Loading...
5.6. SR 08-17-2009REQUEST FOR ACTION To Item Number Ci Council 5.6. Agenda Section Meeting Date Prepared by Communi Develo ment Au st 17, 2009 erem Barnhart, Plannin Mana er Item Description Reviewed by Consider Focus Area Study West Side Proposal Reviewed by Action Requested Acceptance of the HKGi's proposal to complete a land use plan for the west side of Highway 10. Summar~r Hoisington Koegler Group, Inc, has provided a quote to complete the west side land use plan. The need for a land use plan on the west was highlighted by the property owners, wanting to understand how development and redevelopment in the area will impact their property, how access to their properties are maintained, and how their property values are enhanced. In response, HKGI prepared a proposal for a land use plan that attempts to address the shortcomings identified during the original east side plan. Their proposal includes: 6 individual "stakeholder" meetings (the east side plan included 3) 5 rounds of public meeting (with EDA/ PC/ and CC either separately or together) 6 meetings with city staff. Funding HKGi's proposal includes a fee of $39,600. This fee can be paid fully by the EDA, or by other funds fox example a three way cost sharing involving the General Fund (Planning), Street Reserve (for the transportation aspects), and EDA, each taking a third of the cost. Benefits It is advantageous to employ outside agents to complete these types of planning work. Staff can effectively manage the process while staying above the `gritty' details. Taking a elevated role allows the City to ensure that its global interests axe maintained without succumbing to narrow, private interests. Additionally, HKGI brings skills, expertise, and assets to the table that Staff does not posses; design, graphics, impartiality and time. It is recommended that the City retain HKGI to complete the planning process started earlier this year. Attachments • Written proposal, dated August 12, 2009. S:\PLANNING MAIN\Projects\FAST Study Area\FAST memo to CC RE west side 8-17-09.doc Action Motion by Second by Vote Follow Up S:\PLANNING MAIN\Projects\FAST Study Area\FAST memo to CC RE west side 8-17-09.doc Creative Solutions for Land Planning and Design August 12, 2009 Jeremy Barnhart, Planning Manager City of Elk River 13065 Orono Parkway Elk River, MN 55330-5600 Re: PROPOSAL -FAST study, phase II. Dear Jeremy: Hoisington Koegler Group Inc. Thank you for the opportunity to submit this proposal to conduct phase II of the Focused Area Study around Highway 10 in Elk River. As phase I conducted for the area east of Highway 10 was progressing, it became clear that many people had legitimate questions about the future of the land west of Highway 10. These questions pertained to access, circulation, and land use synergies between east and west as well as the impacts potential Highway 10 upgrades would have on existing development. While the long-term future of Highway 10 remains fluid and will for some time to come, the process of conducting the FAST study made it clear that the City will have substantial influence over MN/DOT's decisions about the timing and nature of highway improvements. Because of the impact Highway 10 improvements will have on land use decisions, we believe it is important for the phase II study to begin with solidifying the City's expectations as well as MN/DOT requirements surrounding future improvements and using that understanding as the basis for planning. You will see that our work plan allows for adjustments to the current phase I outcomes as appropriate once we delve into the phase II area. You will also see that we suggest the complete integration of phases I and II into a single final report and set of graphics rather than separate documents. The work plan below represents our initial understanding of the City's desires for the project. We are completely open to alternative approaches or the need for outcomes not currently identified. Proposed Work Plan Task 1-Project Re-initiation This phase will be used to establish a critically important baseline from which to launch phase II of the FAST study. Here, we will review with Ciry staff and elected/appointed officials where the first phase of work left off as well as the comments received in later public meetings. We will use this information to help the community re-evaluate core project assumptions (especially pertaining to Highway 10 access) that will establish a foundation for planning. 1.1 Participate in meeting with MN/DOT officials to review their plans and objectives for Highway 10 access and long-term reconstruction. 123 North Third Street, Suite 100, Minneapolis, MN 55401-1659 Ph (612) 338-0800 Fx (612) 338-6838 PROPOSAL -FAST Phase II, Elk River, M1V August 12, 2009 Page 2 of 4 1.2 Conduct kick-off meeting with City Staff to review the work plan and schedule, gather missing base information, review phase I outcomes and comments and identify alternative approaches to Highway 10 access. 1.3 Facilitate EDA/CC/PC workshop to review phase Ioutcomes/public comments, determine if there are modifications needed to phase I, determine agreed-upon project assumptions, especially pertaining to the future of Highway 10 access. 1.4 Based on the outcome of the workshop, prepare technical memo stating determined project assumptions/objectives. 1.5 Update project website with latest information. Deliverables: ^ MN/DOT meeting summary ^ Project assumptions/objectives technical memo ^ Project schedule & refined work plan Task 2-Conduct Project Area Analysis 2.1 Prepare expanded-area base mapping to encompass FAST phase I and II study area. 2.2 Conduct up to 6 individual and confidential stakeholder meetings with area property and business owners to review the project assumptions/objectives and determine their future property interests. 2.3 Prepare study area analysis diagrams that build from those prepared for phase I of the project. 2.4 Facilitate meeting with Ciry staff to review gathered information and materials. 2.5 Update project website. 2.6 Prepare project newsletter for distribution by City staff. Deliverables: ^ Analysis diagrams ^ Existing conditions technical memo ^ Project newsletter Task 3-Explore the Possibilities 3.1 Facilitate visioning roundtable with City staff at HKGi office to build from phase I work and identify the parameters and possibilities for the full project area. Focus will be on developing a series of approaches to redevelopment, circulation, recreation, and open space. This could include re-exploration of certain aspects of the phase I plan. 3.2 Prepare illustrative concept diagrams for the approaches explored in 3.1. The concepts will each provide a unique approach to achieving overall project objectives. The concepts will illustrate: • Development patterns: HKGi will refine the alternative land use concepts to depict the land uses proposed with each concept. • Transportation systems: Each concept will include a depiction of all proposed transportation infrastructure including roadways, trails, and sidewalks. • Green infrastructure: Each concept will include a depiction of proposed parks, natural open spaces and greenway links. 3.3 Quantify development "yield" for each concept that identifies the yield of commercial space and households and forecasts jobs, population and development value. This task will PROPOSAL -FAST Phase II, Elk River, MN August 12, 2009 Page 3 of 4 identify the magnitude of development potential for each concept alternative as a way to compare and contrast them. 3.4 Facilitate review session with City staff at HKGi office to evaluate concepts. 3.5 Revise concepts based on meeting feedback. 3.6 Facilitate concept review session with EDA/PC/CC for review and feedback. 3.7 Revise concepts based on meeting feedback. 3.8 Update project website and prepare project newsletter illustrating concept alternatives. 3.9 Facilitate public open house to provide an opportunity for the community to offer feedback on the concepts prior to refinement into a single alternative. 3.10 Prepare summary of community feedback. Deliverables: ^ Meeting and open house agendas/summaries ^ Preliminary concepts ^ Development yield technical memo ^ Project newsletter Task 4-Prepare Preferred Plan for the Full FAST Study Area 4.1 Conduct meeting with City staff to review public input and identify recommendation for refining concepts into a single, preferred plan. 4.2 Facilitate EDA/PC/CC work session to review public input and recommendations for plan refinement. 4.3 Based on EDA/PC/CC input, prepare a preferred plan for the full study area. Like the concept alternatives, the preferred plan will be designed and graphically illustrated around: • Development patterns • Transportation systems • Crreen infrastructure 4.4 Update development "yield" for the preferred plan. 4.5 Assist City staff in preparing a utility and infrastructure impact analysis for the preferred plan. 4.6 Prepare draft report that incorporates both FAST phases I & II. 4.7 Facilitate review session with City staff. 4.8 Facilitate final review workshop with EDA/PC/CC to present the full draft plan for comment and recommendation for approval. 4.9 Refine draft plan based on feedback and submit a final plan. 4.10 Present plan to City Council for comment and approval. 4.11 Make final modifications as necessary. Deliverables: ^ Preferred plan and support graphics for full study area ^ 3 bound report copies and CD of report at draft and final stages ^ CAD version of master plan ^ Meeting agendas/summaries Fee Proposal HKGi proposes to conduct the work outlined above at an hourly rate for a fee not to exceed $39,600 including reimbursable expenses. HKGi is prepared to start the project immediately with an anticipated five month timeframe to completion. PROPOSAL -FAST Phase IL, Elk River, MN August 12, 2009 Page 4 of 4 One element we discussed is the potential for more one-on-one stakeholder meetings as identified in Task 2.2: either more meetings in a single round or additional rounds of meetings. If a greater extent of involvement is desired in this area, the fee for 4 meetings happening in a single day would be $1,500. We look forward to continuing our work on the FAST project. If you have any questions, please do not hesitate to contact me. Sincerely, Hoisington Koegler Group Inc. Bruce Chamberlain, ASLA Vice President