3.5. SR 09-16-1996ity of iver MEMORANDUM **Item 3.5. a-c** TO: FROM: DATE: SUBJECT: Mayor & City Council Lori Johnson, Asst. City Administrator September 14, 1996 Pay Estimates Pay Estimate No. 3 - Hillside Crossing H The final attachment is a copy of Pay Estimate #3 to Mid-Minnesota Concrete and Excavating, Inc., in the amount of $95,251.37 for work completed on the Hillside Crossing II project. The City is holding retainage of $25,292.03 on this project. Pay Estimate No. 6 - Wastewater Treatment Plant Expansion The next attachment is a copy of Pay Estimate #5 to Gridor Construction, Inc., in the amount of $276,943 for work completed on the Wastewater Treatment Plant expansion project. The engineer indicated that the clarifiers are now in operation and construction has started on the sludge storage tank. Pay Estimate Nos. 3 & 4 - Ice Arena Expansion Attached are copies of Pay Estimates #3 & #4 to M. A. Mortenson for work completed on the Ice Arena Expansion project. Pay Estimate #3 is in the amount of $101,468 and Pay Estimate #4 is in the amount of $614,886 making the total payment to M.A. Mortenson $716,354. You may recall that the last Pay Estimate approved was Pay Estimate #1. Because the payments are being made to M.A. Mortenson and a payment had been made to them prior to the start of construction, the last Pay Estimate should have been labeled #2 not #1. Please refer to the second page of the Pay Estimates for detail on payments to individual contractors. Action Requested The city engineer has reviewed the public improvement Pay Estimates, inspected the work completed, and recommends payment as noted above. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 both M. A. Mortenson and RSP have signed off on the Ice Arena Pay Estimates and recommend payment as noted above. s:kcouncil\payest.doc FROM: TO: CO;~r'RACTOR: AD DRE,..'~: OWNER: PROJECT: COMPLETION DATE ORIGINAL: REVISED: PARTIAL PAYMEN'r ESTLMATE NO. 3 AUGUST 3. 1996 SEPTEMBER 4, 1996 MID-MINNESOTA CONCRETE/EXCAVATING, INC. 700 INDUSTRY. ANOKA, MN 55303 CITY OF ELK RIVER. MINNESOTA HILLSIDE CROSSING II (230-297-30) AUGUST 2, 1996 AMOUNT OF CONTRACT: ORIGINAL: 505.840.62 REVISED: DESCRIPTION SCHEDULE 1.0 STREET CONSTRUCTION - TOTAL SCHEDULE 2.0 WATERMAIN - TOTAL SCHEDULE 3.0 SANITARY SEWER - TOTAL SCHEDULE 4.0 STORM SEWER - TOTAL SCHEDULE 5.0 EXTRA WORK-TOTAL 87,0dl .03 0.00 0.00 0.00 0.00 151,889.35 86,341. I5 25,696.00 152,075.30 5,882.90 j: ~c hn'ical~.30X~ cfi ~'~,~Y297f3 .X L5 j:Xch:ricar,230h:xcrl~..~0297#3, X LS PAGE 4 PAGE I 230-297-30 230-297-30 GRIDOR CONSTR., 1886 BERKSHIRE LANE P.O. BOX 41246 PLYMOUTH, MN 55441 INC. 612-559-3734 Owner CITY OF ELK RIVER. MN Date 9/9/9~11 For Period 8/5/96 TO 9/9/96 Request No. Engineer MSA CONSULTING ENGINEERS SUMMARY: 1 2 3 4 5 6 7 8 9 10 ll ORIGINAL CONTRACT AMOUNT CHANGE ORDER - ADDITION CHANGE ORDER - DEDUCTION REVISED CONTRACT AMOUNT VALUE COMPLETED TO DATE INCLUDING CHANGE ORDERS MATERIAL STORED AMOUNT EARNED TO DATE LESS RETAINAGE - 5% SUB-TOTAL LESS AMOUNT PREVIOUSLY PAID AMOUNT DUE THIS REQUEST REQUEST FOR PAYMENT WWTF UPGRADE ELK RIVER, MN $ $ (48.141) $ 3.292.900 $ 3,244,759 $ 1,715,709 $ 385,793 $ 2.101,502 $ 0 $ 2.101.502 $ 1,824,559 $ 276,943 Recommended for Approval by: B~L CHANG - Approved by Contractor: GRIDOR CONSTR., INC~~ ROBERT MEYER PROJ. MGR 9/9/96 Specified Contract Completion Date: Approved by Owner CITY OF ELK RIVER, MN Date PAYXLS 9/9/96 EQUAL OPPORTUNITY EMPLOYER TO (O ,VNER): CITY OF ELK RIVER 13065 ORONO PARKWAY ELK RIVER, MN 55330 FROM (CONTRACTOR): MORTENSON COMPANY ~.~. BOX 710 MINNEAPOLIS, MN 55440 PROJECT: MAM JOB NO: 951019 ELK RIVER INVOICE NO: 17742 ICE ARENA EXPANSION APPLICATION #: 3 VIA (ARCHITECT): ARCHITECTS PROJECT NO: Distributionto: __OWNER __ARCHITECT __CONTRACTOR PERIOD FROM 07/01/96 TO: 07/31/96 CONTRACTOR'S APPLICATION FOR PAYMENT CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Change Order's approved in previous months by Owner Approved this Month Number Date Approved TOTALS 0 0 Net change by Change Orders 0 The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by this Application for payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. CONTRACTOR: ARCHITECT'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on-site observations and the data comprising the above application, the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief, the Work has progressed as indicated, the quality of the Work is in accordance with the C -~ct Documents, and the Contractor is entitled to payment of the A~.. JNT CERTIFIED. Application is made for Payment, as shown below, in connection with the Contract. Continuation Sheet, AIA Document G703, is attached. 1. ORIGINAL CONTRACT SUM (Column A on G703) 2. NET CHANGE BY CHANGE ORDERS (Column B on G703) 3. CONTRACT SUM TO DATE (Line 1 plus Line 2) 4. TOTAL COMPLETED & STORED TO DATE (Column G on G703) 5. RETAINAGE a. 5% % of Completed Work $1,434 (Column D + E on G703) b. 5% % of Stored Material $0 (Column F on G703) Total Retainage (Line 5a + 5b IORI $1,434 Total in Column J of G703) 6. TOTAL EARNED LESS RETAINAGE $146,063 (Line 4 less Line 5 Total) 7. PREVIOUS CERTIFICATES FOR PAYMENT $44,595 (Line 6 from prior Certificate) 8. CURRENT PAYMENT DUE $101,468 (Line 6 less Line 7) 9. BALANCE TO FINISH, PLUS RETAINAGE $2,142,141 (Line 3 less Line 6) $2,288,204 $0 $2,288,204 $147,497 State oP.. Minnesota Subscribed and sworn to before me this~°'~y ofCCP, i996 . Notary Public: ~,~t.~ (',t- ~:~¢.l)-dt..:.l'-~ County of: My Commission expires: ' ~:~,p~,.~. 3 i NOTARY: ~IJ~TER! ANNE BARNE'I'r~ ~.~._,~l~..J NOTARY PUSUC - MINNESOTA ~ ;~ "<'-~ MY ~ Ex~re~ Jan. 3 ~, 2000~ M.A. M 'NSON COMPANY AIA DC ,,ENT (A) CITY OF ELK RIVER APPLICATION #: 3 ICE ARENA EXPANSIO,, APPL DATE: 08/15/96 MAM JOB #951019 PERIOD FROM: 07/01/96 TO; 07/31/96 (B) (c) (D) (E) (F) (G) (H) (i) (j) EXECUTED REVISED APPROVED WORK ITEM SCHEDULED C.O.'S & CONTRACT PREVIOUS IN PLACE STORED TOTAL PERCENTAGE BALANCE 5% NO. DESCRIPTION OF WORK ................................................................... VALUE REVISIONS AMOUNT REQUEST THIS PERIOD MAT'L TO DATE COMPLETE TO FINISH RETAINAGE 1 GENERAL CONDITIONS 66,234 0 66,234 4,510 584 0 5,094 7.69% 61,140 0 2 ICE EQUIPMENT 394,470 0 394,470 0 0 0 0 0.00% 394,470 0 3 GENERAL CONSTRUCTION 4 BLEACHERS 5 ELECTRICAL 6 MECHANICAL 999 CONSTRUCTION MANAGER FEE 1,245,700 52,570 167,205 299,700 62,325 0 1,245,700 30,656 0 52,570 0 0 167,205 10,300 0 299,7OO 0 0 62,325 1,177 79,143 0 109,799 8.81% 1,135,901 360 0 360 0.68% 52,210 6,550 0 16,850 10.08% 150,355 11,470 0 11,470 3.83% 288,230 2,747 0 3,924 6.30% 58,401 0 Securities Pledged 18 843 574 0 TOTALS 2,288,204 0 2,288,204 46,643 100,854 0 147,497 6.45% 2,140,707 1,434 MORTENSON '~612 520 3430 09/12/96 11'17~:02/03 N0:496 TO (OVVNER): CITY OF ELK RIVER 13065 ORONO PARKVVAY ELK RIVER, MN 55330 · ,~OM (CONTRACTOR,): M,A. MORTENSON COMPANY P.O. BOX 710 MINNEAPOLIS, MN 55440 PROJECT: MAM JOB NO: 951019 ELK RIVER INVOICE NO: 17828 ICE ARENA EXPANSION APPLICATION ~: 4 VIA (ARCHITECT): ARCHITECTS PROJECT NO: Dlstdb~ionto; __OWNER __ARCHITECT __CONTRACTOR PERIOD FROM 08/01/~ TO: 08/31/96 CONTR~.,..CTOR'S___Ap. PLICATION FOR PAYMENT __ Application is made for Payment, as shown below, in connection CHANGE ORDER SUMMARY __ADDITIONS DEDUCTIONS Change Order's approved in previo..,.u,s months .b_y_ O.~_n_er .......... .App._roved .t.h.! ~. M on th Number Date ARproved 1 07/25/g6 Shaw Lundqui~'- 2,514 ................. TOTALS 2,514 0 Net chang_e, by Cham3e Orders 2..51~=== The undersigned Contractor certifies that to the best of the Contractods knowledge, information and belief the Work covered by this Application for payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now clue. CONTRACTOR: ARCHITECT'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on-si~a observations and the data comprising/he above application, the Arc--tact certifies to the Owner that to the best of the Architecrs kr ;~ge, information and belief, the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. Date: with the Contract, attached. 1. ORIGINAL CONTRACT SUM (Column A on G703) 2. NET CHANGE ElY CHANGE ORDERS (Column iii on G703) 3, CONTRACT SUM TO DATE (Line I plus Line 2) 4. TOTAL COMPLETED & STORED TO DATE (Column G on G703) 5. RETAINAGE a, 5% % of Completed Work (Column D + E on G703) b. 5% % of Stored Material (Column F on G703) Total Retainage (Line 5a + 5b JORI Total in Column J of G703) 6. TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5 Total) 7. PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) 8, CURRENT PAYMENT DUE (Line 6 less Line 7) Continuation Sheet, AIA Document GT03, is $2,288,204 $2,514 $2,290,718 $766,867 $5,918 $5,918 $760.950 $148,063 $614,888 9. BALANCE TO FINISH, PLUS RETAINAGE $1,529,789 ~.- .~ {Line 3 less Line 6_.) , ~. -~ ~ State ot Minnesota Subscrii:)ed and sworn to before me this day of ,1996 Notary Public: County of: My Commission expires: ,2000 NOTARY: TOTAL AMOUNT CERTIFIED $ By: Date: MORTENSON ~612 520 3430 09/12/96 11'17~'03/03 N0:496 8