Loading...
5.6. & 5.7. SR 09-21-2009REQUEST FOR ACTION To Item Number Ci Council 5.6. & 5.7. Agenda Section Meeting Date Prepared by Communi Develo ment Se tembex 21, 2009 Lori ohnson, Ci Administrator Item Description Reviewed by 5.6. Request by Elk River Landfill, Inc. for Land Use Amendment to change the Land Use of Certain Reviewed by Property from Mining to Landfill, Public Hearing- Case No. LU 09-01 and 5.7. Request by Elk River Landfill, Inc. for Rezoning to change the zoning from Al (ME) Agricultural Conservation (Mineral Excavation) to AI (SWF), Agricultural Conservation (Solid Waste Facility), Public Heari -Case No. ZC 09-01 Action Requested Consider request by Elk River Landfill, Inc. (ERL) fox a land use amendment to change the land use of certain property from mining to landfill, and to rezone to change the zoning from Al (ME) agricultural conservation (mineral excavation) to AI (SWF), agricultural conservation (solid waste facility). Action to deny or approve these items must be taken by September 26, 2009. Background/Discussion At the September 14, 2009, Council worksession, ERL representatives presented their design modifications as submitted to the City on September 8. ERL's request, however, remains the same as originally submitted, which is to amend the land use for 109 acres known as the Southern Development Area (SDA) from mining to landfill, and to rezone those 109 acres from agricultural conservation (mineral excavation) to agricultural conservation (solid waste facility). In response to ERL's design modifications, Hoisington Koegler Group, Inc. (HKGi) updated the property and host fee annual impact and employment estimates and prepared revised charts that were included in the September 14 staff report. Based on the design modifications, there is still a sizable difference in the future property tax revenue generated under the two scenarios of expansion as requested and no expansion. The design modifications to add approximately 23 acres to future commercial development narrow the gap in tax revenues. The reduction in landfill footprint and additional commercial development area reduces but does not eliminate the substantial difference in future market value and property tax revenue that could be generated if there is no landfill expansion. At the August 17 meeting, the City Council scheduled another public hearing so that the public may have the opportunity to express its views on the information presented at the September 14 meeting. Therefore, the Mayor must open the public hearing to take additional public comment on ERL's request for a land use amendment and rezoning. S:\Council\Lori\2009\Landfill memo 09 21 09.doc Finally, the Council must take action on this item by September 26, 2009. City Attorney Peter Beck has prepared revised resolutions for Council consideration based on the design modifications submitted by ERL. Action of the Council to approve or deny ERL's applications as noted above must be taken by adopting the appropriate resolution to either approve or deny the request for a land use amendment and rezoning of 109 acres. Attachments ^ Resolution Approving the Application of the Elk River Landfill, Inc. for a Comprehensive Plan Amendment and Rezoning to Allow Expansion of the Elk River Landfill (Requires four votes for approval.) ^ Resolution Denying the Application of the Elk River Landfill, Inc. for a Comprehensive Plan Amendment and Rezoning to Allow Expansion of the Elk River Landfill ^ Comment Letters from Angela. Mathison, Ridges of Rice Lake Resident; Michael Caron, Tiller Corporation; and Wayne Hanson, Great River Energy Action Motion by Second by Vote Follow Up S:\Council\Lori\2009\Landfill memo 09 21 09.doc RESOLUTION 09- A Resolution Approving the Application of Elk River Landfill, Inc. for a Comprehensive Plan Amendment and Rezoning to Allow Expansion of the Elk River Landfill WHEREAS, Elk River Landfill, Inc. (ERL), a wholly-owned subsidiary of Waste Management, Inc. (WMI), is the owner and operator of the Elk River Landfill (Landfill); and WHEREAS, Capital Land Group, a land holding company for Tiller Corporation (Tiller), is the owner of an approximately 109-acre parcel of land identified as the Southern Development Area (SDA) located immediately south of the existing Landfill; and WHEREAS, ERL and Tiller have submitted a land use application (Application) to the City requesting: An amendment to the City's 2004 Comprehensive Plan to amend the Land Use Map Element of the Comprehensive Plan to change the land use designation of the 109- acre SDA from "Mining" to "Landfill"; and 2. An amendment to the City of Elk River Zoning Map to rezone the 109-acre SDA from A-1(ME), Agricultural Conservation (Mineral Excavation), to A-1(SWF), Agricultural Conservation (Solid Waste Facility); and WHEREAS, pursuant to the requirements of Minnesota Statutes and the Elk River City Code, the Application was referred to the City of Elk River Planning Commission for the purpose of holding a public hearing and making a recommendation to the Elk River City Council on the Application; and WHEREAS, the Planning Commission held a public hearing on the Application on June 9, 2009, at which time ERL, WMI, Tiller and their consultants were provided as much time as they desired to present the Application and all information and data they desired in support of the Application; and WHEREAS, the Planning Commission took testimony from all members of the public who desired to speak at the June 9, 2009 public hearing; and WHEREAS, the Planning Commission closed its public hearing on the Application on June 9, 2009, but continued its discussion of the Application to a special meeting on June 23, 2009; and WHEREAS, ERL, WMI and Tiller were provided the opportunity to submit additional testimony and written materials for the record prior to and at the Planning Commission's June 23, 2009 continued discussion of the Application; and WHEREAS, on June 23, 2009, the Elk River Planning Commission adopted a resolution recommending to the Elk River City Council that the Application for a comprehensive plan amendment and rezoning of the SDA be denied; and WHEREAS, the Elk River City Council, on July 6, 2009, held a public hearing on the Application and considered the Planning Commission's recommendation; and WHEREAS, ERL, WMI, Tiller and all members of the public desiring to speak at the July 6, 2009 public hearing before the City Council were provided the opportunity to do so; and WHEREAS, all written materials submitted by ERL, WMI, Tiller, and all other members of the public prior to and at the public hearing on July 6, 2009 were accepted into the record; and WHEREAS, during the July 6, 2009 public hearing, the City Council discussed the merits of the Application, directed that staff prepare alternative resolutions denying and approving the Application, and continued the public hearing to its regular meeting of August 17, 2009, in order to provide ERL, WMI, and Tiller the opportunity to present additional materials to address issues raised in the staff reports, during the public hearing, and by the City Council during their discussion; and 2 WHEREAS, on August 17, 2009, the Elk River City Council continued with the public hearing on the Application and provided ERL, WMI and Tiller, as well as all members of the public desiring to do so, the opportunity to present additional testimony and written evidence to the City Council; and WHEREAS, after all parties desiring to present testimony and offer evidence for or against the Application had had the opportunity to do so, the Elk River City Council closed the public hearing on the Application and continued its discussion of the Application; and WHEREAS, by letter dated July 15, 2009, and at the August 17, 2009 City Council hearing, ERL requested an opportunity to present additional materials and a revised plan to the City Council in a workshop session; and WHEREAS, at the close of its session on August 17, 2009, the Elk River City Council directed: • That any additional materials be submitted so that a staff report could be distributed to the City Council on September 8, 2009; • That the Application be placed on the City Council's regular workshop agenda for September 14, 2009; • That the September 14, 2009 workshop session regarding the landfill be a joint meeting with the City of Elk River Planning Commission; and • That the Application be scheduled for another public hearing at the City Council's regularly scheduled meeting of September 21, 2009; and WHEREAS, representatives of ERL and City Staff met on August 25, 2009 and September 8, 2009 to review additional materials submitted by ERL regarding the Application, including a revised plan for the landfill expansion, a report entitled "Is Landfill Expansion a Good Investment for Elk River" (the "Voith Report") and a letter dated September 1, 2009 (revised September 8, 3 2009) outlining design modifications to the expansion proposal, the end use plan for the landfill, and other issues; and WHEREAS, Ciry Staff and City consultants reviewed the revised plans, the Voith Report, the September 8, 2009 letter and all other materials submitted by ERL, and prepared a staff report which was delivered to the City Council and Planning Commission, along with all of the materials submitted by ERL, on September 8, 2009; and WHEREAS, the City Council and Planning Commission met in joint workshop session on September 14, 2009 to discuss the materials submitted by ERL, including the revisions to the expansion proposal for the Landfill; and WHEREAS, ERL was provided an opportunity to present its revised plans and proposed design modifications for the expansion to the Ciry Council and the Planning Commission at the September 14, 2009 workshop session and the City Council had the opportunity to discuss and ask questions regarding the revised proposal; and WHEREAS, on September 21, 2009 the Elk River Ciry Council held a public hearing on the Application and provided ERL, WMI and Tiller, as well as all members of the public desiring to do so, the opportunity to present additional testimony and comment on the Application, as revised, and to submit additional written evidence; and WHEREAS, after all parties desiring to present testimony and offer evidence for or against the Application had had the opportunity to do so, the Elk River City Council closed the public hearing on the Application, continued its discussion of the Application, and reached the decision incorporated in this resolution; and WHEREAS, ERL has agreed in writing to an extension of the City's time deadline for acting on the application under Minnesota Statutes, Section 15.99 to September 26, 2009. 4 NOW, THEREFORE, the City Council of the City of Elk River makes the following Findings of Fact and Decision with respect to the Application of ERL, WMI, and Tiller for a comprehensive plan amendment and rezoning of the SDA to allow expansion of the Landfill: FINDINGS OF FACT The Landfill was first approved to operate on 40 acres of land in 1971 and first permitted by the Minnesota Pollution Control Agency in 1972. 2. The Landfill was granted its first approvals and permits by the City of Elk River pursuant to the City's Solid Waste Facilities Ordinance in 1988. 3. In 1997, the City granted approval for the Landfill to expand the area approved for Mixed Solid Waste (MSW) disposal from its original 40 acres to the current 93-acre footprint. 4. In 1988, the Landfill received approval from Livonia Township to expand the area approved for construction and demolition debris disposal (C & D) to a total permitted footprint of 75 acres. The Mixed Solid Waste and Construction and Demolition Debris operations at the Landfill therefore currently cover 168 acres. 6. The Application originally proposed the development of additional MSW disposal space on 8.6 acres on the southern most portions of existing Landfill property and on 60.2 acres of the SDA, an increase in the MSW disposal area within the Landfill from the existing 93 acres to a total of 162 acres, or an expansion of approximately 75 percent. 7. As revised, the Application proposes an increase in the MSW disposal area within the Landfill of 49.3 acres, an expansion of over 50%. 8. Total MSW and C & D disposal areas at the Landfill would be approximately 217 acres if the Application is approved. The proposed expansion of the Landfill would extend the life of the Landfill beyond its current expected closing date. The Application as revised proposes that the Landfill would close no later than 2029 if the Application is approved. 10. The City of Elk River has been proactively planning for its future and regulating solid waste facilities since the 1980's. The City adopted its Solid Waste Facilities Ordinance in 1986, and the Landfill was rezoned to the Solid Waste Facilities Overlay Zoning District in 1988. 11. The City adopted its first growth management plan in 1988 and its first comprehensive plan in 1995. The City's current comprehensive plan (the Comprehensive Plan) was adopted on August 16, 2004. 12. The 2004 Comprehensive Plan consists of 13 elements, including the Land Use Element. The Land Use Plan incorporated in the Land Use Element of the Comprehensive Plan designates the current Landfill as "Landfill" and the proposed expansion area (the SDA) as "Mining". The designation of the SDA as Musing has not been changed since adoption of the Comprehensive Plan in 2004. 13. Changing the designation of the SDA from Mining to Landfill on the Land Use Map requires the approval and adoption of an amendment to the Comprehensive Plan by the City Council, as provided by Minnesota Statutes. 14. The Comprehensive Plan states that it should not be amended capriciously and that the following questions should be considered when changes to the Comprehensive Plan axe proposed: Is the project consistent with the Land Use Plan? • Does the project move Elk River towards its vision for the future? • Is the project consistent with the policies contained the Comprehensive Plan? 6 15. Policies set forth in the Comprehensive Plan which are relevant to the Application include: • Provide a balanced land use pattern which supports a sustainable mix of jobs and housing. • Guide the scale of development to be consistent with the surrounding land uses and general character. • Guide commercial land use to areas that can utilize an appropriately-designed transportation system without infringing upon residential neighborhoods. • Allow commercial areas to develop when they can be designed to be compatible with surrounding land uses. • Include adequate buffering of commercial and industrial developments and adjacent to non-compatible land uses. • Require adequate transition of buffers between differing, non-compatible land uses, making use of natural land characteristics, whenever possible. • Require development of proposals to consider the impacts on transportation and natural systems beyond the boundaries of the individual projects. 16. Throughout the Comprehensive Plan there is an emphasis on attracting commercial/industrial development. This is important to the City as this type of development builds a community's tax base and creates more job opportunities. 17. Another fundamental element mentioned throughout the Comprehensive Plan is the need to establish and maintain a positive community image by maintaining the edges and buffers that define and protect adjacent land uses. 18. Preservation of open spaces is also an important policy and goal of the Comprehensive Plan. 19. The Comprehensive Plan provides that the gravel mining area of the City, which is located along both sides of North Highway 169 and includes the SDA, be guided for future development of commercial and industrial uses. This area of the City is envisioned by the City Council as the future economic engine of the City. The goal is to have this area develop with commercial and industrial uses as the gravel is mined out. The tax base generated by commercial 7 and industrial development in this area is intended to support the financial viability of residential development throughout the City by making it possible to maintain municipal services without increasing taxes. Although this is very long range planning, and there are not yet timetables for extending public utilities into this area to serve those future uses, this is the vision of the Comprehensive Plan and the City Council for this area of the City. The SDA is also located adjacent to the future Highway 169/2215` Avenue Interchange, which has great potential for future commercial/industrial development. 20. The 2004 Comprehensive Plan was prepared with the assistance of the planning firm of Hoisington Koegler Group, Inc.(HKGi). In anticipation of the proposed expansion of the Landfill the City retained HKGi to take a closer look at the potential impacts of an expansion of the Landfill on the gravel mining area of the City. HKGi's report, the North Highway 169 Land Use Study, dated November 10, 2008, identified a number of potential impacts related to an expansion of the Landfill and suggested land use, transportation and aesthetic strategies for addressing these impacts. 21. Following receipt of the Application to expand the Landfill, the City retained HKGi to take a closer look at the immediate area which would be potentially impacted by a Landfill expansion and to analyze the potential financial and fiscal impacts on the City of an expansion of the Landfill. HKGi's report on these issues is dated June 2, 2009, was subsequently updated on June 15, 2009, and was updated again on September 8, 2009, following submission by ERL of its revised plan for expansion of the Landfill. (The HKGi November 10, 2008, June 6, 2009, June 15, 2009 and September 8, 2009 reports are hereafter collectively referred to as the "HKGi reports".) 22. The HKGi reports project potential significant impacts of Landfill expansion on economic development in this area of the City and on future tax revenues generated from the SDA and the surrounding area. 8 23. ERL, WMI, Tiller and their consultants have strongly contested the methodology and findings of the HKGi reports, and the City Council has listened to and carefully considered the evidence and testimony presented by the applicants and their consultants. The City Council also recognizes the inherent difficulty in attempting to project the potential impacts of a current land use on future development which may or may not occur decades from now. 24. The City Council recognizes that there are positive economic impacts to the City while operations at the Landfill are on-going, including the host fees which the City collects from the Landfill and the business which ERL does with local residents and businesses. These economic benefits to the city will be extended if the Landfill expands. 25. The City Council fords that the revisions to the Application proposed by ERL, including: reducing the additional MSW disposal space from 60.2 acres to 49.3 acres; increasing the area available for future development at the Highway 169/22150 Avenue Interchange from 10 acres to 33 acres; and shortening the life span of the Landfill from a closure date of 2033 to 2029; have addressed the concerns the City Council had with the expansion as proposed in the original Application. 26. The City Council finds that ERL and WMI have been excellent corporate citizens and have made every effort to eliminate or mitigate impacts from the Landfill, such as litter, truck traffic, noise and odor. 27. It is the City Council's conclusion, from all of the evidence submitted and the testimony taken, that: (1) Expansion of the Landfill will extend the period of time that the City, its residents and its businesses will benefit from the host fees and other positive economic impacts which ongoing operations at the Landfill generate; 9 (2) The negative impacts associated with an operating Landfill can be mitigated through appropriate regulations and conditions; (3) The long term negative economic impacts identified in the KHGi reports are somewhat speculative, given the lengthy time between now and the potential impacts; (4) The Landfill could, if expanded and operated appropriately, generate some commercial and industrial development in the area and some positive economic impacts for the Ciry; (5) Expansion of the Landfill could generate some additional permanent open space in the City for future public benefit; (6) The balance between the benefits of a Landfill expansion and the potential impacts weigh in favor of an expansion, if an expansion is done, and the Landfill is operated, appropriately. DECISION THEREFORE, the City Council of the City of Elk River makes the following Decision with respect to the Application to amend the Comprehensive Plan of the City of Elk River to redesignate the SDA from Mining to Landfill and to rezone the SDA from A-1 (ME) to A-1 (SWF): A. All of the Findings of Fact and Recitals set forth in this Resolution are hereby adopted and incorporated within the City Council's Decision on this matter. B. The record in this matter shall include all materials submitted to the City and presented to the Planning Commission and City Council, including those materials presented in the staff reports, by the City staff and by the City's consultants, and all materials and testimony 10 submitted by or on behalf of ERL, WMI, Tiller and their consultants, and all testimony received from the public, as of the date of this Resolution. C. The Application of ERL to amend the Land Use Map Element of the City of Elk River 2004 Comprehensive Plan to redesignate the 109-acre Southern Development Area from the Land Use category "Mining" to the Land Use category "Landfill", and to rezone the SDA from A-1 (ME) to A-1 (SW~, is hereby granted. D. This approval is specifically conditioned on ERL submitting a revised Application for and receiving approval of, a Conditional Use Permit for the modified expansion plan presented to the City Council on September 8 and September 21, 2009. THIS RESOLUTION PASSED AND ADOPTED this 21st day of September, 2009. Stephanie Klinzing, Mayor Tina Allard, City Clerk GP:2629147 v2 11 RESOLUTION 09- A Resolution Denying the Application of Elk River Landfill, Inc. for a Comprehensive Plan Amendment and Rezoning to Allow Expansion of the Elk River Landfill WHEREAS, Elk River Landfill, Inc. (ERL), a wholly-owned subsidiary of Waste Management, Inc. (WMI), is the owner and operator of the Elk River Landfill (Landfill); and WHEREAS, Capital Land Group, a land holding company for Tiller Corporation (Tiller), is the owner of an approximately 109-acre parcel of land identified as the Southern Development Area (SDA) located immediately south of the existing Landfill; and WHEREAS, ERL and Tiller have submitted a land use application (Application) to the City requesting: An amendment to the City's 2004 Comprehensive Plan to amend the Land Use Map Element of the Comprehensive Plan to change the land use designation of the 109- acre SDA from "Mining" to "Landfill"; and 2. An amendment to the City of Elk River Zoning Map to rezone the 109-acre SDA from A-1(ME), Agricultural Conservation (Mineral Excavation), to A-1(SWF), Agricultural Conservation (Solid Waste Facility); and WHEREAS, pursuant to the requirements of Minnesota Statutes and the Elk Rivex City Code, the Application was referred to the City of Elk River Planning Commission for the purpose of holding a public hearing and making a recommendation to the Elk River City Council on the Application; and WHEREAS, the Planning Commission held a public hearing on the Application on June 9, 2009, at which time ERL, WMI, Tiller and their consultants were provided as much time as they desired to present the Application and all information and data they desired in support of the Application; and WHEREAS, the Planning Commission took testimony from all members of the public who desired to speak at the June 9, 2009 public hearing; and WHEREAS, the Planning Commission closed its public hearing on the Application on June 9, 2009, but continued its discussion of the Application to a special meeting on June 23, 2009; and WHEREAS, ERL, WMI and Tiller were provided the opportunity to submit additional testimony and written materials for the record prior to and at the Planning Commission's June 23, 2009 continued discussion of the Application; and WHEREAS, on June 23, 2009, the Elk River Planning Commission adopted a resolution recommending to the Elk River City Council that the Application for a comprehensive plan amendment and rezoning of the SDA be denied; and WHEREAS, the Elk River City Council, on July 6, 2009, held a public hearing on the Application and considered the Planning Commission's recommendation; and WHEREAS, ERL, WMI, Tiller and all members of the public desiring to speak at the July 6, 2009 public hearing before the City Council were provided the opportunity to do so; and WHEREAS, all written materials submitted by ERL, WMI, Tiller, and all other members of the public prior to and at the public hearing on July 6, 2009 were accepted into the record; and WHEREAS, during the July 6, 2009 public hearing, the City Council discussed the merits of the Application, directed that staff prepare alternative resolutions denying and approving the Application, and continued the public hearing to its regular meeting of August 17, 2009, in order to provide ERL, WMI, and Tiller the opportunity to present additional materials to address issues raised in the staff reports, during the public hearing, and by the City Council during their discussion; and 2 WHEREAS, on August 17, 2009, the Elk River City Council continued with the public hearing on the Application and provided ERL, WMI and Tiller, as well as all members of the public desiring to do so, the opportunity to present additional testimony and written evidence to the City Council; and WHEREAS, after all parties desiring to present testimony and offer evidence for or against the Application had had the opportunity to do so, the Elk River City Council closed the public hearing on the Application and continued its discussion of the Application; and WHEREAS, by letter dated July 15, 2009, and at the August 17, 2009 Ciry Council hearing, ERL requested an opportunity to present additional materials and a revised plan to the City Council in a workshop session; and WHEREAS, at the close of its session on August 17, 2009, the Elk River City Council directed: • That any additional materials be submitted so that a staff report could be distributed to the Ciry Council on September 8, 2009; • That the Application be placed on the City Council's regular workshop agenda for September 14, 2009; • That the September 14, 2009 workshop session regarding the landfill be a joint meeting with the City of Elk River Planning Commission; and • That the Application be scheduled for another public hearing at the City Council's regularly scheduled meeting of September 21, 2009; and WHEREAS, representatives of ERL and Ciry Staff met on August 25, 2009 and September 8, 2009 to review additional materials submitted by ERL regarding the Application, including a revised plan for the landfill expansion, a report entitled "Is Landfill Expansion a Good Investment for Elk River" (the `~oith Report") and a letter dated September 1, 2009 (revised September 8, 2009) outlining design modifications to the expansion proposal, the end use plan for the landfill, and other issues; and WHEREAS, City Staff and City consultants reviewed the revised plans, the Voith Report, the September 8, 20091etter and all other materials submitted by ERL, and prepared a staff report which was delivered to the City Council and Planning Commission, along with all of the materials submitted by ERL, on September 8, 2009; and WHEREAS, the City Council and Planning Commission met in joint workshop session on September 14, 2009 to discuss the materials submitted by ERL, including the revisions to the expansion proposal for the Landfill; and WHEREAS, ERL was provided an opportunity to present its revised plans and proposed design modifications for the expansion to the City Council and the Planning Commission at the September 14, 2009 workshop session and the City Council had the opportunity to discuss and ask questions regarding the revised proposal; and WHEREAS, on September 21, 2009 the Elk River City Council held a public hearing on the Application and provided ERL, WMI and Tiller, as well as all members of the public desiring to do so, the opportunity to present additional testimony and comment on the Application, as revised, and to submit additional written evidence; and WHEREAS, after all parties desiring to present testimony and offer evidence for or against the Application had had the opportunity to do so, the Elk River City Council closed the public hearing on the Application, continued its discussion of the Application, and reached the decision incorporated in this resolution; and WHEREAS, ERL has agreed in writing to an extension of the City's time deadline for acting on the application under Minnesota Statutes, Section 15.99 to September 26, 2009. 4 NOW, THEREFORE, the Ciry Council of the City of Elk River makes the following Findings of Fact and Decision with respect to the Application of ERL, WMI, and Tiller for a comprehensive plan amendment and rezoning of the SDA to allow expansion of the Landfill: FINDINGS OF FACT The Landfill was first approved to operate on 40 acres of land in 1971 and first permitted by the Minnesota Pollution Control Agency in 1972. The Landfill was granted its first approvals and permits by the Ciry of Elk River pursuant to the City's Solid Waste Facilities Ordinance in 1988. 3. In 1997, the Ciry granted approval for the Landfill to expand the area approved for Mixed Solid Waste (MSW) disposal from its origina140 acres to the current 93-acre footprint. 4. In 1988, the Landfill received approval from Livonia Township to expand the area approved for construction and demolition debris disposal (C & D) to a total permitted footprint of 75 acres. The Mixed Solid Waste and Construction and Demolition Debris operations at the Landfill therefore currently cover 168 acres. The Application originally proposed the development of additional MSW disposal space on 8.6 acres on the southern most portions of existing Landfill property and on 60.2 acres of the SDA, an increase in the MSW disposal area within the Landfill from the existing 93 acres to a total of 162 acres, or an expansion of approximately 75 percent. 7. As revised, the Application proposes an increase in the MSW disposal area within the Landfill of 49.3 acres, an expansion of over 50%. 8. Total MSW and C & D disposal areas at the Landfill would be approximately 217 acres if the Application is approved. 5 The proposed expansion of the Landfill would extend the life of the Landfill beyond its current expected closing date. The Application as revised proposes that the Landfill would close no later than 2029 if the Application is approved. 10. The City of Elk River has. been proactively planning for its future and regulating solid waste facilities since the 1980's. The City adopted its Solid Waste Facilities Ordinance in 1986, and the Landfill was rezoned to the Solid Waste Facilities Overlay Zoning District in 1988. 11. The City adopted its first growth management plan in 1988 and its first comprehensive plan in 1995. The City's current comprehensive plan (the Comprehensive Plan) was adopted on August 16, 2004. 12. The 2004 Comprehensive Plan consists of 13 elements, including the Land Use Element. The Land Use Plan incorporated in the Land Use Element of the Comprehensive Plan designates the current Landfill as "Landfill" and the proposed expansion area (the SDA) as "Mining". The designation of the SDA as Mining has not been changed since adoption of the Comprehensive Plan in 2004. 13. Changing the designation of the SDA from Mining to Landfill on the Land Use Map requires the approval and adoption of an amendment to the Comprehensive Plan by the City Council, as provided by Minnesota Statutes. 14. The Comprehensive Plan states that it should not be amended capriciously and that the following questions should be considered when changes to the Comprehensive Plan are proposed: Is the project consistent with the Land Use Plan? Does the project move Elk River towards its vision for the future? Is the project consistent with the policies contained the Comprehensive Plan? 6 15. Policies set forth in the Comprehensive Plan which are relevant to the Application include: • Provide a balanced land use pattern which supports a sustainable mix of jobs and housing. • Guide the scale of development to be consistent with the surrounding land uses and general character. • Guide commercial land use to areas that can utilize an appropriately-designed transportation system without infringing upon residential neighborhoods. • Allow commercial areas to develop when they can be designed to be compatible with surrounding land uses. • Include adequate buffering of commercial and industrial developments and adjacent to non-compatible land uses. • Require adequate transition of buffers between differing, non-compatible land uses, making use of natural land characteristics, whenever possible. • Require development of proposals to consider the impacts on transportation and natural systems beyond the boundaries of the individual projects. 16. Throughout the Comprehensive Plan there is an emphasis on attracting commercial/industrial development. This is important to the City as this type of development builds a community's tax base and creates more job opportunities. 17. Another fundamental element mentioned throughout the Comprehensive Plan is the need to establish and maintain a positive community image by maintaining the edges and buffers that define and protect adjacent land uses. 18. Preservation of open spaces is also an important policy and goal of the Comprehensive Plan. 19. The Comprehensive Plan provides that the gravel mining area of the City, which is located along both sides of North Highway 169 and includes the SDA, be guided for future development of commercial and industrial uses. This area of the City is envisioned by the City Council as the future economic engine of the City. The goal is to have this area develop with commercial and industrial uses as the gravel is mined out. The tax base generated by commercial 7 and industrial development in this area is intended to support the financial viability of residential development throughout the City by making it possible to maintain municipal services without increasing taxes. Although this is very long range planning, and there are not yet timetables for extending public utilities into this area to serve those future uses, this is the vision of the Comprehensive Plan and the City Council fox this area of the City. The SDA is also located adjacent to the future Highway 169/2215` Avenue Interchange, which has great potential for future commercial/industrial development. 20. The 2004 Comprehensive Plan was prepared with the assistance of the planning firm of Hoisington Koegler Group, Inc.(HKGi). In anticipation of the proposed expansion of the Landfill the City retained HKGi to take a closer look at the potential impacts of an expansion of the Landfill on the gravel mining area of the City. HKGi's report, the North Highway 169 Land Use Study, dated November 10, 2008, identified a number of potential impacts related to an expansion of the Landfill and suggested land use, transportation and aesthetic strategies for addressing these impacts. 21. Following receipt of the Application to expand the Landfill, the City retained HKGi to take a closer look at the immediate area which would be potentially impacted by a Landfill expansion and to analyze the potential financial and fiscal impacts on the City of an expansion of the Landfill. HKGi's report on these issues is dated June 2, 2009, was subsequently updated on June 15, 2009, and was updated again on September 8, 2009, following submission by ERL of its revised plan for expansion of the Landfill. (The HKGi November 10, 2008, June 6, 2009, June 15, 2009 and September 8, 2009 reports are hereafter collectively referred to as the "HKGi reports".) 22. The HKGi reports project potential significant impacts of Landfill expansion on economic development in this area of the City and on future tax revenues generated from the SDA and the surrounding area. 23. ERL, WMI, Tiller and their consultants have strongly contested the methodology and findings of the HKGi reports, and the City Council has listened to and carefully considered the evidence and testimony presented by the applicants and their consultants. The City Council also recognizes the inherent difficulty in attempting to project the potential impacts of a current land use on fixture development which may or may not occur decades from now. 24. However, it is the conclusion of the City Council that an expansion of the Landfill will inevitably have a long term negative impact on economic development within and tax revenue generated by at least a portion of the North Highway 10 area of the City, in particular the SDA and the area immediately surrounding the SDA. Given the importance of this area to the future of the City, the City Council cannot ignore these impacts. 25. The City Council has also considered potential impacts of the Landfill expansion on the Economic Development Strategic Plan prepared by the Elk River Economic Development Authority and the Elk River Housing and Redevelopment Authority. Expansion of the Landfill could have a negative impact on the following goals in that plan: • To diversify the commercial/industrial tax base of the City to strive for higher quality developments including professional services, corporate campuses, energy related and technology businesses; • To preserve high priority commercial areas for development; • To identify and project a higher image and vision for the City that enables the City to successfizlly recruit and retain the desired commercial/industrial development identified above. 26. The City Council finds that an additional expansion of the Landfill, beyond that approved in 1997 by the City and in 1998 by Livonia Township, is not consistent with the City's policies and goals as reflected in the City's Comprehensive Plan and the work of the its Economic 9 Development Authority, Housing and Redevelopment Authority, Planning Commission and City Council. 27. The City Council finds that image is a huge driver in encouraging development in the community, that having the Landfill located at the northern entrance to the City adversely impacts the image the City wishes to portray to visitors, residents and potential new businesses, and that expanding the Landfill and extending its life span will significantly increase these negative impacts. 28. The City Council further finds that expansion of the Landfill will prevent future development, at a minimum, in that portion of the SDA which will be filled with Mixed Solid Waste, and could discourage the type of high quality commercial/industrial development which the City is seeking for the important area of the City immediately surrounding the SDA, including the critical area around the future interchange at Highway 169 and 2215` Avenue. 29. The City Council recognizes that there are some positive economic impacts related to the Landfill, including the host fees which the City collects from the Landfill and the business which ERL does with local residents and businesses. However, these are short term economic benefits which will end once the Landfill closes. At that point, the portion of the SDA filled with MSW will generate virtually no revenue to the City, and tax revenues generated from the immediate surrounding area will be negatively impacted to some degree. 30. The City Council fords that the Landfill also has non-economic negative impacts on the City and on surrounding residential uses while it is open, including litter on Highway 169 and other public streets from trucks moving to and from the Landfill, the truck traffic itself, road maintenance impacts, noise and odor. Although ERL and WMI have been excellent corporate citizens and have made every effort to mitigate these impacts, they axe not capable of being fully mitigated until the Landfill is closed. Expanding the size and extending the life of the Landfill will prolong the period of time that the City and surrounding residents must endure these impacts. 10 31. The City Council has reviewed and carefully considered, along with all other materials submitted by ERL, the Voith Report. As set forth above, the Council recognizes the potential for some positive economic impacts related to the Landfill. However, the council finds that: The Voith Report overstates the potential positive economic impacts of the Landfill, for the reasons set forth in the September 8, 2009 Memorandum from the City Administrator, which are incorporated in these Findings of Fact; The potential for positive economic impacts is only one of many criteria and considerations to be weighed in making a decision to amend the City's Comprehensive Plan; and • The City Council does not agree that a present value economic analysis of any proposed use should be a determining factor in making a land use decision. 32. The City Council has considered and appreciates the efforts of ERL to mitigate the negative impacts of a landfill expansion, particularly on the important Highway 169/2215` Avenue interchange, by reducing the size of the proposed expansion in the revised proposal and by making an additiona120 acres of land available for potential development at the Interchange. However, the Council fords that the Plan revisions do not outweigh the negative impacts of the proposed expansion, or change the Findings of Fact set forth in this Resolution. 33. It is the City Council's conclusion, from all of the evidence submitted and the testimony taken, that: (1) An expansion of the Landfill will prolong the negative short term impacts of the Landfill on the City and will inevitably have a long term negative impact on the tax base generated from this area of the City; 11 (2) This area of the City is planned to generate the tax base that will support the financial viability of the balance of the City indefinitely; (3) Given the importance of this area to the future of the City, the potential benefits of a Landfill expansion are outweighed by the negative impacts of an expansion; and (4) An amendment of the Land Use Map Element of the City's Comprehensive Plan to expand the area of the City designated for Landfill into the SDA is inconsistent with the policies and goals of the City's Comprehensive Plan and would not be in the best interest of the City, its residents and its taxpayers. DECISION ON LAND USE AMENDMENT THEREFORE, the City Council of the City of Elk River makes the following Decision with respect to the Application to amend the Comprehensive Plan of the City of Elk River to redesignate the SDA from Mining to Landfill: A. All of the reports and materials prepared by City Staff and City Consultants, as well as the Findings of Fact and Recitals set forth in this Resolution, are hereby adopted and incorporated within the City Council's Decision on this matter. B. The record in this matter shall include all materials submitted to the City and presented to the Planning Commission and City Council, including those materials presented in the staff reports, by the City staff and by the City's consultants, and all materials and testimony submitted by or on behalf of ERL, WMI, Tiller and their consultants, and all testimony received from the public, as of the date of this Resolution. C. The Application of ERL to amend the Land Use Map Element of the City of Elk River 2004 Comprehensive Plan to redesignate the 109-acre Southern Development Area from the Land Use category "Mining" to the Land Use category "Landfill" is hereby denied. 12 DECISION ON REZONING The City Council of the City of Elk River further makes the following Decision with respect to the Application of ERL for rezoning of the 109-acre Southern Development Area from A-1 (ME), agricultural conservation (mineral excavation), to A-1 (SWF), agricultural conservation (solid waste facility): A. All of the reports and materials prepared by City Staff and City Consultants, as well as the Findings of Fact and Recitals set forth in this Resolution, are hereby adopted and incorporated within the City Council's decision on this matter B. The record in this matter shall include all materials submitted to the City and presented to the Planning Commission and City Council, including those materials presented in the staff reports, by the City staff and by the City's consultants, and all materials and testimony submitted by or on behalf of ERL, WMI, Tiller and their consultants, and all testimony received from the public as of the date of this resolution. C. Based on all of the above, and on the additional fact that the Application to reguide the SDA from "Mining" to "Landfill" has been denied, so that rezoning the SDA from A-1 (ME) to A-1 (SWF) would result in an inconsistency between the Land Use Map Element of the City's 2004 Comprehensive Plan and the City of Elk River's Zoning Map, the Application to rezone the SDA from A-1 (ME) to A-1 (SWF) is denied. THIS RESOLUTION PASSED AND ADOPTED this 21st day of September, 2009. Stephanie Kluizing, Mayor Tina Allard, City Clerk GP:2629426 v2 13 Comments on the SDA landfill expansion petition by Waste Management, registered by Angela Mathison on behalf of the residents of Ridges of Rice Lake, Elk River, MN. 1. Waste Management is "100% committed" to placing a new 8 burner gas plant on the 109 acre proposed expansion. - The EIS completed in 2006 does not outline plans for a gas plant - Debra Moynihan at MN PCA was contacted. She could not state with any certainty whether the addition of the gas plant would impact the relevance of the EIS. She could not have an answer for us until Monday, September 21St at the earliest. - There has been no commitment from Waste Management as to where that plant would be located on the 109 acre site. 2. There is allegedly some leakage from the old liners in the current site. Has this been addressed and fixed? This should be addressed. If it has been addressed and fixed, do we have evidence that it has been repaired in a permanent fashion? 3. The EIS did not address the issue of ground water safety. The potential health impacts have not been met in regards to the ground water issue. 4. Waste Management has done a poor job in maintaining a visually aesthetic entrance to the current site. The landscaping is poorly maintained and there is garbage throughout the medians and ditches along 169, as well as a terrible odor. Will this problem expand with the expansion of the landfill? It lends itself to a poor welcome into our city and perpetuates our reputation as "the city with the dump". 5. The initial EIS was done with the proposal for the entire 109 acres of land to be used as a lined solid waste dump (9 new cells that would extend to the corner of 221St and 169). Our understanding is that Waste Management has consistently stated that the site would be closed/capped in 2030. - As we understand it, the initial proposal contends that they would reach capacity in 2030 using all 109 acres for lined solid waste dump - The revised proposal was for 60 acres of lined solid waste dump, but still closing in 2030 - The most recent revision is for 40 acres of lined solid waste dump and yet still closing/capping in 2030 - If the initial proposal for 109 acres was going to take them to 2030 to reach capacity, and they now contend that they only need 40 acres, there is high probability that they will reach capacity before 2030. If the permit is granted for the 109 acres, what stops them from expanding that lined footprint to extend the life of the site? 6. The footprint of the landfill can never be used for commercial/residential property. The northern expansion of the city will be stunted by the southern expansion of the landfill. Businesses are not going to want to build next to a landfill and the land being used for the SDA expansion is useless to us until after they have capped the site, at the earliest. That is 21 years from now. Arbor Lakes in Maple Grove is an excellent example of prosperous commercial development. The question should be asked, would that development have been built next to a landfill? 7.Our city is providing a dumping site for trash from all over the state. Only 7.01% comes from Sherburne County. 8. How will the berm be developed? If the landfill expands south and they do not plant very large evergreen trees and a deep berm and maintain it well, the landfill will be fully visible as 169 curves just past 2215`. Those commuters driving north will have astraight-on view of the site instead of having to consciously turn your head to left, as it sits now. 9. There were several concerns from the worksession on Monday, September 14t", 2009: - Again, while WM decreased the footprint of the actual dump site, they are still requesting approval for the entire 109 acres. When questioned about the use of the remaining 69 acres (including the 33.1 acres of commercially developable land), WM communicated inconsistent rationale messages: - - At the beginning of the meeting, they stated that they would not be using the 33.1 acres of developable land. They went on to say that they might need to use it for things like forced main, leachate storage tanks, support items, etc. - - Later, they stated that it would be impossible for them to run the dump with only the 76 acres of land and WILL need to use the developable land. - - Waste Management also noted that they would want to possibly put the HHW and recycling center on developable land and/or use it for infrastructure. - - It was made very clear that Waste Management does not have a plan in place for how they intend to use the developable land. They simply made it clear that they want the land. - Waste Management was asked if they were granted the petition for the 109 acres, what is to prevent them from expanding the footprint farther south? WM indicated that they would stipulate to language in the contract that would prevent them from being able to expand farther south. - - However, our understanding is that this may not entirely preclude them from expanding that footprint. - If the petition is granted to Waste Management, there is no guarantee that they won't be back in 2020 or 2025 initiating this process all over again to expand even farther south. To our knowledge, Waste Management has not agreed to cap and leave the City of Elk River in 2030. One expansion allowance opens the door for subsequent requests. We need to be certain that this is the direction we want to see our city go and this is the face and reputation we want for our city. - In Monday night's worksession, Waste Management addressed the issue of end-use for the land. Waste Management stated, "We are building a golf course on the site in Burnsville." This statement was given in present-tense. They also offered several other examples of end-use projects that they had completed, but with no specifics such as where, how long after the site was capped and photographic or written evidence. After speaking with the MN PCA and the City of Burnsville, that site is still fully operational, and, according to the City of Burnsville, they are not aware of any plans for the end-use of that land. According to Burnsville, "They are still using that site and if there are any plans it won't be for many years to come." - There was a lot of ambiguity from WM at the worksession. They were very non- committal about their plans for the developable land and changed their answers on the use of that land several times. They weren't sure when the mining of the land would be completed, couldn't say where structures and infrastructure would go and went from stating that they would not need to use the developable land to we can't operate without using it. WITHOUT A CONCRETE, SPECIFIC, DESCRIPTIVE PLAN AND TIME-LINE WE DON'T REALLY KNOW WHAT THEIR INTENTIONS ARE. Thank you for taking the time to review these points prior to the next City Council meeting. Angela Mathison 22382 Tipton Street NW Elk River, MN 55330 TILLER CORPORATION C'orparate nffice: PO Box 1480 72110 k3etnlcxk Lane, Suite 2110 Maple. Grove, Minnescata x5311 September 16, 20119 lvlayor anti ~auncil Members City of Elk River 130b5 Grano Parkway Elk River, MN 55330 Re: Elk River Landfill Exp~lnsian 1-lanorable Mayor anc-1 Gau11ci1 iVlembers: Tiller C~rparation ~rnri r'ts vl:urntrtr~ ~tiaisio~rs Barton S~ntl & Gravel C'a, Canauzercial tl~phaltC.ca. 13a1'tK)tl tnte.r[?rISES, lnC'. Yenc~ral: (7d3) 425-41~"t facs~aiilc:: {~63) 425-Tt53 web: u~ww.tilterccarp.cam We write to express our support for Elk River Landfill's rec~juest to change the land use of. our praperty which will. allow for the Southerzl Development Area {SDA} expansion of their landfill. Representatives from Tiller testified before the Planning Camrnissian anti. at Council. meetings and wank sessions about t-he proposed expansion. One of the mitjar points we have made was how our mining plans would be :modified to accornlnodate Elk River Landfill's proposed expansion. The purpose of this letter is to reiterate the timing of our miming can the 109 acre SDA praperty. Our Current M:ining Plans We have our hot rnix asphalt plaint located an the SDA praperty. Presently we supply aggregate materials far this plant from our prt north of the landfill in Livonia. Tl-te mining activity an the SDA property has been law the last five years anal if the landfill cues not expalzd our activity an the SDA property will remain I.ow. However, there are High ciuaiity ag~rcgate reserves al-1 the SDA praperty which represent approximately 20 years of reserves. if the landfill does not expand, our intent would be to continue to mine in Livonia and after concluding our activities to the north., we would begin mare intense mining of the SDA praperty. The Livonia reserves represent 35 to 50 years of aggregate reserves. Assuming the lanclfitl does not expand, we would nat. begin meaningful mining of the SDA property until appraxirnately 2050 {2010 plus ~4C) years}. As mentioned above, the SDA praperty has This Company is an Equal Opportunity Employer Septerlther 1G, 2009 Page 2 of 3 approximately 20 years of reserves. Under this mining plan, the SDA property will not be mined and reclaimed until at least 2070 (2050 start date for intense mining plus -20 years). This mining plan is consistent with the information Tiller supplied the City while the 1994 Elk River Gravel Mi.ni.ng District Environmental Impact Statement (EIS) was being prepared. Table 3.1-1 Land Ownership and Usage of the EIS identifies properties by PID numbers. The PID numbers associated with the 5DA property are shown as being mined through 2070 which is the last year considered in the EIS. Proposed Mining Plans With Landfill Ex~ansi.on However, if the landfill expands, our mining plans will be significantly different. The landfill requires access to the airspace provided by the SDA property at an accelerated rate. To accommodate their requirements we will. expedite our mining of the SDA property through a combination of re-orienting our Livonia mining operation and exporting material from Elk River to our other facilities that currently receive material from other markets. This will have the effect of compressing the timeframe which active mining takes place in this area of Elk River. We believe this compression is desirable and may allow adjacent properties to develop earlier in concert with Elk River Landfill's business park plan. Tiller's operating agreement with Elk River Landfill on HZe SDA property will be require us to progressively remove material from individual landfill cells by certain dates. The dates are reviewed on a regular basis and depending on Elk River Landfill's needs they will be adjusted as necessary. Mining on the entire 109 acre SDA will be completed by Tiller as directed by the new property owner, Elk River Landfill. The accelerated mining rate on the SDA property will not affect Tiller's mining property along County Road 33 and County Road 77 (CR33/77}. The material in the CR33/77 area is used to feed our wash plant operation located at 12450 Ranch Road NW. This operation is izldependent from the operations on our Livonia property anal the SDA property. Final Reclamation Grades and Tiznin~ The intersection of TH 169 and 221st Avenue is proposed to be realigned and built as an interchange. 221st Avenue is also proposed to be extended to the east. The land east of the proposed TH 169/221St Avenue interchange is afi Tower elevations than Iand west of the proposed interchange. In the future the City and area property owners may find it desirable to have the new alignzrent of 221st Avenue west of TH lb9 at an elevation that is Lower than what exists today. We may actually end up with 221st Avenue going under TH 1.69. seF,rel,~hey 7~, 2009 Page 3 of 3 For these reasons, Tiller believes it is essential that the City maintain flexibility with the reclamation grades in this area. It is also important not to establish an exact date for final reclamation until the interchange design and 221ti' Avenue alignment and elevation are certain. If you have any questions please do not hesitate to call. As always we stand ready to provide input to the study of our land, our mining plans and our development aspirations. I znay be reached at (763) 425-4191. Sincerely, Tiller Corporation Michael Caron ,,,. ,~-~~ .,,eft i~.__._-/ Director of Land Use Affairs Miller, Jessica From: Hanson, Wayne GREMG [WHANSON@GREnergy.com] Sent: Friday, September 18, 2009 9:12 AM To: Miller, Jessica Cc: Johnson, Lori Subject: FW: Future of Elk River Power Plant I am OK with you including this in the packet for the city council. From: Hanson, Wayne GRE/MG Sent: Wednesday, September 16, 2009 3:37 PM To: 'mayorer@q.com'; 'nick.zerwas@ci.elk-river.mn.us'; 'iwgump@yahoo.com'; 'westgaard@nsatel.net'; 'pmotin@aol.com' Cc: Rebecca Haug (rhaug@ci.elk-river.mn.us); Lori Johnson (Ijohnson@ci.elk-river.mn.us) Subject: Future of Elk River Power Plant I am providing this additional information to support the City Council decision regarding the expansion of the Elk River landfill. At the August 17 City Council meeting I voiced the importance of retaining the Elk River landfill for receiving rejected materials from the Elk River RDF processing plant. The processing plant converts 80 to 85 percent of the municipal solid waste (MSW) received into fuel for the Elk River power plant. The rejected material from the processing plant averages 70,000 tons a year and has been disposed of in the Elk River landfill for the past 20 years. If the Elk River landfill does not receive the requested expansion and closes, the additional transportation cost to the processing plant for the disposal of this material at the next closest landfill will be about $15/ton or an additional $1 million per year. This additional expense could be a fatal blow to the operation of the processing plant and the Elk River power plant. GRE has also been working closely with Waste Management (WM) to supply the needed MSW to the project. WM clearly understands the importance to the City and also the state of Minnesota to keep the Elk River power plant operating. WM has historically been the supplier of the largest quantity of MSW to this project and they have agreed to continue to support the project at this same level in the future. Without this support from WM, the project clearly will not have sufficient MSW to fuel the Elk River power plant and keep the project viable. The Elk River power plant has continued to operate these past 20 years only because of the availability of refuse derived fuel produced at the Elk River processing plant. GRE has studied other options to fuel the power plant but have been unsuccessful in finding a fuel of sufficient quantity that is priced low enough to keep the facility financially viable. Therefore, if RDF from the Elk River processing plant is not available in the future the project will shut down. The economic impact to the Elk River community will be very significant if this project goes away. Currently, over a $1 million per year in property taxes are paid between the Elk River power plant and the processing plant. These facilities employ over 100 employees, many who live in the Elk River area and support the local economy. The facilities annually infuse into the area economy over $18 million for other operating and maintenance expenses. The Elk River power plant also supports the region by producing reliable, low cost renewable energy. As GRE takes over the ownership and operation of the Elk River processing facility we see many opportunities to provide additional support for the Elk River community from this facility. We are looking at new technologies to improve recycling efficiencies and help solve other waste challenges such as the management of source separated organics from the Elk River area. We are taking a serious look at installing an anaerobic digester as an odorless and effective method to convert organics to electricity. We have also studied ways to more efficiently recover the energy from the fuel in the Elk River power plant. Along this line we have done an engineering study for the installation of a district heating system to take waste heat from the Elk River power plant and heat the Elk River school buildings. This improves the efficiency of the power plant, reduces school district expenses and supports the Energy City program. All these opportunities and benefits may be lost if the landfill expansion is not supported by the City Council and the closing of the Elk River landfill impacts the economic viability of the Elk River power plant and processing plant. Please consider these factors in your decision on the Elk River landfill expansion. If you have any questions, please feel free to call me at 763-445-5818. W N~•y~tas. Director, MN Generation Great River Energy 09/18/2009 12300 Elm Creek Boulevard Maple Grove, MN 55369-4718 753-445-5818 Fax 763-445-6618 whan_son@GREnergy.co_ m NOTICE TO RECIPIENT: The information contained in this message from Great River Energy and any attachments are confidential and intended only for the named recipient(s). If you have received this message in error, you are prohibited from copying, distributing or using the information. Please contact the sender immediately by return email and delete the original message. 09/18/2009 ~' r a ~:: ~ * ~ ~ ,. ~~ 1. ~~ ~.. ~~ ~ ~ r '~°?~ ~ . ~s®uti®n en~n the ~icat~~n ~f ~k war an ~g inc. ®r a ®nnr~h~ns~ve fan r~~nent and ~~~nan t~ ~~® ans~®n ~f the N~~ giver Land~~ WHEREAS, Ells Rive~• Landfill, Znc. ~ERL}, a wholly~o~vned subsidia~~ of Taste Management, inc. ~1M~}, is the ov~nei and opeiato~ of tl~e Ells Rives Landfill ~Landfi~.l.}; and ~IHEREAS, Capital Land Group, a land holding company fo~• Tillex Co~po~ation ~Tille~}, is the owner of an approximately 109-acre pa~•cel of land identified as the Soutlle~n Development Area (SDA) located immediately south of the existing Landfill; and ~1HEREAS, ERL and Tilley ha~re submitted a land use application ~Applicat~on} to the Cit~r requesting. 1. An amendment to tl~.e City's 2004 Comprehensive Plan to amend the Land Use Map Element of the Comprehensive Plan to change the land use designation o£ the 109 acre SDA from "Mining" to "Landfill"; and Z, An amendment to the City of Ells Rivet Zaning Map to rezone the 109~ac~e SDA from A-1 MME}, Ag~icultu~al Conse~~cration ~Minefal Excavation}, to AW l ~S~F}, Ag~icultufal Conservation Solid ~Iaste facility}; and WHEREAS, pursuant to the ~equi~•ements of Minnesota Statutes and the Ells River City Code, t11e Application was refe~~ed to the City o£ Elie Rivet Planning Commission fog the purpose of la.olding a public hewing and mal~in.g a recommendation to tl~e Ells Ri~ref Cit~r Council on the Application; and ~IHEREAS, the Planning Commission held a public hea~•ing on the Application on June 9, ZOOS, at which tune ERL, ~IMI, Tilley and tl~ei~ consultants were pxovided as much trine as they 5;~Resolutioi~s~Resolut~an_Den~zin~A~plication~f~r~Comp_Plan_Ame~~d_aild_Rezotun~ 2.DQC desired to present the Application and all information and data they desired in support of the Application; and ~IHEREAS, the Planning Commission took testin~:ony from all members of the public wl~.o desired to speal~ at the June 9, 2009 public heating; and ~IHEREAS, the Planning Commission closed its public hea~.•ing on the Applicad.on on June 9, 2009, but continued its discussion of the Application to a special meeting on June 23, 2009; and ~;IHEREAS, ERL, ~IMZ and Tiller were provided the opportunit~r to submit additional testimony and written materials for the record prior to and at the Planning Commission's June 23, 2009 continued discussion of the Application; and ~1HEREAS, on June 23, 2009, t11e Ells Ri~rer Planning Commission adopted a resolution recommending to tlae Ells River City Council that tlae Application for a comprehensive plan amendment and rezoning of the SDA be denied; and WHEREAS, the Ells River City Council, on July 6, 2DD9, held a public hearing on the Application and considered the Planning Con~nission's recommendation; and ~1HEREAS, ERL, ~1M~, Tiller and all members of tl.~e public desiring to speal~ at the July 6, 2009 public hearing before the City Council were provided the opportunity to do so; and ~JHEREAS, all written materials submitted by ERL, ~IMI, Tiller, and all other members of the public prior to and at the public hearing on July 6, 2009 were accepted into the record; and ~1'HEREAS, during the July ~, 2009 public 1learing, the Cit~r Council discussed the merits of the Application, directed that staff prepare alternative resolutions denying and approving the Application, and continued the public laearii~g to its regular meeting of August ~ 7, 2009, i.n order to provide ERL, ~IN~~, and Tiller the opportunity to present additional materials to address issues raised in the staff reports, during the public hearing, and by the City Council during their discussion; and S;~Resol~tions~Resohit~~i1 Dei1~Ti3~~~pplic~tion_for,~Camp~i'lai~ Amend,~a~1d~,~tezaiung 2,DOC ~iIHEREAS, on August 17, 2009, the Ells River City Council continued with tl~.e public hewing on the Application and provided ERL, w'M7 and Tiller, as well as all members of the public desiring to do so, the opportunity to present additional testimony and written evidence to the City Council; and ~IHEREAS, after all parties denting to present testimony and offer evidence fof of against tl.~e Application laad had the opportunity to do so, the Ells Rives City Council closed t1.~e public hewing on the Application and continued its discussion of the Application; and ~IHEREAS, by letter dated July 15, 2009, and at the August 17, 2009 City Council healing, ERL requested an opportunity to present additional materials and a revised plan to the City Council in a wo~•kslaop session; and WHEREAS, at the close of its session on August 17, 2009, the Ells River City Council directed: ® That any additional mate~•ials be submitted so that a staff repoxt could be distributed to the Cite Council on September S, 2009; ® That the Application be placed on tlae City Council's regular woil~sllop agenda for September 14, 2009; ® That the September 14, 2009 workshop session regarding tl~.e landfill be a joint meeting with the City of Ells Rives Planning Commission; and That the Application be scheduled for another public healing at the Cit~T Council's Legularly scheduled meeting of September 2i, 2009; and ~1HEREAS, representatives of ERL and City Staff met on August 25, 2009 and September 8, 2009 to review additional materials sub~l~itted by ERL regarding tlae Application, including a revised plan for the landfill expansion, a report entitled "~s Landfill Expansion a Good ~n~rest1ne11t for Ells River" the "~oith Report"~ and a letter dated September ~, 2009 revised Septembe~• 8, S:~RcSOlutions~ReSOllt~)11_D~1~~rit~~Applicatio~l_fot_Comp~PIan_Amend~and l~c~at~ing ?,L7QC 2009} outlining design modifications to the expansion proposal, the end use plan for the landfill, and other issues; and ~JHEREAS, City Staff and City consultants reviewed the revised plans, the Voith Report, the September S, 2009 letter and all other materials submitted by ERL, and prepared a staff report which was deli~rered to the City Council and Punning Commission, along with all of the materials submitted by ERL, on September S, 2009; and ~IHEREAS, the City Council and Planning Commission met in point worl~shop session on September i 4, 2009 to discuss the materials submitted by ERL, including the revisions to the expansion proposal for the Landf~]l; and WHEREAS, ERL was provided an opportunity to present its reprised plans and proposed design modifications for the expansion to the City Council and the Planning Coinn~ission at the September 14, 2009 worl~shop session and the City Council had the opport~xnity to discuss and asl~ questions regarding the revised proposal; and ~IHEREAS, on September 21, 2009 the Ells Ri~rer City Council held a public hearing on the Application and provided ERL, wMI and Tiller, as well as all members of the public desiring to do so, the opportunity to present additional testimony and comment on the Application, as revised, and to submit additional written evidence; and WHEREAS, after all parties desh.~ing to present testimony and offer evidence for or against tl~e Application had had the opportunity to do so, the Ells River City Council. closed the public hearing on the Application, continued its discussion of the Application, and reached tlae decision incorporated in this resolution; and WHEREAS, ERL has agreed in writing to an extension of the City's tune deadline for acting on the application under Minnesota Statutes, Section 15.99 to September 2C, 2009. S,~Resolutiai~s~Resolur~in~Dei~~rii~~,llpplica~i~n~,for~Comp,~Pla~1,~~nend_1nd_Rezoi~iiag 2,DOC NOw, THEREFaR.E, the City Council of the City of Ells River males ~.Ze following Findings of Fact and Decision with respect to the Application of ERL, wMI, and Tiller for a comprehensive plan ainendinent and rezoning of the SDA to allow expansion of the Landfill: FINDINGS QF F.ACT ~, The Landfill was first approved to operate on 40 acres of land ~n 1971 and first permitted by the Minnesota Pollution Control Agency in 1972, 2. The Landfill was granted its first approvals and permits by the City of Ells River pursuant to the City's Solid Taste Facilities Ordinance ~ 1988. 3, In 1997, the City granted approval for the Landfill to expand the area approved for Mixed Solid waste ~MSw~ disposal from its original 4~ ages to the current 93-acre footprint. 4, In 19$$, the Landfill received approval from Livonia Township to expand the area approved for constt•uction and demolition debris disposal ~C & D~ to a total permitted footprint of 75 ages. 5. The Mixed Solid Taste and Construction and Demolition Debris operations at tlxe Landfill therefore currently covet 1 G$ acres, ~. The Application originally proposed the development of additional MSw disposal space on $.G acres on the southern most portions of existing Landfill property and on G0.2 acres of the SDA, an increase in tl~e MSw disposal area within the Landfill from the existi~lg 93 acres to a total of 1 G2 acres, or an expansion of approximately 75 percent. 7. As reprised, the Application proposes an increase in the MSw disposal area witl~.a. the Landfill of 49.3 acres, an expansion of over 50%, $, Total MSw and C & D disposal areas at t11e Landfjll would be approx~.nately 217 acres if the Application is approved. S;~Resoluts'o~as~Resolut~~n_Denyii~~Ap~licatioi~_fir_Comp_Plan_Amend_ai~d_Rezoning 2.DOC 9, The proposed expansion of the Landfill would extend the life of the Landfill. beyond its current expected closing date. The Application as revised proposes that tl~e Landfill would close no later t11an 2029 if the Application is approved. 10. The City of Ells River leas been p~:oactively planning for its future and regulating solid waste facilities since the 19$0's, The City adopted its Solid waste Facilities ordinance i.n 19$6, and the Landfill was rezoned to the Solid haste Facilities Overlay Zoning Distt~ict in 19$S. 11. The Cit~T adopted its fast growth management plan in 19$8 and its fast comprehensive plan in 1995. The City's current comprehensive plan the Comprehensive Plan} was adopted on August 1 G, 2004. 12, The 2004 Comprehensive Plan consists of 13 elements, including the Land Use Element. The Land Use Plan incorporated in the Land Use Element of the Comprehensive Plan designates the current Landfill as "Landfill" and the proposed expansion area the SD.A} as "Ntining". The designation of the SDA as Mining has not been changed since adoption of the Comprehensive Plan in 2004, 13. Clanging the designation of the SDI from Mining to Landfill on the Land Use Map requires the approval and adoption of an amendment to the Comprela.ensive Plan by the City Council, as provided by Minnesota Statutes. 14. The Comprehensive Plan states that it should not be amended capriciously and that the following questions should be considered when changes to the Comprehensive Plan are proposed; ® is the project consistent with the Land Use Plan? ~ Does the project move Ells River towards its vision for the funire? ® is tl~.e project consistent with the policies contained the Comprehensive Plan? S:1R~SQ1L1~1011S1RCSpI[l~{?11,TI~Cil~111~~1)~]1C~~lOll_~01'_Cfl171~_P~tli7_At)1~1"iCl_at1CI_R~~017511~ ~,DQC 15. Policies set forth in the Comprehensive Plan which are relevant to tl~.e Application include; ® Provide a balanced land use pattern which supports a sustainable mix of jobs and hauling. ~ GL~.de the scale of development to be consistent with. the surrounding land uses and general character. ® Guide co~x~.nercial land use to areas that can utilize an appropriately~designed transportation system without infringing upon residential neighborhoods. Allow coir~.nercial areas to develop w11en they can be designed to be compatible with surrounding land uses. Include adequate buffering of commercial and industrial developments and adjacent to non-compatible land uses. ~ Requite adequate transition of buffets between differing, non-compatible land uses, rnal~ing use of natural land characteristics, whenever possible. ® Requite development of proposals to consider the impacts on transportation and natural systems beyond the boundaries of the individual projects. 1 ~. Throughout the Comprehensive Plan there is an emphasis on attracting commercial industrial development. This is important to the City as this type of developt~.ent builds a community's tax base and creates mare job opportunities. 17. Another fundamental element mentioned throughout the Comprehensive Plan is the need to establish and maintain a positive community image by maintaining tla.e edges and buffers that define and protect adjacent land uses. 1 S. Preservation of open spaces is also an important policy and goal of the Comprehensive Plan. 19. The Comprehensive Plan p~.•ovides that the gravel mii~lg area of the City, which is located clang both sides of North Highway 1 G9 and inclL~des tlae SDA, be guided for future development of co~~ametcial and industrial uses. This area of tlae City is envisioned by the City Council as tlae future economic engi~~e of the City. The goal is to have tlti.s area develop with com~.nercial anal .industrial uses as t11e gravel is mined out. The tax base generated by cotllmercial S:11ZC50I11~1011S1R~SD~L1t~~n~Den~rin~Ap~licaraon~foi~,Camp_I'lan ~ncnd,~and~Rezo~ui~g 2.DOC and ~ndust~ial development in this area is intended to support tl~.e f~.ancial viability of residential development th~ougl~out the City by naal~.ing it possible to maintain municipal se~.~vices without increasing taxes, altl~.ough this is very long fange planning, and these are not yet timetables foi extending public utilities into tl~.s a.tea to se~~ve those future uses, this is the vision of the Cotnpiehensive Plan and the City Council foi this area of tl.~e City. The SDA is also located adjacent to the future Highway 1~9/22~5~ Avenue ~ntefchange, wllicl~ has great potential foi future co~~nefcial/industfial development. 20. The 2004 Comprehensive Plan was pfepa~ed witl.~. the assistance of tl~.e planning fpm of Hoisington l~oeglei G~~oup, lnc, ~HZ~Gi}. Zn anticipation of tl~e proposed expansion of the Landfilll t1.ae City ~:etained HKGi to tale a closet loop at the potential impacts of an expansion of t11e Landfill on the gfavel ~x~ning area of t11e City. HI~Gi's xepo~t, the No~tl1 Highway 1 G9 Land Use Study, dated No~rembet• 10, 2008, identified a number of potential impacts related to an expansion of the Landfill and suggested land use, t~~anspo~tation and aesthetic strategies fo.~ addressing these impacts. Z1. Following receipt of the application to expand the Landfill, the City retained HI~Gi to tale a closer loop at the immediate area which would be potentially impacted by a Landf~l expansion and to anal~Tze the potential financial and fiscal impacts on the City of an expansion of the Landfill., HKGi's ~epoft on these issues is dated June 2, 2009, was subsequently updated on June 15, 2009, and was updated again on September 8, 2009, followi~.~g submission by ERL of its revised plan foi expansion of the Landfill. The HKGi November 10, 2008, June 6, 2009, June 15, 2009 and September S, 2009 ~epo~ts aye hereafter collecti~rel~r ~efe~~ed to as the "HI~Gi ~epoits".} 2Z. The HKGi deports project potential significant ~.~.npacts of Landfill expansion on econotllic development in tl~s area of t11e City and on future tax revenues generated from the SDA and the surrounding area. S:1~Z~SO~U~1Q11S1RGSpILI~.~~i>~De~1~~in~Applicatioia_~ni~_Comp_P1an~Amend~,and~Rezoniil~ 2,DOC 23, ERL, ~INrI, Tiller and them consultants have strongly contested the methodology and findings of floe HI~.Gi reports, and the City Council has listened to and carefully considered tla.e evidence and testimony presented by the applicants and their consultants. The City Council also recognizes the inherent difficulty in attempting to project the potential impacts of a current land use on future development which nay or may not occur decades from now. 24. However, it is the conclusion of the City Council that an expansion of the Landfill will inevitably l~.ave a long term negative impact on economic development within and tax revenue ~~ generated by at least a portion of the North Highway 10 rea of the Cite, ~ particular the SDA and the area immediately surrounding the SDA. Given the importance of this area to tlae future of the City, the City Council cannot ignore these .impacts. 25, The City Council has also considered potential impacts of tl~e Landfill expansion on the Econot~.~ic Development Strategic Plan prepared by the Ells River Economic Development authority and the Ells River Housing and Redevelopment Authority. Expansion of the Landfill could have a negative impact on the followh.~g goals in float plan: To diversify the commercial/industrial tax base of the City to strive for higher quality developments including professional se~~vices, corporate campuses, energy related and technology businesses; To preser~re high priority commercial areas for development; To identify and project a higher image and vision for tl~e City that enables the Cit~r to successfully recr~ut and retain t11e desired commercial/industrial development identified above. 2~. Tlae City Council ffnds that an additional expansion of the Landfill, beyond that appro~Ted in 1997 by the Cit~T and in 1998 by Livo~~ia Township, fs not consistent with file City's policies and goals as reflected in the City's Comprehensive Plan and the worl~ of its Economic 5:1R~50111C10115~Resalu~m_Denpin~tlpplica~io~~_fac_Comp_Plan_Amend~~nd~Rezaiung ?.DOC Development Authority, Housing and Redevelopment Authorit~r, Planning Commission and City Council. 27. The City Council finds that image is a huge driver in encouraging development ~ the communit~~, that laving the Landfill located at the northern entrance to the City ad~Tersel~l i~.npacts tl~e linage the City wishes to portray to visitors, residents and potential new businesses, and that expanding the Landfill and extending its life span will significantly increase these negative ~npacts. 28. The City Council further finds that expansion of the Landfill will prevent future development, at a ~Z~ini~nu~n, in that portion of the SDA which will be filled with Mixed Solid waste, and could discourage the type of high quality comnaercial~industrial development which the City is seeldng for the important area of the Ci~T immediately surrounding the SDA, inchuding the critical area mound the future interchange at Highway 1 G9 aid 2215 Avenue. 29, The City Council .recognizes that there are some positive economic impacts related to the Landfill, including the host fees which tla.e City collects from the Landfill and tl~.e business wluch ER.L does with. local residents and businesses. However, these are short term economic benefits which will end once tla.e Landfill closes. At that point, the portion of the SDA filled with MSw will generate virtually no revenue to the City, and tax revenues generated from the immediate surrounding area will be negatively impacted to some degree. 30, The City Council finds that the Landfill also has noi~~econoinic negative impacts on the City and on surrounding residential uses while it is open, including litter on Highway 1 G9 and other public sheets from trucl~s mooring to and froth the Landfill, the trucl~ traffic itself, load maintenance impacts, noise and odor. Although ERL and wMI IZa~re been excellent corporate citizens and have made every effort to mitigate these impacts, the~T are not capable o£ being fully mitigated until tl~e Landf~l. is closed. Expanding the size and extending the life of the Landfill will prolong the period of t~i.~ne that the Cit~r and surrounding residents must endure these impacts. S,~Resolutions~ResolL~ia~~,Denying~~l~~licatia~i_for_Comp_Pl~~a_Ame~~d_anc~_Reza~ung 2,DOC 31. The City Council is also concerned about the potential environmental impacts related to tl~e operation of an expanded landfill over the next 2D gears and the potential environmental impacts (elated to a significantly expanded landfill footprint fallowing closure of tlae landfill, The City Council recognizes that tl~e Minnesota Pollution Control .Agency has completed an En~rironmental ~~npact Statement on the proposed expansion of the Landfiill, but notes that there ale environmental impacts and risl~s inherent in this land use which cannot be mitigated other than by limiting the expansion of the Landfill. 32. The City Council has reviewed and carefully considered, along with all other materials submitted by ~RL, the Voith Report. As set forth above, the Council recognizes the potential for soiree positive economic ii~npacts related to the Landfill, However, the council f~a.ds that. ~ The Voith Report overstates the potential positive economic impacts of the Landfill, for the reasons set forth in the September $, 2009 Memorandum from the City Admiiv.strator, which are itlcorporated in these Findings of Fact; ~ The potential fat positive economic impacts is only one of many criteria and considerations to be weighed in ~nal~ing a decision to amend the Cit~T's Comprehensive Plan; and ® The City Council does not agree that a present value economic analysis of any proposed use should be a determining factor in ~nal~ing a land use decision. 33. The City Council has considered and appreciates the efforts of ~RL to ~~.tigate the negative impacts of a landfill expansion, particularly on the .~nportant Highway ~~9~221~t Avenue interchange, by reducing the size of the proposed expansio~a in the reprised proposal and by mal~.ng an additional ZO acres of land available for potential development at the interchange, However, the S.1R~501L1~101151R~50~l~ic~11_Den}7in~A~~licatioil_Fa~_Comp_I'Ian~Alnel~d_a~~d_Rezolling 2.DOC Council finds that the Plan revisions do not outweigh the negative impacts of the proposed expansion, or change the Findings of Fact set forth in this Resolution, 34. ~t is t11e City Council's conclusion, from all of the evidence submitted and the testhnony tal~en, that; ~~} An expansion of the Landfill will. prolong the negative short term impacts of t11e Landfall. on the City and will inevitably have a long term negati~re impact on the tax base generated from this area of the City; ~2} This area of the City is planned to generate the tax base that will support tl~.e financial viability of the balance of the City indefinitely; ~3} Given the importance of this area to tl.1e future of the City, the potential benefits of a Landfill expansion are outweighed by t11e negative econon~.c, environmental and land use impacts of an expansion; and ~4} An amendment o£ the Land Use Map Element of the City's Comprehensive Plan to expand the area of the City designated for Landfill into the SDA is inconsistent with the policies and goals of the City's Comprehensive Plan and would n.ot be in. the best interest of the City, its residents and its taxpayers. DEC~S~~N GN LAND USE AMENDII~ENT THEREFORE, the City Council of tl~.e City of Ells River makes tl.~e following Decision with respect to the Application to amend the Comprehensive Plan of the City of Ells River to redesignate the SDA from Mining to Landfill; A. All of the reports and materials prepared by City Staff and City Consultants, as well as the Findings of Fact and Recitals set forth in this Resolution, are hereby adopted and incorporated within the City Council's Decision on this matter. S.~R~solLt~ians1lZesalL~11~(1~Den}lin~App~ica~ion~far~.Com~_Plan_t~mend_and_Rezo~ur~g 2.DOC B. The record in this matter sl~.all include all materials submitted to the City and presented to the Planning Comt~nission and City Council, including those materials p~•esented in the staff reports, by the City staff and by the City's consultants, and all materials and testimony submitted by or• on behalf of ERL, WMI, Tiller and their consultants, and all testimony received from the public, as of the date of this Resolution. C. The Application of ERL to amend the Land Use Map dement of the Cite of Ells River 2oQ4 Comprehensive Plan to redesignate the 1 o9-acre Southern Development Axea from the Land Use category "Mining" to the Land Use category "Landfill" is hereby denied. DECISION ~N REZONING The City Council of the City of Ells River further tnal~es the following Decision with respect to the Application of ERL fox rezoning of the 1 o9~acre Sautllern Development Area from .~-1 MME}, agricultural conservation ~mitaexal excavation}, to A~i SwF}, agricultural conservation solid waste facility}: A. All of the reports and materials prepared by City Staff and City Consultants, as well as the Findings of Fact and Recitals set forth in this Resolution, are hereby adopted and incorporated within the Cit~T Council's decision on this matter B, The record in this matter shall include all materials submitted to the Cit~r and presented to t11e Planning Commission and City Council, including tla.ose ~~aaterials presented in the staff reports, by the City staff and by the City's consultants, and all materials and testimony submitted by or on behalf of I~RL, ~1MI, Tiller and their consultants, and all testimony received from the public as of the date of tl~.s resolution. C. Based on all of the above, and on the additional fact that the Application to reguide the SDA from "Mining" to "Landfill" has been denied, so that rezoning tl~e SDA fio~n A~I S.1R~SOIL1C1011S~Resolt~i~~l~Denying_,_Applica~ion_for_Comp_P1a31_~me~1d_at~d_Re~o~a~t~g 2.DOC (ME) to A-1 (SWF) would result in an inconsistency between the Land Use Map Element of the City's 2004 Cotnpiehe~sive PIa~ aid the City of Ells River's Zo~~g Map, the Application to rezone the SDA from A-1 (ME) to A-1 (SWI~ is denied. THIS RES~LUTIaN PASSED AND ADAPTED this 2lst day of Septemhe~, 2009, Stephanie I~izi~g, Mayo Ti~aa Allaid, City Cle~1~ S:~Resolu~ions~Resol~t~i~i1_Den~~i31~Ap~lication_~o~_Camp_l'laiz Amend~and_Rezoiung 2.DOC .~ „~. ~~ ~- Zehringer Consulting ~ ~92D Concord St Nw Elk River, MN 5 5 3 3 D Sept 21, 2DD9 To: Elk River City Council Subject: Elk River Landfill Expansion Elk River was named Energy City in 1.996 by the Minnesota Environmental Initiative ~MEI~. we were officially designated Energy City by the State of. Minnesota in. 2D06 and received both a State and Federal trademark for same, so no other City can use this designation. Being Minnesota's only Energy City is good! It's good to have a designated location within the State to demonstrate leading edge alternative energy and energy efficiency technologies. It's also good for notoriety and business! we have 2~ demonstration sites featuring 24 different technologies in our portfolio, Perhaps the best known and most frequently toured demonstration site is our Environmental Learning Center and adjoining Landfill Gas Electric Generating Plant. In the past, that facility has been toured by Scout groups, 4~H groups, home schooled classes, grade school and high school classes, groups from many electric coops, U of M engineering classes, St Thomas engineering and continuing education classes, and a host of foreign visitors. As example, a group from l ~ European countries will be touring the LFCr Electric Plant and learning more about what Energy City is all about this Friday, Sept 25. Another group from Central and South America did likewise in June, Both groups came to us through the Minnesota International Center and we are now on their list of things to do when foreign dignitaries visit Minnesota. I know there are many other tours conducted by Elk River Landfill staff as well. Elk River Municipal Utilities owns the Landfill Gas Electric Generating Plant and it generates 12% of Elk R.iver's electrical needs. If the landfill expands and another six enginelgenerators are added to this expansion, we will generate 3D% of our electrical needs from landfill gas -and this is a 3 5 year plus source. Electricity generated by landfill gas is recognized as "green power" and is a valuable asset for any utility to own. This asset is operated and maintained by Elk River Landfill personnel. In summary, please consider the advantages our landfill brings to the community when making your decision. I know first hand that it's a facility that is well managed and efficient. It also provides a resource that would otherwise be wasted. Allowing the expansion of the Elk River Landfill will not only guarantee continued employment for 2D plus families, but will put us in the "drivers seat" when our municipal electric utility looks for a new wholesale power supplier. Sincerely, s 4 Ii "l 4• ~ a~)yll~. /r//~'y13/(l_~ y,~f~ ~ ~V I.J f/, i f) .? a `• :T~`' f 'M '~~ ps' 1/u'+ Vance Zehringer pi~ e ~~ ~ ~~ d ~ ~M ~ a~ x~ ... w~ o~ ~~ ~~ .~ O O N N L ~--' VJ ~~ t .,- _ ~' r 3 1 ~ - ~ ~ . v r ~ _~ .~~ _~. ~~ ~ r ~ ~ ~_.~ + M1 -_ r.. ~: - - - ~~~ ~ + ~~~ ~, i 0~ L L ~ I t~ . - - _ 4 'Y11' u s ~___ _, s ~~i.in~E~~~l i~, gip' ~ ti ~.. , ~ ~ ~, ~~~ ~ ~ ~` °~ t. ~;j~ r ~ ~~ Y ~ ~ Yu' 9- i ~ _ ~t ~ ~ ~. ~ gel'~~.I~IINII~~B~~~,~~9~~I~IIj~~I~~~~I~p •'1-P ~~r~~ r ~ ~~{ ~ tom" 1 BIII Is I ` I ~ ~,,I r ~ ~ ~f ~ ~ -~ ~ I~~~;j. 11 ~~~ Nllf~l~~l~f~l~lllf~~~l' 1 or e~ ; L`~~ -~~~ A{' ~`~~' ~, ' ( ~ ~r ~_ _ ,~~~ ~~s - L ~~f ~.. ' ~ x/14 ~ ~"~'~" ` ,. _ ~ ~- ~ _ 'd (I~(I~IN~Qwll7ll 11 ,~IIIII~IIII: g' r ~ - -~ ~~)i~~~Eii~~aj~~MI~I~III~~h~,,~~~~~IIN[II ~ ~ . _ ~ ~.< 1, f ~ ~ ~: F 6 ~_ - ° _ _ -_ u. , ~- ~ s~ -_ _~_ _ ~ _ h - - J l , :- _ ~ ,.., __ ~y} , ... .... ~ ~. 'k w ~. ~~8~ mpg.' ~ ~ lh~ ~ #~ ~ti y k" ~ },, ~ 'f I ~lll ~ +k .r' '~f ~ x f ~7 ~ a.~ ~~ ?3'"•1 ~~ ~,~4~y~~ ~~ v ~°r. __ } ~'~~ °~ ' ~~V~ii ~~ sue' # I~ ~ ~ 51 ;. ..,~. ._ ~, e~.,e. -_.~,~ _ ~.. _.a _ v. e ~ . m+ ~ _ ~ L - - d` ~ 14 ,ems ~ 4 _-~ -~~„'~ ~~~''s ~~ ~~ I ~ ~ - _ ` Jf1Tll I ==` ~ ~ . ~~ '~ ry'~v-sue .~k ~~r. ~ ; ~ Y1 ~ ~~i ~ ~.` ~ -- ~.~ _ ~~ ~ _ ~ _ 1'J ~ `~~,~ ~e~ ~ ~~~~ J 'ti ~~ ! ~ ' O •M BFI r ~~ ~~ I ~ ~~ •M BFI a •M O •M r~~ u • J y r~~ DUI rT ~~ •~1 1~1 1~1 •M ~~ ~1 v a a--~ U O N LL a--~ N O 2 C O O O O O O 00 6F} a--~ O U 0 L.L C O O O O O O M W v O O ~w ., ~_. y a W (n ~ ~, 0 0 U ~~ ~ 0 c~ N N L U ~_ U ~., c 0 a ~ ~ CO O ca m O ~ ~ ~A A N O 1~1 ~, a L W - J .~_ s ~: -~ v,~ v c a~ v as c c ca J L L N C O ,. s ~~ o' ~ ~~~ _ ~~ ~ ~~~ Y 1 i e a a ~ ~` - ~I ~1 N y C .N 3 nV• W .~ ^~ ~.L O U W ~+ n~ W ^ - V/ U O t~ 0 N N z ~ L ~ ~ ~ •~ W ~ ~ ~ V• O Q '~ N W~ L V VJ ON O~ L ~ ~ > ~' a 0~ nV /' W ^~ O U ~_ Q W \~ nV• W .~ V• ._ ~--+ W W W O t~ O t~ •~\ V• •~ nV• W V• ~_ ~~ rn~~ V V / V nV /, W ^~ O U O_ ~+ U O U i Q Q TWO yVV ~~~ D ~ ~ ~ ~a ~~ ~_ w ~~Q ~$ .~ `s ~~ w J, ~:.. 1 '~° _~ III I'~ ~• m~ y~~ * d fi ~ ~` J 0 ~ ~ ~ ~ e ~ W~ 4 •py .~ h~ ~••r W \I`L1 ~6 1 ~~ ~ a ~a°~~.~~~. dr.= ¢;e. `, . . `,~ . ,s .,# , ::~'' 1 ~F j`V i ~ ~~'~ ~o ~~ ~~,~' y~ w ~I d~ . ~r'' 4 ~. :~ ~~ ~~ .x a a~ as c~ .. a H ~, av _~ E E v ~ ~ a y .~ Q J N ~ ~ L • . ~ ~ L .U ~ L ~ ~ N ~ ~ ~ . ~ ~ ~ V ~ O ~ ~ ~ ~ °' s ~ ~ U ~ ~ Q ~ ~ O o ~ .. ~ N ~ - ~ ~ ~ ~ .. ~ ~ ~ ~ ~ W ~ ~ V ~ O N ~ ~' s ~ v }, ~ ~ ~ ~ a~ ~ ~ a~ ~ L ^~ ~ ~ ~ ~ ~ ~ v s ~~ ~ N - .. .- ~, ~ ~ v ~ o ~ ~ .~ ~ ca a~ ~ J ~ O y~ u ~~ m ~_ 1 -. ~ ~ ~ ~, ,~ w~,~ ~~ ~~ p _ .. `~ p a ,~. ;v ~r `b ~ -' ~ _ i ~V ~~a~ ~~, ~~ ~~ p, _ ~ ~ ~ ~~ ~V , m ca L ~ N 3 W ~ y N ~, a N .y as o ~~ ~ ~ ~Q .~ L V L L T O V, L T ^~ ~~ L J ~ G~ ~ t +~ ~ ~ ~ O ~ L +.. ~ ~ L ~ V c a~ d ~ ~ R ~ a~ E •N Q '-' >, O a~ ~ d m C ~ ~ d ~ N O .~ ~ O w' w' C ~C 7 t C `~ ~ L L 3 ~ ~ ~ ~ Q7 ~ y ~ ~ O +~ L 3 J E n~ W U O ~ ~ ~ ~ ~~ U ~ ~ ~ (~ ~ ~~ ~ ~ ~ O .~ U ~ O ~- W Q U ~ ~ - O .~ ~ ~ ~ ~ _ ~ ~~ ~~ ~ o x~ a~ ~ ~ ~ ~~ ~ ~ ~ .- ~ ~ Z ~ O ~W//~~ V• V• .~ a~ a~ a~ U O J .-. \W ./ U .~ U 0 a~ O Y 0 I~ a~ ~~ a~ 0 E D Q c 0 E E 0 1 +~ a~ W i v ~, v „• a=i i o ~ ~ v o o ~ o , ~- a ~ ~ a~ t v a~ a~ c a~ 0 t ~~ co i a~ O d a a~ a~ c as 'i v c ~_ ~• L a w v a 0 4 a~ i O d _~~~ ~' M ~E 1 _ ~ ~ N~ d~y ~~~ Y' ~ ~ eft ~ ~1 A. y -- - ~~ `. ,_~'~•~ a I ~~ - ~ ~ G ` as ° . ~ .. ~ .. ~. ~ ~„~ ~ Y I `i ~ ~ v~'F~ ~4 t ~ ~ f ~ , ~-~ I ~ ~~. ~ i4 ~ l , ~ i ~`~ ~~ ~ ~" +~ a `~ u ~` - u N ~ i~ ~'''.:_ ~ ~ ~ ~~ ' 5~ ~ ~ ~. ~,, ~: ~ ~ ~ ~ .~ rv' ~ ~~ ~~ ,, ""• It ~ v Q ~ ~ c y ~ o v N ~ N r \' Q ~ j y ~~ ~ N ` :--~ ~ ~ ~ ` ~ ~ Q ~ L ~ ~ ~ y L y ~ ~ Q~ 0 ~ o ~ ~ ~ ~ ~ ~ 0 ~ • . N ~ ~ ~ ~ ca as s a o a ~~ ~u 'e ~~ ~ i F ~{/ C ~ ~ }~ ~ ~ y ~~ ~ v ~ Z = ~ ~ ~ p [•~ U ~ cn i w ~ C C >, ~ L L ~ ~ ~ ~ ~ W ~ ~ ~ V C II ~ !~ ~~ ~ Q ~ J U ~ V ~ ~ ~ N p C6 , ~ ~ ~ ~ ~ O ~ ~ L N ~ ~ ~ = p ~ ~ ~ Q ~ ~ ~ ~ c~ U C~ O `