations. The existing drainage pattern at this site will not change. There will be no water leaving this site, changes in vegetation include the area to be graded slightly at the start of operations, to place equipment and stockpile storage areas. Overburden topsoil will be stored in berms surrounding the operational area. Thank you for your review of this information, if any questions please contact me at (320) 529-4241. Sincerely, ~~ Holly Brisk Environmental Assistant Knife River Enclosures An Equal Opportunity Employer ~ ~, °' _ ~ .4+ N C ~ r `° z ~ O ~ m a i T ~ ~ ~ ~ /~11 ~ ~ ~ N •~ C O o L O O Gs C _ W 3 0 zQ O ~ Npm N oo~ N U N Q. ~ O O = U O (4 ~. = n- o -> ~ ~ a . Woy ~C ~ Q ~ O a1 N '~ mama ~ ° ~~~ ~ u~ W u /L li J O rY :: ~~~" `" c. UYV4) D ~~ . ~- _ y~ _ of d a"yr, - ~,. ~~' ~ ~,g, ~~ ~ ~~~~ y e. ,*. ,:_ ~. .. E X _;t yt . ~~*'Sk. ~j; qic '<s r~- 0 ~ ~"'- . '..f~- `~ 090 A ~J^ 6. ~ G~~ yY~ ~,~4 a8 ~ `; ~r 5`-'~o~.. ' si,e. ~~ ~~92'0 . : M J y ~f . ,, i. 3n «: r ~v a60 . ~96 o"yti ., , _ d1F .. .. ~ n ~ o y j 1 ~~ ~„ ~ ~ , ~ } b ~ ~~ i z o ~ ~ `,. - w~~,. X020 ~ e~y~' - - 'ors ~--~..._~'~ _ _ { ~ Ve5 Oy ~h r ~` ~ ~~ C~~ L ova ~~ °' ~ 5 g`~ ~ f k~~ 'ticri r 7 ~~'° .~~ .1 - ~ ~'~.' ~. = - _ ~ '~ ~~~ ~' . _ :~ K t.. ~ ai ,... t i' ~~ ~ 's ~ y~ ~ 3 ~' r N , '~ r ~ ~L F' ~++g'' 'Sy ~_11TY~~K -'- "" . TY~ .,+~~:'* 5~, ~eM~~6iE--j a~e]S .: !H y~ i r , i ~~ Department of ~ ~`Naturai Resourcas~ DEPARTMENT OF NATURAL RESOURCES Water Appropriation General Permit Notification Form General Permit 97-0005 requires that the DNR be notified at least five days before the start of water appropriations. Please fill in the items listed below and fax, mail or email this form to the appropriate Area Hydrologist for the county in which the water appropriation is located. This notification form is only for temporary appropriations authorized by General Permit 97-0005 that total less than 50 million gallons and are completed within one year. Applicant Name: Contact Person or Agent: Knife River Corporation -North Central Holly Brisk Address: 4787 Shadow Wood Drive NE Sauk Rapids MN 56379 Telephone: FAX: 320.529.4241 320.25 I.OOI 1 Purpose: ^ Construction Dewatering ^ Hydrostatic Testing of Pipelines or Tanks (Check one or more) ®Landscaping or Dust Control ^ Hydrostatic Testing of Wastewater Ponds Project Description (include depth of wells, dewatering depth, well size, etc): gravel pit -dug pond for the purpose of pulling water for washing aggregate material anddust control on site located on the Ernest Toth gravel site Source of Water and how it will be appropriated: a dug pond(s) located onsite within the property line of the Toth's property which is leased by Knife River, which in an agreement for the purpose of a dug pond for washing aggregate and dust control measures. The site is currently permitted for mining into the water table with the City of Elk River which issued Knife River a Conditional Use Permit in Dec'O5. Legal Description of Point of Taking: (Please include a map} Sherburne County: Quarter Section or Gov. Lot see attached map, Section 03, Township 33N, Range 26W. Estimated Pumping Rate: Estimated Volume of Water to be Appropriated Start of Pumping (date): End of Pumping (date): (may not exceed 50 million gals): 250 gpm Approx June 1, 2009 12-31-09 1,000,000 Point of discharge for water: (Please include a map showing the discharge site) Quarter Section or Gov. Lot ,Section ,Township ,Range Name or Description of Receiving Water: Signature of Applicant: (By signing, 1 certify the information submitted is true and corriJrct the best of my knowledge) Date: " >~~ ~ qr''q ~-~ t ~~ 3-30-09 4---mac 1.~ '~'~-~ ~ REQUIREMENTS -Please read the conditions below before commencing appropriation. The temporary appropriation may commence 5 days after receipt of this form by the Area Hydrologist, or upon verbal approval of the Area Hydrologist, provided that all conditions of General Permit 1997-0005 are satisfied. If a natural resource conflict is expected, the Area Hydrologist will contact the applicant and advise them that the General Pe-mit cannot be used. Please note that a $101 water use fee is required for al] projects that exceed 15 million gallons. If the estimated volume shown above exceeds 15 million gallons, the applicant will receive an Invoice from the State of Minnesota dananding payment of the $101 water use fee. In al] cases, after completion of the project, the enclosed "Report of Water Use" form must be completed and transmitted to the address shown on the form. rAX or mail this form so that it will be received by the appropriate Area Hydrologist at least five days before the