Loading...
7.9. SR 11-18-1996CON~I LTING ENGINEER~ 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888-2923 Fax: 612-644-9446 CIVIL ENG4NEERING: ENVIRONMENTAL .... rJNICIPAL ,NNiNG SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTR!CAL/MECHANICAL FNGINEERrNG HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS .-m~FICES IN: ..NNEAPOLIS PRIOR LAKE ST. PAUL WASECA November 13, 1996 File: 230-331-10 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: LOWELL AVENUE FEASIBILITY STUDY Dear Council Members: Attached is a copy of the Lowell Avenue street improvement feasibility study. As you will recall, we had originally attempted to get the Lowell Avenue improvements added to the 171st Avenue project which is currently under construction. Due to concerns about timing from Beaudry Oil, we were unable to do that. Therefore, the City Council ordered a feasibility study and authorized the preparation of plans and specifications, anticipating construction in the spring of 1997. The attached feasibility study details the proposed improvements to Lowell Avenue between Main Street and Trunk Highway 10. The estimated cost of the project is $76,800. Based on the City's assessment policy of assessing $38 per front foot, it is anticipated that approximately 40% will be assessed to the abutting four properties. The remaining 60% would be funded by the City. Attached is a draft Resolution for the City Council's consideration. This Resolution accepts the feasibility study and orders the public hearing. The tentative schedule indicates that the public hearing could be held on December 16, 1996, at which time the plans and specifications could be officially ordered, approved, and authorization for the advertisement for bids given. This project is anticipated to be bid along with the Orono Lake 3rd improvements and Joplin Street south of County Road 30. If you have any questions regarding this information, please call. Sincerely, MSA, CONSULTING ENGINEERS Terry J.'Maurer, P.E. TJM:pd Attachments 331 - 1302. nov An Equal Opportunity Employer RESOLUTION 96 - 58 A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND ORDERING A PUBLIC HEARING ON THE IMPROVEMENT IN THE MATTER OF LOWELL AVENUE IMPROVEMENT OF 1996 WHEREAS the Feasibility Report ordered by the Council in Resolution 96 - 58 has been prepared with reference to the Lowell Avenue improvement and was received by the City on November 18, 1996; and the Feasibility Report recommends that the proposed improvement is feasible; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: The City Council will consider the Lowell Avenue improvement as described in the Feasibility Report and the assessment of the property abutting this proposed improvement for all or a portion of the cost of the improvement pursuant to Minnesota Statutes, Section 429 at an estimated total cost for the improvement of $76,800. A public hearing shall be held before the City Council on the proposed improvement on the 16th day of December, 1996, at 6:00 o'clock p.m. at Elk River City Hall Council Chambers. o The City Clerk shall provide two published notices (one week apart) in the official newspaper with at least three days between the last publication date and the hearing, and mailed notice ten days prior to the hearing as required by law. Passed and adopted this 18 day of November, 1996. ATTEST: Henry A. Duitsman, Mayor Sandra A. Thackeray, City Clerk 230/331 - 1209. nov