Loading...
3.3. SR 08-17-2009~/ `Elk REQUEST FOR ACTION River To Item Number Ci Council 3.3. Agenda Section Consent Meeting Date Au st 17, 2009 Prepared by Tim Simon, Finance Director Item Description Estimates Pa Reviewed by Ter Maurer, Public Works Director y Reviewed by Action Requested The City Council is asked to approve the pay estimates as stated below. Background/Discussion Below are pay estimates submitted for approval. These pay estimates have been reviewed and approved by department head in charge of the project. A supplemental agreement has been submitted for the 193`d Avenue Street Improvement in the amount of $95,778 for three main items: 1) Blending of topsoil, .due to the fact that the topsoil found on the side does not meet MnDOT specification. 2) Steel sheet piling shoring; this is due to a changed soil condition along the length of the wall. 3) Modular block retaining wall (Minnesota School of Business); at the time that the plans were prepared, this was a vacant lot, and so no retaining wall was included. These items have been reviewed by Terry Maurer, Public Works Director and MnDOT; in addition, MnDOT concurred on the cost of the items. At this time, based on how the project is going, we anticipate the majority of this change order to be covered by under runs on other project items. Financial Impact Project 193`d Avenue project 2008 Downtown Overlay Pay Est. No. Contractor 5 R.L. Larson Excavating, Inc. F Astech Corporation Amount $604,774.55 13,693.22 Attachments Pay estimates for the above projects. Supplemental agreement No. 2 Action Motion by Second by Vote Follow_Up S: \Council\Tim\2009 \Payes timate0817. doc z 0 a a 0 0 J a o ,: 0 H Z O °o_ a W a N Z F- } H O f"' W Z U ~ ~ ~ a w H H U z v O U !"' Z Z O a U N w w O a z N w z ~ _ ~ ~ ` m Ln CD r- .'~ N C7 - f~ N c~ N N ~ c~ f~ W _ - f- o CJ N Q) cD ~ C ~ ~ m 7 o -.Q N EF3 Ef3 ~ V cD n ~; ~, ,- ~ O c~ ~' F Q r- ` N --_ ~ - O V , ~ - L7 cD o - cfl -. ~n a O ~ ~ O ~ 7 0~ I~ b ~ O~ In - `+ r ~ ~ ~n ~ ~: ~ o ~o a' - _ ~ i ~ ~- I O` 0 ~; `~ , ~ ~, ;_ ~ _ ~ p ~ LL w o ~ ~ ¢ - ~ c~ p w ~ z w z w - z < ~ p F-; ~ ~ ~ z w < ¢ w a w O p ~ w H ~ Q Q ~ ~ F- z z CC W W O Z O O ~ F- w w O ~ ~ a a ~ ~ ~ r o O O ~ ~ ~ ~ ~ ~ ~ ~ o a ~ M F ~ ~ z O U O Z N Z ~ W 0 Q ~ Q 0 Z ~ O O N W Q ~ 0 ~ fA o z W ~ :.i o Z a z_ W p ~ w U Q ~ a a a rn ~ 0 O O O N N r~ N M ~ T c ~ ~ ~ ~ ~ 0 o ~ 2 LL U z ~ ~ Z r rn Q W ~ Q ~ ~ U W ~ Z ~ ~ O t ~ QNOJ ~ ~ U CC N Cn ~ ~ 0 N W Q 0 Z Q U N T r~ X ~. 0 0 r 0 N d ~ ~ Z W W ~ ~ ~ W J W Q LL rn ~ U F- ~ W Z O ~ ~ 0 a z w ~ a a 0 0 J a o } 0 F" Z O Q lu a N_ S ~ } ~„' W U ~ ~ ~ a w F H U ~ r z o O U Z Z O a U N w D w O a z N z W A Z ~ f" `~` ~" > ~ W :7 CW> u c z > cc ~• ~ ~ J ~ Y ~- W V ~ ,'C.i ~ Z a Z O ~ W ~ iy W ~ ~ W~ d ~ W ~z ~_ z ~ ~ EE z a a c ce 6 a 'r F a ~ r '~ '. U ~ w U d J ~F z V -~i w z w ~, ~~ z~ <~ ~, ~o ~z z~ r. ~w y ~~ z r a z ~~. a n z s~"~. Z ~.' d z i x r x ~ °o v °n ~_ N o0 (~ ~C. c+~l 1 ~ U V ~~. ~-. ~ ~ c °o 0 0 0 ~ ~ ~ c, v_ ^~ ~, ~. Q 3 z ~ z N ~_ ."-~ ~ ~ ~ ^~ r ~ r 'r ~ ~ N H ^ ~ ~_ ~ r Sr r~ C ¢' ~ o 0 0 ~ fV !*1 7 ;z7 W W W .•~, r~ ~ J c w w w x ~, :: n r ~ in W N O C ~f i ~~ ~I ~~ u ~ ^ r+ r II a~~ d ~ Z~ L 4 ~ ~ I J - ~ I II ~ ~ ~ ~ a s ~ i W cq Z z z Q W > z > c~ oaw Q ~ -~. Z G ~ Z t- W F- ~ W ~ W W ~~ ~z z ~, u z ~T ~~ Z c n z w #a v C`') CO O N C C a 0 Z c o -~ F. v; ~ ~ a ~ 0 o ~ U ~ co c _ ~ cep t W ~ ~ ~ ~ ~ Q ~ ~ i ~ {A W O W ~ s V ~ S ~ ~ ~ z a fl t1 Q z Q ~, z u a Z O ~ W O ~ F- _ z T- ~ N a ~ Q w Z to ., ~ W 4 0 '~ ~_ t ~ ~ c ~ N a ~ ~ ® ~ Z ~ Q -~ ~ Z ~ ~ ~ ~ > °+~x ~ ~ Q Q O Z w O ~ ~ Z t o ° ~ ~ N ~ D O T ~ o } ~ ~ ~ U o o §- ~ z °C ~ ~ tic ~ n. a 9 STATE AID FOR LOCAL TRANSPORTATION July 2009 SUPPLEMENTAL AGREEMENT Page 1 of 3 City/#~ of Elk River Supplemental Agreement No. 2 FEDERAL PROJECT NO. STPX 7109(112) STATE PROJECT NO. 204-104-07 LOCAL PROJECT NO. 226-069 CONTRACT NO. CONTRACTOR NAME ADDRESS CITY STATE ZIP R.L. Larson Excavating, Inc. 2255 12th St. SE St. Cloud MN 56304 LOCATION OF WORK: TOTAL SUPPLEMENTAL AGREEMENT AMOUNT Topsoil blending - 38+00 to 74+00 and 300+00 to 308+74 $95,778.00 Steel sheet piling shoring - 56+85 to 57+55 Modular block retaining wall Minnesota School of Business - 5+80 to 7+00 Phis Contract is between the Local Government Entity and Contractor as follows: WHEREAS: This Contract provides for, among other things, construction of a collector roadway and city utilities; and WHEREAS: This Contract further provides for soil retainage by means of steel sheet pilling; and WHEREAS: The Contract provides for topsoil spreading; and WHEREAS: The contractor has provided additional soil boring data showing the conditions differ from those found in the project geotechnical investigation; and WHEREAS: The onsite topsoil material is marginal in organic content and its ability to sustain reasonable growth; and WHEREAS: The conditions differ with the recent construction of the Minnesota school of Business site; and WHEREAS: The Engineer has determined that additional steel sheet piling shoring, Topsoil blending, and additional modular block retaining wall is needed; and WHEREAS: The Engineer has further determined that this constitutes Changed Design. NOW, THEREFORE, IT IS MUTUALLY AGREED AND UNDERSTOOD THAT: 1. The Contractor will provide additional steel sheet pile and tie backs as shown in design by Wenzel Engineering Dated 7/6/09 between stations 56+85 and 57+55 2. The contractor will blend the salvage topsoil with the excavated peat material at a ratio of 50% topsoil / 50% peat prior to respreading on all disturbed areas except 4+00 to 38+00 STATE AID FOR LOCAL TRANSPORTATION July 2009 SUPPLEMENTAL AGREEMENT Page 2 of 3 3. The Contractor will construct a two tier modular block retaining wail from station 5+80 to 7+00 adjacent to the Minnesota School of Business with steps to provide access required by Elk River Fire Department. 4. Contract time will not be revised except as may be provided in Mn1DOT Specification 1806. 5. The Contractor will not make claim of any kind or character whatsoever for any other costs or expenses that he may have incurred or that may be hereafter incurred in performing the work and furnishing the materials required by this Agreement. COST BREAKDOWN Funding *Category Item No. Description Unit Unit Price Quantity Amount Negotiated Items and Force Account Eligible 2105.501 Topsoil CY $3.00 8,500 $25,500.00 Roadway Blending (P) Eligible 2452.601 Steel Sheet LS $50,331.00 1 $50,331.00 Roadway Pilling (tie back) Eligible 2411.618 Modular Block SFF $20.65 800 $16,520.00 Roadway retaining wall Eligible 2411.618 Modular Block SF $30.00 40 $1,200.00 Roadway Steps Storm 2503.541 restock storm sewer LS $699.20 1 $699.20 Sewer structures Storm 2503.602 Connect to exist EACH $764.00 2 $1,528.00 Sewer storm structure STATE AID FOR LOCAL TRANSPORTATION July 2009 SUPPLEMENTAL AGREEMENT Fage 3 of s Net change this Agreement -increase in contract amount of $95,778.00 Distribution of funds -Eligible Roadway increase of $93,551.00 Storm sewer increase of $2,227.00 *Funding category is required for federal projects. Approved by /'' Approved by Project ` ~, Engineer: Contractor: ++ii ww Print Name: Terry Maurer Print Name: ~rf^~ tt~l"'~ Ak. Date: 7-29-08 Phone: (763)635-1051 Date: ~' i ~ - d ~ Phone: 3~ '-6 ~ y ~O n~ Original to Project Engineer; Copy to Contractor Once contract has been fully executed, forward a copy to DSAE for funding review: The State of Minnesota is not a participant in this contract; signing by the District State Aid Engineer is for FUNDING PURPOSES ONLY. Reviewed for compliance with State and Federal Aid RuleslPolicy. Eligibility does not guarantee funds will be available. This project is eligible for: _ Federal Funding _ State Aid Funding _ Local funds District State Aid Engineer: Date: