Loading...
5.3. SR 09-21-2009'1-1 ~j Elk REQUEST FOR ACTION River To Item Number Ci Council 5.3. Agenda Section Meeting Date Prepared by Communi Develo ment Se tember 21, 2009 erem Barnhart, Plannin Mana er Item Description Reviewed by Request by Duffy Development for Site Plan Review Approval of a 53-unit Apartment and Conditional Use Permit Approval to Reviewed by Amend the Planned Unit Development Agreement, All in Lot 1, Block 1 of Elk River Station 3`d Addition -Case No. SP 09-03 and CU 09-20 -Public Hearin Action Requested Staff and the Planning Commission recommend approval of the following: A. Amend the Planned Unit Development agreement allowing 53 units and parking at a ratio of 2.34 spaces per unit. B. Approval of the Site Plan as illustrated on drawings dated 9-3-09 with the following conditions: 1. All comments of the city engineer's memos dated September 10, 2009 and March 10, 2008 shall be addressed. 2. All comments and conditions of the environmental technician memo dated March 4, 2008 shall be addressed. 3. The development shall meet all applicable fire codes. The fire chief shall verify the location of all fire hydrants and may require additional hydrants necessary to preserve the health and safety of the residents. 4. A NPDES permit is required prior to final approval of construction drawings. 5. A letter of credit in the amount of 100% of the cost of the improvements, landscape, and trail installation shall be submitted at the time of building permit application per section 30-604(b). 6. No building permit may be issued until the plat is recorded. 7. Landscaping plan be amended to incorporate native plantings along the wetland and a rain garden to management storm water run off prior to entering the wetland. The Planning Commission also added the following condition: 8. Parking lot screening be added to protect the townhome buildings on the east side of the lot. Summary John Duffy is proposing a 53-unit apartment building on a lot designed fora 60-unit apartment building. The building as proposed is four stories with underground parking. This building is largely consistent S:\PI,ANNING MAIN\Case Files\CUP\CU 09-20 Depot ER Station-Duffy\Staff report to CC 9-21-09.doc with the approved Planned Unit Development approved March 17, 2003, although the building has seven fewer units and there is less parking than normally required. Planning Commission Discussion/Public Comment There was significant public comment at the public hearing September 15. Representatives of Pullman Place and the Woods at Elk River Station spoke on several issues, many of which were shared by the Planning Commission. Public Hearing. Many residents were upset that they weren't allowed to comment on the previous site plan submittal prepared by Roger Fink last year. Further review indicates that a public hearing was not scheduled or held at that time, although required by the Planned Unit Development agreement. To staff's knowledge this is the only subdivision that requires this level of review for permitted uses, and unfortunately that requirement was missed. Staff has sent a letter of apology to the two associations. Parking lot screening. Concerns were voiced about lights from vehicles shining into adjacent living rooms, etc. The Planning Commission recommended that screening be provided in the SE corner of apartment site to protect against this light intrusion. Young professionals. Residents felt they were promised that the apartment would be occupied by young professionals by the original developer and real estate agents. To date, staff has found no evidence of that being a promise presented to the City Council. Additionally, residents voiced concerns that the apartments may have more adults per apartment than originally anticipated. Amount of parking. Residents felt that parking is inadequate; they are concerned with parking on public streets and spilling into their guest spaces. The original plat indicated 135 spaces for 60 units, a ratio of 2.25 spaces per unit. With proof of parking proposed, the applicant provides 2.34 spaces per unit. Without proof of parking, the applicant improves 2.02 spaces per unit or 107 spaces. Tot lot. Residents voiced concern that the apartment residents would use their private park as they grew too old for the apartment provided tot lot. It was noted that the Park Commission and City Council required a cash donation as part of the plat. The development plan does not show a park in the property. Pets. Residents were concerned that apartment residents would own dogs and not pick up after them, at great expense to the townhome association. Mr. Duffy noted that there would beano pets policy. Access on private streets/ sidewalks. Residents were concerned that apartment residents would cut through their private streets to get to the full intersection at 1715`. A concern was also raised that apartment residents would use association sidewalks, which the association pays to maintain. It was noted that some cut through traffic is unavoidable. Storm water pond "bounces". Residents raised a concern that with increased development, their storm water pond in the center of the development `bounces' during periods of heavy rain. This bounce erodes the sides of the basin creating a maintenance issue for the association. It was pointed out that the pond functions as it is designed. It is intended to fluctuate during these events before discharging to the wetland complex beyond. This bounce will likely get more pronounced as development continues and is unavoidable. S:\PLANNING MAIN\Case Files\CUP\CU 09-20 Depot ER Station-Duffy\Staff report to CC 9-21-09.doc Traffic. Residents voiced displeasure on the level of traffic on Twin Lakes Road and the added traffic this project will bring. Many residents requested a full intersection at Twin Lakes and 172"d adjacent to the project. Staff response was that the City has heard a number of concerns relative to traffic in this area and is reviewing the problem; however, the solution is not likely to be additional median breaks on Twin Lakes. There are several concerns with this type of solution, including an additional intersection may decrease safety due to sight lines (for both this parcel, and future development on the west); Twin Lakes Road is expected to, at some level, be a major "spine" for this area of the community linking the residential and industrial areas with limited intersections on Highway 10. Storage of dirt. Residents were concerned with the previous developer's plan to store dirt and sand during the construction of the building with consent of the property owner. The applicant noted that he had no plans to do this. Attachments • Staff Report to Planning Commission dated September 15, 2009 • Amendment No. 1 Action Motion by Second by Vote Follow Up S:\PLANNING MAIN\Case Files\CUP\CU 09-20 Depot ER Station-Duffy\Staff report to CC 9-21-09.doc REQUEST FOR ACTION To Item Number Plannin Commission 5.2. Agenda Section Meeting Date Prepared by Planning Items Se tember 15, 2009 Jeremy Barnhart, Planning Mana er Item Description Reviewed by Request by DuffyDevelopmentfnr Site Plan Review Approval of a 53-unit Apartment Conditional Use Permit Approval to Reviewed by Amend the Planned Unit Development Agreement, all in Lot 1, Block 1 of Elk River Station 3rd Addition. Action Requested Staff supports a Planning Commission recommendation to amend the Planned Unit Development agreement, allowing 53 units, and parking at a ration of 2.32 spaces per unit. Staff recommends that the Planning Commission recommend approval of the Site Plan, as illustrated on drawings dated 9-3-09 with the following conditions: 1. All comments of the City Engineer's memos dated September 10, 2009 and March 10, 2008 shall be addressed. 2. All comments and conditions of the Environmental Technician memo dated March 4, 2008 shall be addressed. 3. The development shall meet all applicable fire codes. The Fire Chief shall verify the location of all fire hydrants, and may require additional hydrants necessary to preserve the health and safety of the residents. 4. A NPDES permit is required prior to final approval of construction drawings. 5. A letter of credit in the amount of 100% of the cost of the improvements, landscape, and trail installation shall be submitted at the time of building permit application. Per Section 30-604(b). 6. No building permit may be issued until the plat is recorded. 7. Landscaping plan be amended to incorporate native plantings along the wetland, and a rain garden to management storm water run off prior to entering the wetland. Background/Discussion C-n June 16, 2008, the City Council approved the platting of Outlot D, Elk River Station into a buildable lot: Lot 1, Block 1, Elk River Station 3rd addition. At that time, the Council also approved the site plan fora 60-unit, 4 storyapartment building. The original developer of the 60-unit apartment building has since abandoned the project. John Duffy, DuffyDevelopment, is now proposing a 53-unit affordable apartment building on the same site. The building exterior will be consistent with the original design and the design standards of the PUD agreement. Case File: SP 09-03, CU 09-20 Page 2 Attachments Elk River Station apartments Duffy Development • Location Map • Memos from City Engineer dated March 10, 2008 and September 10, 2009 • Memo from Environmental Technician dated March 4, 2008 • Applicant's Narrative • Site Plan • Civil Drawing • Architectural Drawing General Information Applicant Duffy Development Requested Action Site Plan Approval, Conditional Use Permit Approval Location and Size Approximately6 acres east of Twin Lakes Road north of 172nd. Overview In 2003, a Planned Unit Development (PUD) for Elk River Station was approved. The approval was for a mixed use project consisting of a 60-unit apartment building, a daycare center, a 70-unit senior housing building, five office/retail buildings, a convenience store and townhomes. The townhomes and senior living is built. Applicable Regulations The Elk River Station PUD requires site plan approval from both the Planning Commission and City Council. Because the PUD Agreement provides fora 60-unit building, an amendment is necessary to permit the construction of a different number. Analysis The design of the building includes a stepped down design at the ends of the buildings. The building will utilize a mix of exterior materials, including brick, maintenance-free siding, and maintenance-free shake siding. The building is also "bent" so it will not provide the appearance of an extremelylong facade. There is a wetland on the north side of the property. Usaitr There are 53 units proposed with a mix of 1, 2, and 3 bedroom units. There appears to be a large lobby, and gathering space on each floor. S:\PI,ANNING MAIN\Case Files\CUP\CU 09-20 Depot ERStation-Duffy\PC memo 9-15-09.doc Case File: SP 09-03, CU 09-ZO Page 3 Elk River Station apartments Duffy Development Pazking The PUD was approved with 135 parking spaces for the site including surface and underground stalls. The PUD required 60 stalls to be underground; each unit would have one underground stall. With the reduction of units from 60, the applicant is proposing 52 underground parking stalls. 54 surface stalls are proposed, excluding 17 proof of parking stalls. In all, there could be 123 parking stalls on site, at a ratio of 2.32 spaces per unit. This is less that the typical 2.5 spaces per unit required by standard ordinance. The reduction could be supported due to the projects location adjacent to the train station, and the likelihood that inhabitants would be using the train station for some of their transportation needs. Additionally, the reduction maybe supported because the inhabitants are likely young families, with two or less drivers per unit, reducing the parking demand. Natural Resources Trees -There are some mature trees on the site that will be saved with this development, staff has agreed that the saved trees maywork towards landscape credits per the landscape ordinance. Once the trees are identified staff will review and determine which trees can count as landscape trees per ordinance standards. Wetlands -There is a wetland on the north side of the site. The development is maintaining a 20 foot buffer. It is suggested that native plantings be planted near the wetland as recommended by staff. It is further suggested that the final landscaping plan include a rain garden to address some water treatment goals. Parks Park Plan -The Comprehensive Park Plan does indicate a trail corridor in this area. A trail is required along Twin Lakes Parkway. Park dedication will be satisfied by cash, in lieu of a land donation. Action Motion by Second by Vote Follow Up S:\PLANNING MAIN\Case Files\CUP\CU 09-20 Depot ERStation-Duffy\PC memo 9-15-09.doc Wd 6bZT Z 6002/T/6'6nnp~deW uoi;e~o~~na-uoi;e;S a3;oda4 OZ-60 fly\dfl~\sa~ld ase~~9NINN'dld\~S of ~~~ TT r~~ V ~l MEMORANDUM TO: FROM: DATE: SUBJECT: Jeremy Barnhart, Planning Manager Terry Maurer, Public Works Director ~'' September 10, 2009 Elk River Station 53-Unit Apartment Building File #226- 196P As requested, I have reviewed the drawings submitted for the proposed Elk River Station 53-unit apartment building to be located in the northeast quadrant of Twin Lakes Road and 172°d Avenue NW. The submittal contains a site plan, grading and storm sewer plan, landscaping plan, and utility plan. At this point in time, there is not a significant amount of detail shown on the plans; however, it appears from a site civil standpoint this proposal is very similar to the Depot at Elk River Station proposal that worked its way through the city in the early part of 2008. My suggestion would be that the site civil requirements be essentially the same for this new proposal as was approved for the previous proposal. To that end, I have attached a copy of my March 10, 2008 comments from the detailed plans submittal for the Depot at Elk River Station. It appears that many of these recommendations from the earlier proposal have already been incorporated into the current proposal. Once detailed plans are submitted, we will be looking for concurrence with all of the major issues identified for the site civil concerns of the original Depot at Elk River Station proposal. If you have any questions regarding this information, please contact me. S:\PLANNING NL~IN\Case Files\CUP\CU U9-20 Depot ER Station-Duffy\engrs comments.doc MEMORANDUM Sheila Cartney, Senior Planner Terry Maurer, Public Works Director The Depot at Elk River Station Fiie #226-19bP As request, we have reviewed the submittal package for The Depot at Elk River Station, which is the proposed 60-unit apartment complex in C-utlot D of Elk River Station. The submittal package consisted of a seven-sheet set of plans prepared by Westwood Professional Services dated February 22, 2008, including a storm drainage calculation with the same date. Based on our review, we would offer the following comments: The outlot will need to be replatted to create a buildable lot. Additional drainage and utility easement needs to be provided in the southwest corner where the existing sanitary sewer and watermain cuts the corner of the outlot. A 10-foot wide drainage and utility easement needs to be provided along the east property line. A drainage and utility easement needs to be provided over the proposed watermain up to and including the proposed hydrant, as these are deemed to be public lines so that the utilities can operate and maintain the hydrant. Grading Plan The majority of the parking lot slopes to the entrance to the underground parking. It appears that much of the drainage, especially in a large frequency storm, will end up at the door to the underground parking. Revisions to the grades and/or to the storm sewer plan need to be provided to protect against flooding of the underground parking. Consider periodic curb cuts to direct drainage from the east curb line to the side lot swale. Snowplowing in this area will need to be conducted in such a manner to keep these drainage swales open. • Drainage collects along the fire lane on the west side of the building and flows around to the retaining wall location. A spillway or pipe will be needed to convey this drainage to the bio retention pond. • Grades at the rear of the building are significantly lower than the patio/decks. No access to the ground at the rear of the building from these units will be possible. • The original wetland delineation report for this project needs to be resubmitted relative to the wetland boundary on this lot. Prior to any work being done on this lot, the wetland boundary originally delineated needs to be reestablished and verified by= the city's Environmental Division. • After grading and construction of the bio retention pond adjacent to the wetland on the north side of the lot, a 25-foot width measured from the wetland edge, needs to be planted in native plantings. Recommendations for planting materials can be obtained from the Soil and Water Conservation District. At the edge of the 25-foot planting, wetland buffer signs according to the city's ordinance need to be installed. • The construction sequencing needs to be done in a manner to protect the bio retention pond area from sediment washing into the area, as well as compaction from construction equipment. The area should be protected with fencing prior to construction and with silt fence immediately after construction. • The grading appears to involve a significant amount of export. Construction traffic on 172nd Avenue needs to be limited to that portion between Twin Lakes and the construction driveway. C. Utility Plan • The sanitary sewer service seems excessively deep. • A sampling manhole 48 inches in diameter needs to be placed on the sanitary sewer service. • Add an 8" gate valve to the water service line. • A review by the city's Fire Department has determined that the hydrant at the northeast corner of the building is not necessary and can be replaced with a hydrant located in the parking lot median immediately opposite the water service into the building. • How is the roof drainage routed? Are roof leaders connected directly to the storm sewer? • It appears that there are existing small utilities in the area of the proposed driveway which may cause conflicts with the drivewayand/or proposed storm sewer. D. Erosion and Sediment Control The site is large enough that it will require a NPDES permit. A copy of the permit once obtained, must be provided to the city. A Storm Water Pollution Prevention Plan (SWPPP) must be submitted and approved for the site. The SWPPP must be in an 8 1/2" x 11" format with a page for the signatures of the owner, engineer and contractor. No grading maybegin on the site until a signed SWPPP and a copy of the NPDES permit have been provided to the city, as well as an initial inspection of the perimeter erosion control measures and rock driveway construction has taken place and been approved. S:\PLANNiNG MAIN\Case Files\SP\SP 08-06 ER Station Apts\03-10-08 engis commerns.doc Page 2 E. Landscape Plan • Scotch pines along the east property line are shown to be planted in the drainage swale and will make maintaining the swale difficult. • The ash trees along 172nd Avenue and the maple trees along Twin Lakes Road are shown to be planted in the road right-of-way. These need to be moved to the lot. • The monument sign on Sheet A100 is located on top of the sanitary sewer service. The monument sign is not shown on the site plan. Is the monument sign proposed to be built? F. Miscellaneous • A 10-foot bituminous trail should be built along the Twin Lakes Road lot frontage in the Twin Lakes Road right-of-way, including a pedestrian ramp at 172nd Avenue. • Adjacent to the building where the fire lane is provided, this trail can be utilized as the fire lane bysimplywidening it to the required 20 feet and strengthening it to support the vehicle weight. This mayprovide a better option for the fire lane requirement by allowing additional green space adjacent to the west side of the building. • Eliminate the crosswalk paint at the driveway. • Record drawings of the final construction need to be provided to the city. In addition, GIS data on the constructed utilities including field surveyed locations of sanitary sewer, water and storm sewer (X, Y, Z) on county coordinate system also need to be provided. If you have any questions regarding these comments, please contact me. S:\I'LANNING MAIN\Case Files\SP\SP 08-06 ER Station Apts\03-10-08 engxs cotnments.doc Page 3 ver MEMORANDUM TO: Sheila Cartney, Senior Planner FROM: Nicola Blake-Bradley, Environmental Technician DATE: March 4, 2008 SUBJECT: Concerns regarding the Site Plan Review for: The Depot at Elk River Station Apartments SP08-Ob During re~riew of the plans for the item listed above (Depot Apartments), several items of concern were noted for the site. The following concerns were identified: • The City's Archaeological Model indicates a high potential for an archaeological site in both project areas. No known SHPO (State Historic Preservation Office) site is located on the property. Staff recommends that the standard condition listed below is placed upon the request: "Any item or condition found that indicates the site is likely to yield information important to prehistory or history shall be reported to the City immediately. Further, the City reserves the right to stop work authorized in its approval until the site is appropriately investigated and work is authorized to continue by the City." Due to the amount of grading and excavation that will occur on the site, an NPDES (National Pollutant Discharge Elimination System) permit will be necessary for this project with a SWPPP (Storm Water Pollution Prevention Plan). The NPDES permit may be obtained from the Minnesota Pollution Control Agency prior to or concurrent with application to the City, but must be obtained prior to any grading taking place on the project. Storm water may not be routed directly to wetlands without "pre-treatment" such as a settling pond or infiltration area. A drainage ditch (County Ditch 10) borders the property on the northern edge and partially drains the wetland complex located on the parcel to be developed. Due to the presence of a drainage ditch, both the Board of Water and Soil Resources (BWSR) and the Army Corps of Engineers (ACOE) have jurisdiction over the wetland on the property. Indirect wetland impacts due to loss of hydrology (from altering the watershed of the wetland) would constitute a violation of the Wetland Conservation Act. Therefore, staff recommends that storm water from the building and parking area is routed to the wetland indirectly through the proposed rain garden (for example, a connection to the wetland via overflow channels or another approved method). This may entail grading the buffer setback area to create a small berm to ensure storm crater is not directly discharged to the wetland and to route the water to the rain garden. o In addition, the wetland delineation for the plat should be verified by a certified wetland delineator and City= Environmental Staff to ensure that wetland boundaries are not breached or impacted during the grading process to create the rain garden prior to work being conducted in the area. Erosion control measures (i.e. silt fence) should be installed between the wetland boundary and the area to be graded as a safety measure as well. With the potential of grading into the 20' wetland buffer setback comes the potential fox complete tree removal in the area. Oak wilt is a serious disease, which has severely affected oak trees in Sherburne County (and Elk River, specifically). Staff recommends that every precaution to preserve trees is implemented. Staff further recommends that any necessary= oak tree removal is conducted prior to March 315` or after July 15~' to minimise the potential for oak wilt infestation in the area. • It was noted that trash collection and dumpsters are located inside the underground parking garage. As a reminder, the trash collection area should be large enough to contain both waste and recycling containers for the complex. Multiple dwelling properties are required to include a minimum of bi-weekly collection of recyclables in the contract for refuse collection. ELK RIVER STATION APARTMENTS PROJECT DESCRIPTION The Elk River Station Apartments is proposed to be a four story structure with underground parking in a similar architectural style as the surrounding buildings. It's located in a new, growing part of the city, with a pristine wetland along the north boundary and access to commuter rail to the south. The site is very well located between retail and industrial job sources. The building itself would be wood frame with an underground concrete parking garage. It will be built with 100% maintenance free materials consisting of brick and vinyl siding. There will be well lit surface parking with one stall per unit plus 1/ stall shown as proof of parking in a lawn area.. The site will be well landscaped as shown on the drawings. Amenities would include aparty/gathering room, exercise room and site office. The developer would like to add a tot lot along the north side of the building, facing the wetland. The market for this site is clearly working families. The site is well located for access to the job market both within the city and commuting to the Minneapolis market. We are setting our rents to attract the 60% of median income families. That would be a minimum income earner of $20,000/yr and up to a maximum of $50,340, adjusted for family size. Rents would be in the range of $640 for a one bedroom, $750 for a two bedroom unit and $850 for a three bedroom apartment. Heated garage parking would be included in the rent. -AiX mm r R alt N N 7C <~ n y Itl ~,~, g~~~~~~ ~w~~~~~~~~~ ~ ~ ~'i A A D ~ ~ ~ ~ ~ o r. ~, O ~~~ ~~ mrnI N 0 ~ m X A ~ w 0 na 0 m Z B rn -+ i ~ ,~ / ~ ~ I I l ~ s , i ~ r i ti i i A / s / / I / 1 1 1 -~ Z I /~ ~`~~ ~'~ ~ ~ ` ~\ \ \ ~ 1 ` \~ \ 1 `~~ \ \ ~' ~ ~ ~ ~ ~~~ ~~ ~ ~ ~~~ ~ \ ~ ELK R[VERSTATION - 53 UNITS ~ NOt t0 BE ~ R ~~ e USED FOR ~ e ~ e CONSTRUCTION z ~ ELK RIVER, MN `~ 1~ i ~ ~~ i11 ~~ -~ ~ . m v ~~ ~~ mm ~e a~ ~m X .a _ X ~ w 0 N n B z N ~ 0 m =-r m r z z "~ :/ IN ~-~`K~~ ~~~p ~~ ~ i i~ i i i i i/ ~ \ P 'L~ ~ V I`\\\~ ~~ ~ ~ I ~ ~ I ~ ~ ~~ ~ ~ ~ ~. ~ 1 ` ~\ II ~ ~ ~ \ ~ 1 ~ ~ 1 ~ \ ~ 1 ~ 1 \ \ ~ ~ ~"~\ ~~ ~/ ~ ~ ~ ~ ~. ELK R STATION - S3 UNITS "~~ . ~ NOT TO BE o M ° USED FOR architects ~ ~•.surl~rlo MN ~ GONS1RUGtION www OAImALE, MN 55128 PN(851p148115 fAX (851)7~r1228 ELK RIVER an~ , . . NN N C~ n m d 0 O Z 0 0 ~{ ~ ~ X '' r jW ~ z ~ ~ ~. a ~ ~ Z ~ N T O m 3 ~ ~ rn rn ~I z ~~ ~' ~it ni ELK R STATION - 53 UNITS ~~ ~~ ~ g~ a • ~ N ELK RIVER, MN NOT TO SE a USED FOR GONSTRUGTION /~ ~~ ~~ m rr 0~ p 6 m m X A _ X J 4 0 n 0 z e m ' O ~p -~~1N ~aK~S ~ ~ ~~~~~~ I i I I I I l ~ / O / o ~ O r ~ i ~ ~~ ~ , i ~ ~L ~ i i ~ \ ~~\ \L\~\ J~ \ 1 \ \ \\ \ \ ~ ~ \ 11 ~ ~ \ \~\ \ 1 z `~w+~~~ I J L r. it ~ o ~ w~ eWi '" tl~ 6~ lP 6~ N ~ cn NN_ fti f ~ A d p ~ ~ b ~ N ~ ~ ~ ~ ~ ~ ~ ~z m ~ ~ /~c ~ ~ _ _ _ ~ _ ~ 1 x \~ ~ 1 N ~ \ ~ ~ \ G~ \~~ \~~ ~ ~ ~ ~ ~~ ~ ` \ ~\ m ~ (P ~ \ ~ --1 ~ ~ ~\ ~ ~ A z ~ ELK ~R STATION - 53 UNITS ~ NOT TO B~ ~: ~ F-+ a used ~oR O • ~ CONSTRUCTION ~ ~ W ELK RIVER, MN O ~ N 2 ' ~ ~ D ~ ~ ~ ~ b d A _ 3 3 W £) A 6` g n i O V' i ri A ~ ~ ~ ~ ~ , v ~C , a m ~ ~ n ~ ~ ,~ ~ ~- ~ y ~ ~r N ~ r~' 3 ~ ~ D n N ' ~ Cl 3 ~ ~ ,~', N D ~ ~ A ~ ~ ffAA ~ D ~ m (1 ~ ~ AZZ D ~1 ~ ~ DD m 3 ~ D n ~ ~ ~ ~ ~ ~ `m ~ = ~ D X Yn N RD j ~~ ( ~ ~ N r1V N j~ yj ( ~ m ~1 ~, N ~ ~ D (, ~ < m ~ ~ r N cmi. r ~ t~rt O D ~ ~ D j lh b- -ri l~ ~' ~ l~ h A y ~ ~ ' tn ~ U ~ ' ~ ~ N ~ -i -1 N w .n w w s. m ~ ~ b N D N ~ y a ~ a ~ o ® ~ o e e , = ~ , ~ ~ n i t i ,i h i i ,i~i h h ~ ~ ~ ~ p Z n L rn d r rn ~~ ~~ mm W W A "' 00 _~ x x 7 iy B A ~ ~m -i i_4n n ~ ~ ELK R[VERSTATION - 53 UNITS ~ NOT TO e~ ~. ~~ ~~ ° USED 1=0R architects` ~ o ~ ~ GONS1'RUG710N ~~~s~+~w•N•,surr=xio z ~ ~ ELK RIVER, MN ~ ,p,46175FAX(8.47)735.1718 ~~ ~m w w N 0 O X X ~ ~ O A ~~ m rt U r~ 1 C C r z s g y ELKRIVER STATION - 53 UNITS N 8 ELK RIt'[I;, I.IN N07 TO BE ~ USED FOR GON97RUGtION architects' 7~0 HUDSON ~.w. N. , SUITE 238 OAImALE, MN 65128 PF1(851i7148115 FAX (551)735.1228 www.dbeaah8ede.cam ~~ ~~ mm ww A~ 8 B =a Xx 7 y, 0 A N Z 1An W r O O r ]> z ELK R STATION - 53 ITNITS ~ NO1' TO ~>_ ~ y S - ° USED FOR ~ architects` ~ ~ ~~ ~ GONS1'RUG710N 7300NUDSONBLVD.N.,surrer~o n ~ ELK RIVER, MN ~ ~~I»~~~5FAX~851~r1728 ~~ ~~ mm w w A B 0 = A xx _~ a~ °- m z m rtt y~ 11 r O O ~l Z ~ ELI R[VER STATION - 53 UNITS .. ; B V ~ NO~ ~o E ~ ~ architects a USED FOR x S2 ~ ~ ELK RIVER MN ~ GONSl'RUG71ON ~H~or~e~w•N•,sur~x~o ~" ~''"~15~~``~'''~'~ , ~~ ~A ~~ ~~ 9 ~~ ~ _D [(~p~ w Ll ll mm p 0 :m A X X 7 0 (p A m _ ~ 6_ fmi~ f I t m .. m~ as e • = A X X ~ ~ 8 (~ A ~Tm 6f M N O m/n~ V' ~-7~-( tll )7~)~~ IR,/1 Y'\1 Y O Z m M ~ n ~ ~, o ° • N Zj ELK R STATION - 53 UNITS e NO~ -~O PE ~ ~ ~ .~ USED FOR ~ architects` " GONS7RUGtION riooNUOSONeiw.N.,sunExio ELK RIVER, MN ~,MN5512BPN(~1~1148115fAX~851n35.1718 www.dhee~iteda.oan E _ (~ I5 ~ ;Dp ~y ~ fiy ~ 77Dpp' ~W ~ ~ 0~ ~ ~ Q v w A ~ ~~ O B E STATE OF MINNESOTA CITY OF ELK RIVER CITY COUNCIL COUNTY OF SHERBURNE CONDITIONAL USE PROCEEDINGS CITY OF ELK RIVER In the matter o£ Duffy Development, LLC, on behalf of Elk River Station, LLP Request: Conditional Use Permit to amend the Planned Unit Development agreement (Case NO. CU 09-20) ORDER GRANTING CONDITIONAL USE Elk River Station, LLP ,Owner The above entitled matter came to be heard before the City Council on the 21St day of September, 2009, on a petition for a Conditional Use pursuant to the City of Elk River Zoning Ordinance, for the following described property: Outlot D, Elk River Station Sherburne County, Minnesota IT IS ORDERED that a Conditional Use be granted as upon the following conditions: 1. AS DESCRIBED IN AMENDMENT #1 DATED this 21st day of September, 2009. STATE OF MINNESOTA ) COUNTY OF SHERBURNE) ss. OFFICE OF CITY PLANNING AND ZONING. ELK RIVER CITY OF ELK RIVER I, Jeremy Barnhart, Planning Manager for the City of Elk River with and in for said City, do hereby certify that I have compared the foregoing copy and Order granting a Conditional Use with the original record thereof preserved in my office, and have found the same to be a true transcript of the whole thereof. If the proposed work described in a conditional use permit has not been substantially completed within two (2) years after its date of issuance, the permit shall expire and become void except that the Council may, following recommendations of the Planning Commission, extend the permit for an additional period determined by the council on the receipt of a request for a permit extension prior to its expiration. A Conditional Use permit authorizes only the use specified in the permit and shall expire if, for any reason, the authorized use ceases for more than one (1) year. Jeremy Barnhart Planning Manager IN TESTIMONY WHEREOF, Minnesota, in the County of Sherburne, 2009. I have hereunto subscribed my hand at Elk River, in the City of Elk River, on the day of DRAFTED BY: City of Elk River Elk River, Minnesota 55330 Signed before me a NOTARY PUBLIC this day of , 2009. S:\PLANNING MAIN\Case Files\CUP\CU 09-20 Depot ERStation-Duffy\Recoxding document.doc AMENDMENT NO. I to ELK RIVER STATION PLANNED UNIT DEVELOPMENT AGREEMENT CITY OF ELK RIVER, SHERBURNE COUNTY, MINNESOTA THIS AMENDMENT NO. 1 is made as of the 21st day of September, 2009, by and between the CITY OF ELK RIVER, Sherburne County, Minnesota (the City), and Elk River Station, LLP; a Minnesota Limited Liability Partnership. WITNESSETH: WHEREAS, on April 21, 2003, the City of Elk River and Elk River Station, LLP hereto entered into Elk River Station Planned Unit Development Agreement; and WHEREAS, on September 21, 2009 the Elk River City Council approved Amendment No. 1 to the Elk River Station Planned Unit Development. NOW, THEREFORE, it is hereby agreed by and between the parties here as follows: 1.) The Elk River Station Planned Unit Development Agreement is hereby amended as follows: Up to a 60 unit 4, story apartment building may be constructed on Outlot D, Elk River Station. Parking for this building may be at a ratio of 2.34 spaces per unit. 2.) The words, phrases, terms, and conditions used herein shall be interpreted the same as those used in the Elk River Station Planned Unit Development Agreement. 3.) All other terms and conditions of the Elk River Station Planned Unit Development Agreement, as amended, shall remain in full force and effect and shall be binding upon the parties hereto, except to the extent clearly inconsistent with the terms and conditions of this Amendment No. 1. IN WITNESS WHEREOF, the parties have caused this Amendment No. 1 to be duly executed in their names and on their behalf on or as of the date first above written. ATTEST: CITY OF ELK RIVER Tina Allard Its: City Clerk Stephanie Klinzing Its: Mayor DEVELOPER: By: Its: By: Its: STATE OF MINNESOTA ) ss. COUNTY OF SHERBURNE ) The foregoing instrument was acknowledged before me this day of 2009 by Stephanie Klinzing and Tina Allard, the Mayor and City Administrator, respectively, for the City of Elk River, Minnesota. Notary Public STATE OF MINNESOTA ) ss. COUNTY OF SHERBURNE ) The foregoing instrument was acknowledged before me this 2009, by of and Notary Public day of S:\PLANNING MAIN\Case Files\CUP\CU 09-20 Depot ER Station-Duffy\PUD Amendment LDOC Page 1 of 1 arnhar, Jeremy From: Colin Landers ~ .] a~~ Sent: Monday, September 2~, 2009 ~.3~ PM To: Barnhart, Jeremy Subject: Resident o~ the Woods at Elk River Station Please provide my email to the city council. I apologize for not being able to attend due to being notified of this today and prior work engagements, As detailed in the letter regarding the "9/2~ City Council Meeting to Consider 53-Unit Income-Based Housing Project Proposal for Site Located at 72nd and Twin Lalces Road." I am against building a complex of this nature near where I live, Not only am I concerned with the 4 points listed in the letter Income-based housing, Not the best project, Use of Association Amenities and Roads will wear faster} but also the fact that the property values in the area have already decreased and will further decrease with income-based housing such as this. I knave about studies to dispute this fact, but home sales in the area are dismal and aren't projected to improve for some time, And generally income-based housing does nothing to improve the area which is what we all want. As a homeowner, I don't need a building like this near my home, it looks bad in any aspect. To further clarify on the points in the letter.., Because the associations fees are already $i53 a month ~~$~80o yearly}, ~ don't believe it's fair that a housing complex would get "free" use of the grounds and amenities. I understand they are receiving special treatment based on their income, but there needs to be a compromise. Dne suggestion would be to lower the rates and have it subsidized by the builder forever, not just for X number of years I can't believe this is the first instance of this happening, so prior experiences would be helpful in this case to learn about other options. If there is going to be a apartment complex, there needs to be an additional entry to Twin Lakes Road from The v1loods at Elk River Station. Improving Twin Lakes Road near the rail station would be a start There are a few issues I see with the current setup... A -Curve at 4oMPH heading South on Twin Lakes Rd with wide pedestrian walk. while I don't want a stop sign ar light in the area, this may be needed as more traffic enters the area with the rail and complex. B -Entry from The Woods at Elk River Station to South bound Twin Lakes Road If you are adding more people, you need more exits. This is only going to get worse when the rail station is actively used late in this year. I appreciate you reading this and hope the right decision can be made, I wish that I could attend to further hear about additional issues the association or homeowners have. But ~ have voiced my concerns and hope they are taken into consideration. Thank you. ~ ~a concerned homeowner Colin Landers ~7~66 PolkCirNW Elk River, MN 55330 o~~~l~~009