Loading...
5.0. SR 11-25-1996ITEM 5. ~ ~ity of iver MEMORANDUM Mayor and City Council FROM: Sandra Thackeray, City Clerk DATE: November 25, 1996 SUBJECT: 1997 Administrative Fees The city annually reviews its fees for services to ensure that the cost of administration and enforcement are covered and to ensure that the fees somewhat compare with surrounding communities of similar size. Last year the following administrative fees were adjusted by the City Council: * Residential special Ba~ing P~mi~Clea~ ~and OtO $25 A majority of the Administration fee increases were based on the 1995 Municipal License and Permit Survey conducted by the Association of Metropolitan Municipalities and compared to cities in the 10,000 to 20,000 population range. This same survey was used to compare fees for 1997. Based on the information in this survey, staff is not recommending any changes to the administrative fees in 1997. There are, however, some additional fees that were not included in the 1996 fee schedule. These fees are as follows: 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 *: Residential .Kennel License :$50.00 · · Video Operator. $75.00 first two hoursthen :::: : ::$25.00 per hour thereafter :: ::: ($75 minimum) own tape) ,:Dubbing Video Tapes $10 per tape (must provide own tape) · H:0usingMaintenance OrdinanCe : $5.00 * Aerial l~hotos $6.00 per Sheet g Aerial Topography:Maps $15~00 per acre · Surface Water Management Impact Fees - 3%~increase (see 1997:fee:surveY) Please see the attached 1997 fee schedule for proposed changes. ACTION REQUESTED: Staff is requesting Council to review the administrative fees for services. £ity of iver MEMORANDUM TO: FROM: DATE: SUBJECT: MAYOR AND CITY COUNCIL STEPHEN ROHLF, BUILDING AND ZONING ADMINISTRATOR NOVEMBER 25, 1996 ~ 1997 BUILDING AND ENVIRONMENTAL FEES BUILDING PERMIT FEES Single family and twin home building permits In 1996 the City adopted the 1994 Uniform Building Code (UBC). The new permit fee schedule with this code significantly increased building permit costs. The Council decided to spread this increased cost out over two years. They adopted the new fee schedule, but reduced the plan check fee from 65% to 35% of the building permit price until 1997. The following example using a house valued at $100,000 illustrates the increase: Year Permit & Increase plan check 1995 $1,105.50' 1996 $1,258.25' 1997 $1,526.75' +$152.75 +$268.50 Increase due to new fee schedule in 1994 UBC @ 35% plan check fee Increase due to 65% plan check fee *does not include Sewer Availability Charge Staff is recommending the plan check fee is increased to 65% to be consistent with the majority of other cities. If the council agrees, staff will notify builders of the pending change. Year to date, on single family and twin homes the City collected approximately $65,000 of plan checks fees, charging at the rate of 35% of the permit cost. At 65% of the permit cost the City would have collected approximately $120,000. The City lost $55,000 in revenue thus far in 1996 with the 35% plan check fee. s:Xb&z\stever\97fees.doc 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 Plumbing~ heating~ and other miscellaneous building permit fees: All of these permit fees were reviewed and appropriately adjusted in 1996. Staff is not recommending changes to these fees in 1997. Commercial and industrial building permit fees: The maximum allowed building and plan check fees for these permits are being charged. Staff is not recommending changes to these fees in 1997. ENVIRONMENTAL FEES Mineral excavation licenses The City increased this fee 33% in 1996 from $15 per acre to $20 per acre for land mined, but not reclaimed. Staff recommended this increase to help encourage reclamation; once the land is reclaimed no fee is charged. However, a license fee should be equal to the cost of administering the license. The current mineral excavation license fee adequately covers the City's administrative costs. Staff is not recommending an increase to this fee in 1997. Solid waste licenses The City charges $2,000 per year for a solid waste license. Elk River has three such licenses currently: Elk River Landfill, NRG's RDF plant, and UPA. The $2,000 license fee is to cover City staff time spent administering the license. The license fee is not meant to cover the cost renewing these permits, which is charged separately. The $2,000 fee adequately covers UPA and NRG. Consultant time for these permits is charged to them. The Landfill takes more than $2,000 worth of staff time a year, but there is surcharge money that covers this. Staff is not recommending an increase to this fee in 1997. Garbage hauler license, grading permits~ and wetland permits Garbage hauler licenses - $60 1st truck/$15 each additional truck Grading permits - $25 plus consultant time Wetland permits - $75 plus consultant time Staff feels these fees are adequate for 1997 and are not recommending changes. City of iver FROM: DATE: SUBJECT: MEMORANDUM Mayor and City Council Steven B. Ach, City Planner~//~ November 25, 1996 Discuss Planning and Park Fees Overview Each year, the Planning Department conducts a survey of surrounding cities and other developing communities in the metro area to get a list of their respective planning and park dedication fees. This survey helps provide a basis for adjusting the City of Elk River's fees, as well as recognizing what other communities are charging for their development fees. Last year, the City Council adjusted the following planning fees: Conditional use permit (commercial/industrial) $300 (increase of $50) Preliminary plat $500 plus $5 for each lot over 50 (added per lot fee) Site plan review 250 (increase of $50) Based on the amendments made last year and the survey conducted this year, the planning department is not recommending any changes be made to the existing planning application fees. However, I must point out to the Council that in some instances, the existing application fees do not come close to covering the staff time involved in reviewing and monitoring some of the developments that are being proposed. For example, larger residential plats involve several pre-application meetings with the developer, as well as time spent preparing reports, secretarial time typing reports, and further follow-up after the Planning Commission and City Council's meeting. Therefore, I do believe that there is justification to adjust the preliminary plat fee if it is the desire of the Council to have the application fee cover staff time. Park Dedication Fees Another fee that is included in the annual survey is the park dedication fees. As outlined in the survey, the park dedication fee for single family developments has a wide range from $384 per lot in the City of Coon Rapids up to $1,000 per lot in the City of Woodbury. The average of the cities 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 Memo to the Mayor and City Council Page 2 Planning & Park Dedication Fees November 25, 1996 surveyed is $729.00 per single family lot. The City of Elk River's park dedication fee is currently $550 per residential unit and will be increasing to $600 per unit the first of the year. The Park and Recreation Commission discussed the current park dedication fees at their November meeting and recommended the Council consider establishing a trail fee on a per lot basis to be used towards the development of trails. Currently, the city's policy is to either credit a developer's park dedication requirement for any trails that need to be developed within a project or, ff the trail costs exceed the park dedication required, the city would reimburse the developer for those trail construction expenses. As trail development continues to be an integral part of developments and the city' park and recreation system, the Council may want to discuss the financing of developing these trails and the possibility of instituting some type of trail fee for residential plats. The Park & Recreation Commission has recommended the Council consider establishing a $100 per lot trail fee. Such a fee is not uncommon as other cities have also established such a fee. Recommendation The City Council is asked to review the attached survey and consider the city's current planning application fees and park dedication fees and provide staff direction of any changes that may need to be made. s:\council\planfees.doc APPLICATION FEE SURVEY CITY COMP PLAN REZONE PRELIMINARY FINAL PLAT CONDITIONAL USE PERMIT SITE VARIANCE PLANNED ADMIN. PARK DEDICATION EASEMENT OTHER AMENDMENT PLAT PLAN UNIT SUBDI- FEES VACATION Residential/Commercial/Industrial REVIEW DEVELOP. VISION Resident./Cornm./indust. APPLE $365 $365 $365 $80 + $2.50fLot $210 all $80 $80 - res $1050 $130 res 10% land value $110 sub VALLEY over 10 $160 - other comJind 5% land value waiver $130 BLAINE $500 $300 $500 + $5/1ot & $250 res $100 $250 res $100 N/A $250 res $620, corn $1860/ac. N/A $15/ac. com/ind $250 others $250 ind $1630/ac. BROOKLYN $500 $300 $10/lot ($200min- N/A $150 + $500 escrow all N/A $100 $150 + $500 $150 + SFD $800, TH $600, Apt N/A PARK $300max), escrow $350 $600, comm $2900/ac., $100/ac.($750min- escrow ind $1800/ac. $1500max) escrow COON RAPIDS $305 $305 $245 $125 $305 all $305 $125 $245 $125 $384 SFD, $238/unit N]A concept multi, $326/unit dup, $490 prelim $286 townhouse, $1152 $125 fin res /ac. com/ind $245 fin corn DAYTON N/A $150 + $200 + $20/lot & N/A $100 home occ. + $500 escrow $150 + $100 + $300 N/A $150 + $450/lot res $75 + $300 $1,000 $1,000 escrow $200 corem + $700 escrow $750 escrow res $500 5% land area or escrow escrow $ 50 small + $200 escrow escrow $100 + $500 escrow $1,000/ac. corn escrow other LAKEVILLE N/A $500 $250 +$5/1ot $150 + $200 single family N/A $200 SFD $500, $1,000 $50 LAND $300 zoning $1,000 $1,000 escrow $5/lot $300 others $300 others escrow $500 res - 10%-20% depending $1,000 escrow text escrow $1,000 escrow $500 escrow $500 escrow escrow on # of units amend comm]ind- 5% gross area $500 CASH $1000 $900/dwelling escrow 5% mkt value of unimHrove land com/ind MAPLE GROVE $200 $200 + $250 + $100 $200 all +escrow $250 + $150 $250 + $100 $845/unit $250 $20/Acre $5.00/Lot escrow $20/ac. $3600/ac. com $2775/ac. ind PLYMOUTH $390 + escrow $450 + $285 or $21/ac.+ $135 $200 all + escrow $265 100 + escrow $400 $135/1ot res $1300/unit N/A escrow $10/lot concept com]ind $4050/ac. $153 prelim $135 final + fees for lu amend, rezone, pre lim and final plat and CUP CITY COMP PLAN REZONE PRELIMINARY FINAL PLAT CONDITIONAL USE PERMIT SITE VARIANCE PLANNED ADMIN. PARK DEDICATION EASEMENT OTHER AMENDMENT PLAT PLAN UNIT SUBDI- FEES VACATION Residential/Commercial/Industrial REVIEW DEVELOP. VISION Resident./Comm./Indust. RAMSEY N/A $75 + $300 $75 + $750 Escrow $75 + $750 $75 + $300 escrow all $75 + $75 + $75 + 300 $75 + 200 res $600/lot rural, $75 + $225 Escrow escrow $500 $300 Escrow escrow escrow $825llot urban escrow Escrow corn 5% mkt value or $4300/ac. ind 5% mkt value or $2100 per ac. ROGERS $500 $500 $300 min or $100 $100 all $200 $200 $100 N/A $560flot or 10% gross cover cost of EAW - $100/Lot area - res admin fees cover $1800/ac. - corn costs $1400/ac. - ind SAVAGE -0- $225 res. $250 + $5/lot $175 + $2flot $150 res. -0- $125 $250 + $150 $750/dwelling or 10% of $125 $300 other $200 other $2/unit res. land SFD $350 + $555//dwelling or 10% of $17/ac. land MULTI other $4200/ac. or 7% land COM. $2450/ac. or 7% land IND WOODBUR¥ $500 + escrow $300 < lac. $300 + $5/lot $200 + $5/lot $200 all $300 + $75 res $500 $100 + CASH N/A zoning $500 > lac. escrow $200com]ind general plan escrow $1,000per lot SFD text escrow + escrow $500 final $800 unit multi amend plan $2,000/ac. com]ind $250+ + escrow LAND escrow 10% res & com]ind ZIMMERMAN N/A $250 $250 + $10/lot $400 res $100 N/A $250 N/A $250 7.5% land area or Mkt N/A com]ind $350 value SFD, 12% 2 fam, 15% multi, com/ind 5% I land area or mkt value ELK RIVER $250 $250 $500 + $5 per N/A $100 res $250 $150 rezone $150 $550 / unit res $150 lot for each $300 com]ind prelim $1750 per ac. corn lot over 50 plat & CUPfees $1100** [ res - $156 res - $130 AVERAGE tEE $351 I $317 $ 545* $135' com/ind - $217 $212 other - $912'* $150 $729 / unit* $155 --- $163 ~ Based on 40 acre parcel plated into 14, 2 1/2 acre lots ** Based on a 100 lot PUD CITY OF ELK RIVER PROPOSED 1997 FEE SCHEDULE ASSESSMENT SEARCH/CERTIFICATION: ANIMAL LICENSES Cat Dog Residential Kennel Commercial Kennel AUDIO/VISUAl. Dubbin.q Audio Tapes Dubbin.q Video Tapes Video Operator BOWLING ALLEY LICENSE: BUILDING PERMIT: Industrial, commercial, muitifamily residential, single family homes, and additions State Residential Contractor License Search Miscellaneous Building Permits Heating, Ventilation, and Air Conditioning Gas Fitting Permit Fee Gas Fitter's License Plumbing Permit BURNING PERMITS - regular Special Residential Special to Clear Land Special Daytime $ 15.00/each $ 5.00/2 yrs. $ 10.00/2 yrs. $ 5o.oolyr $ 75.00/yr. $5.00 per tape (must provide own tape) $10.00 per tape (must provide own tape) $75.00 first two hours then $25.00 per hour ($75 minimum) $ 50.00/10 lanes $ 5.00 each addl lane State permit fee, UBC Table lA, pluls 65% plan check fee plan choc~ fam!!;,/.~-::!n home (valuation based on current State of MN bulding valuation data) $ 5.00/permit City permit tee Schedule Exhibit C plus State Surcharge City permit fee Schedule Exhibit B City permit fee Scheculd Exhibit A $ 24.00/year City permit fee Schedule D $ 0 $ 10.00 $ 25.00 $ 25.00 CIGARETTE: $ 25.00/year $ .20/ea. COMMUNITY PROFILE: DOCUMENTS: Audit Budget City Code Copies Growth Management Plan Housin.q Maintenance Ordinance Sign Ordinance Solid Waste Ordinance Subdivision Ordinance Zoning Ordinance 0 o 75.00 .25/page 25.00 5.oo 5.oo 1 o.oo ~o.oo 25.oo FLAG - (City) GARBAGE HAULER LICENSE: GRADING PERMIT: LIQUOR LICENSE: Club Intoxicating On Sale Intoxicating Sunday On Sale Investigation Fee Corporation Single Non-Intoxicating Off Sale Non-Intoxicating On Sale Set Up Wine Temporary Non-Intoxicating Temporary Intoxicating MAPS: Aerial Photos Aerial Topography Maps Large Base, Zoning or Land Use Map Medium Base or Zoning Map Medium Base Ward Map MARKETING BROCURE: MASSAGE ESTABLISHMENT: Initial Fee (Includes Investigation Fee) Single Corporation $ 32.00 each $ 60.00 1st truck/ $ 15.00/each addl truck $ 25.00 plus City Consultant fees if required to process application $ 300.00/year $4,000.00/year $ 200.00/year $ 250.00 $ 15o.oo $ 75.00/year $ 225.00/year $ 75.00/year $ 650.00/year $ 20.00/day $ 20.00/day $6.00 per sheet $15.00 per acre $ 3.00 $ 2.00 $ 2.00 $ 3.00/ea. $ 200.00 $ 3oo.oo Partnership Renewal Fee MASSAGE THERAPIST: Initial Fee (Includes Investigation Fee) Renewal Fee MECHANICAL AMUSEMENT: Mechanical Rides Pin Ball Games Pool Tables (Coin Operated) Video Games MINERAL EXTRACTION: PARK DEDICATION FEE: (Resolution 95-89) Residential Commercial Industrial PARKING STICKERS: (Railroad Parking Lot) PARK RESERVATION FEE: A Deposit is Required: Residents Arts Council Community Education (Community Festival No Deposit Required) School District Chamber & Large Community Events Deposit is Refundable if the Shelter and Surrounding Area is Cleaned of Refuse and Debris Prior to Leaving the Area. PAWN SHOPS: Investi.qation Fee PINS: (Plastic-Elk River) (Metal-Elk River) $ 300.00 $ 150.00 $ 150.00 $ lOO.OO $ 35.00/ride $ 35.00/machine $ 35.00/table $ 35.00/game $ 20.O0/acre to be actively mined in forthcoming year or not reclaimed $ 5.00/acre approved but not actively mined $ 550.00/dwelling unit - 1/1/96 $ 600.00/dwelling unit - 1/1/97 $ 650.00/dwelling unit - 1/1/98 $1,750.O0/per acre - 1/1/96 $ 2,000.00/per acre - 1/1/97 N/A $ 12.00/space 3 stickers/space maximum $ 50.00 $ 100.00 $ lOO.OO $ 100.00 $ 5o0.00 $12,0001,75g.gg/year $1,500 $ .35 each $ 2.50 each SEPTIC INSTALLATION: $ 60.00 SEPTIC REPAIR: $ 30.00 SEWER AVAILABILITY CHARGE (SAC): (Plant replacement interceptor) SIGN PERMITS Up to 100 square feet 101-300 square feet Over 300 square feet Yearly Advertising Structure (Billboard) Inspection SOLID WASTE FACILITY LICENSE: STREET DISRUPTION OR UTILITY HOOKUP PERMIT: SURFACE WATER MANAGEMENT IMPACT FEE: 3% annual increase TRANSIENT MERCHANT LICENSE: WATER ACCESS CHARGE: (Contact Municipal Utilities-441-2020) WATER CONNECTION CHARGE: (Contact Municipal Utilities-441-2020) WETLAND DRAINING OR FILLING PERMIT: ZONING/PLANNING APPLICATIONS: Administrative Subdivision Conditional Use Permit Commercial/Industrial Residential Amendments and Renewals requiring Public Hearings $1,300.00 $ 30.00 $ 90.00 $ 150.00 $ 10.00 $2,000.00 plus cost reviewing license Amount of annual cost incurred by the City for monitoring and inspecting the facility plus the license $ 25.00 $ 65.56 ~Z1.80 per resid, lot (rural) $ 131.13 123.~9 per resid, lot (urban) $ 786.81 ~ per acre (multi-family, commercial and industrial) $ 50.00/year $ 300.00 $ 700.00 75.00 plus City Consultant fees if required to process application $ 150.00 plus Park Dedication if $ 300.00 $ 100.00 $ 75.00 Easement Vacation Multiple Principal Buildings Nonconforming Sign Alteration Ordinance Amendment Plats Permitted Home Occupations Planned Unit Development (PUD) Site Plan Review Variance Zone Change Other Zoning Requests s:document/fees.doc $ 150.00 $ 200.00 plus Park: Dedication Jt applicable $ 110.00 $ 3OO.OO $ 500.00 + $5.00 per lot for each lot over 50. $ 15.oo Charge for whatever zoning is needed to review the PUD (Conditional Use, plat, Concept Review, etc.) $ 250.00 $ 15o.oo $ 250.00 $ 5o.oo ty of iver FROM: DATE: SUBJECT: MEMORANDUM Pat Klaers, Steve Rohlf, Steve Ach, Lori Johnson, Cliff Skogstad, Tom Zerwas, and Phil Hals Sandra Thackeray, City Clerk October 31, 1996 Renewal of Licenses and Fees The City's licenses and fees are reviewed by staff on an annual basis. The Council has requested that there be a worksession to discuss the city's current fees and licenses. This worksession will be held on November 25, 1996. Attached is the material that was presented to the council in 1995 for the 1996 fee and license structure. Also attached is the 1996 fee schedule that was set by council. Please be prepared to discuss the 1996 license and fee schedule. Also be prepared to back-up proposed increases for 1997. s:Xcouncil\foesmemo.doc 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 RESOLUTION 95-8--8 A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ADOPTING FEES FOR SERVICES FOR 1996 WHEREAS, the cost incurred to process the various hcenses, services, zoning and planning requests, etc., has been studies; and WHEREAS, the study of these fees has resulted m an increase in certain fees; and WHEREAS, this resolution reflects the fees charged by the City for 1996. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota, that fees for services for the year 1996 shall be adopted as indicated on the attached Fee Schedule. Passed and adopted by the Elk River City Council this 18th day of December, 1995. ATTEST: ~an~kra A. Thacl~er~y, City CI~ A. Duitsman, Mayor CITY OF ELK RIVER 1996 FEE SCHEDULE ASSESSMENT SEARCH/CERTIFICATION: ANIMAL LICENSES Cat Dog Kennel (over 3 dogs) $ 15.00/each $ 5.00/2 yrs. $ 10.00/2 yrs. $ 75.00/year BOWLING ALLEY LICENSE: BUILDING PERMIT: Industrial, commercial, multifamily residential, single family homes, and additions State Residential Contractor License Search Miscellaneous Building Permits Heating, Ventilation, and Air Conditioning Gas Fitting Permit Fee Gas Fitter's License Plumbing Permit BURNING PERMITS - regular Special Residential Special to Clear Land Special Daytime CIGARETTE: DOCUMENTS: Audit Budget City Code Copies Growth Management Plan Sign Ordinance $ 50.00/10 lanes $ 5.00 each addl lane State permit fee, UBC Table lA, pluls 65% plan check fee Commercial/industrial - 35% plan check fee - single family/twin home (valuation based on current State of MN bulding valuation data) $ 5.00/permit City permit fee Schedule Exhibit C plus State Surcharge City permit fee Schedule Exhibit B City permit fee Scheculd Exhibit A $ 24.00/year City permit fee Schedule C $ 0 $ 10.00 $ 25.00 $ 25.00 $ 25.00/year $ 0 $ 0 $ 75.00 $ .25/page $ 25.00 $ 5.00 City of Elk River Fee Schedule Resolution 95-88 Effective Janua/3, 1, 1996 Page 2 DOCUMENTS: Solid Waste Ordinance Subdivision Ordinance Zoning Ordinance FLAG - (City) GARBAGE HAULER LICENSE: GRADING PERMIT: LIQUOR LICENSE: Club Intoxicating On Sale Intoxicating Sunday On Sale Non-Intoxicating Off Sale Non-Intoxicating On Sale Set Up Wine Temporary Non-Intoxicating Temporary Intoxicating MAPS: Large Base, Zoning or Land Use Map Medium Base or Zoning Map Medium Base Ward Map MASSAGE ESTABLISHMENT: Initial Fee Single Corporation Partnership Renewal Fee MASSAGE THERAPIST: Initial Fee Renewal Fee MECHANICAL AMUSEMENT: Mechanical Rides Pin Ball Games Pool Tables (Coin Operated) Video Games $ 10.00 $ ~o.oo $ 25.00 $ 32.00 each $ 60.00 1st truck/ $ 15.00/each addl truck $ 25.00 plus City Consultant fees if required to process application $ 300.00/year $4,000.00/year $ 200.00/year $ 75.00/year $ 225.00/year $ 75.00/year $ 650.00/year $ 20.00/day $ 20.00/day $ 3.00 $ 2.0O $ 2.OO $ 200.00 $ 3OO.O0 $ 3OO.OO $ 150.00 $ 150.00 $ 100.00 $ 35.00/ride $ 35.00/machine $ 35.00/table $ 35.00/game City of Elk River Fee Schedule Resolution 95-88 Effective January 1, 1996 MINERAL EXTRACTION: PARK DEDICATION FEE: (Resolution 95-89) Residential Commercial Industrial PARKING 'STICKERS: (Railroad Parking Lot) PAWN SHOPS: PINS: (Plastic-Elk River) (Metal-Elk Riverl SEPTIC INSTALLATION: SEPTIC REPAIR: SEWER AVAILABILITY CHARGE (SAC): (Plant replacement interceptor) SIGN PERMITS Up to 100 square feet 101-300 square feet Over 300 square feet Yearly Advertising Structure (Billboard) Inspection SOLID WASTE FACILITY LICENSE: STREET DISRUPTION OR UTILITY HOOKUP PERMIT: SURFACE WATERMANAGEMENT IMPACT FEE: Page 3 $ 20.O0/acre to be actively mined in forthcoming year or not reclaimed $ 5.00/acre approved but not actively mined 550.00/dwelling unit- 1/1/96 600.00/dwelling unit - 1/1/97 650.00/dwelling unit - 1/1/98 1,750.00/per acre - 1/1/96 2,000.00/per acre - 1/1/97 N/A 12.00/space stickers/space maximum 1,750.00/year $ .35 each $ 2.50 each $ 60.00 $ 30.00 $1,300.00 $ 30.00 $ 90.00 $ 15o.oo $ 10.00 $2,000.00 plus cost reviewing license Amount of annual cost incurred by the City for rr',,onitoring and inspecting the facility plus the ii.~ense $ 25.00 $ 61.80 per residential lot (rural) $ 123.60 per residential lot (urban) $ 741.60 per acre (muitifamily, commercial and industrial) City of Elk River Fee Schedule Resolution 95-88 Effective January 1, 1996 TRANSIENT MERCHANT LICENSF: $ 50.00/year WATER ACCESS CHARGF: (Contact Municipal Utilities-441-2020) $ 300.00 WATER CONNECTION CHARGE: (Contact Municipal Utilities-441-2020) $ 700.00 WETLAND DRAINING OR FILLING PERMIT: $ 75.00 plus City Consultant fees if required to process application ZONING/PLANNING APPLICATION,~: (Note: Extraordinary City Consultant time will be charged back to petitioners of all zoning requests) Administrative Subdivision Conditional Use Permit Commercial/Industrial Residential Amendments and Renewals requiring Public Hearings $ 150.00 plus Park Dedication is applicable $ 300.00 $ 100.00 $ 75.00 Concept Review $ 200.00 (applied to application fee if application proceeds) Easement Vacation Multiple Principal Buildings $ 150.00 $ 200.00 plus Park Dedication if applicable Nonconforming Sign Alteration $ 110.00 Ordinance Amendment $ 300.00 Plats $ 500.00 + $5.00 per lot for each lot over 50. Retainer/Application Fee Concept Review fee. Actual cost incurred by the City for review of the plat plus park dedication if applicable ~ Permitted Home Occupations $ 15.00 Planned Unit Development (PUD} Charge for whatever zoning is needed to review the PUD (Conditional Use, plat, Concept Review, etc.) Page 4 City of Elk River Fee Schedule Resolution 95-88 Effective January 1, 1996 Page 5 Site Plan Review Variance Zone Change Other Zoning Requests $ 250.00 $ ]50.00 $ 250.00 $ so.oo City o'f Elk River_ Fuel-Gas Piping Permit Fees The Chief Buila~ng Inspector, before iss~Jng any permit for the installation of any fuel-gas piping, shall require the payment by the applicant for such permit of fees in the amount herein provided. Minim,~m Fee In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than Eighteen Dollars ($18.00). Basic Fees The fees for all fuel-gas piping permits shall be computed on the basis of the number of fuel-gas appliances. The fee for each appliance so, provided for shall, except as herinafter other~'ise specifically provided, be Six Dollars ($6.00) for each fuel-gas appliance. VVhere any such permit is issued for roughing in of fuel-gas l~nes for future appliances, a fee of SLx Dollars ($6.00) shall be charged for each line or ]ines. (c) In addition to the Six Dollar ($6.00) charge for each fuel-gas appliance ancl future fuel-gas lines run for appliance, a Six Dollar ($6.00) charge for the main fuel gas supply in the building shall be charged. For the purpose of this article, a gas appliance shall be taken to mean a furnace, range, water heater, dryer, fireplace, barbecue, etc. ORD-fuel~bz EXITIBIT B CITY OF ELK RIVER HEATING. VENTILATION, AND AIR CONDITIONINC PERMIT FEES FEES REQUIRED The Chief Building Inspector, before issuing any permit for the installation, alteration, or repair of any heating, ventilation, and air conditioning appliance items, connections or appendages, shall require the payment by the applicant for such permit of fees in the amount herein. MI~-IM-UM FEE In no case shall the fee charged for any permit issued b~.v'~he Chief B~dlding Inspector be less than $18.00. M~XI MO-M FEE In no case shah the fee charged for any permit issued by the Chief Building Inspector be more than $100.00 for a single family home. PERMIT FEE FOR HEATING. VENTII,ATION, Ai'gD AIR CONDITIONINC APPLIANCE ITEMS. CONNECTIONS OR APPENDAGES For any permit for the installation, alteration, or repair of the above- referenced items, the fee shall be one percent (1%) of the valuation of the work or as calculated under the Un~form Mechanical Code, whichever is greater. ordin-dafoz EXHIBIT C CITY OF ELK RIVER MISCELLANEOUS PERdVIXT FEES Dechs $8.00 per square foot for valuation for permit fee; plus State Surcharge. Plan check is included with this price. ~e~ces Under 6 feet no charge/over 6 feet $15.00 plus state surcharge FirePlaces and Wood Stoues $20.00 plus state surcharge- $15.00 plus state surcharge for a burning apphance installed into an existing chimney Garages and Basemer~t Finish $10.00 per square foot for valuation, use building permit fee plus State Surcharge. Plan check is included with this price. Re-Roo[ Residential-S35.00 plus state surcharge. Commercial/Industrial- $.50 per square foot for valuation for permit fee plus State Surcharge. Swimmin.¢ Pools $35.00 plus state surcharge 3 Secson Porches $40.00 X the square footage equals the valuation for the permit fee plus state surcharge. Plan check is included with this price. Movin.~ Structures Moving structures in- $150.00 plus state surcharge Moving structures .out- $35.00 permit fee fees/bz ,ty of 5.15 A, B, & C MEMORANDUM iver Mayor and City Council FROM: Stephen Rohlf, Building and Zoning Administrator DATE: December 5, 1995 SUBJECT: Adoption of the 1994 State Building Code, Building Permit Fees, and Mineral Excavation License Fees 5.15A Adoption of the 1994 Building Code Attached, is a memo from Cliff Skogstad, Building Official, dated October 16, 1995, that explains the specifics with the adoption of the new State Building Code. In order to adopt the new building code, Chapter 10, Subsection 1000.00, of the City Code of Ordinances titled "Adoption of State Building Code", must be amended. Action Requested: Adopt Attached Ordinance Amendment to Amend Chapter 10 5.15B Building Permit Fees The Building and Zoning Department is proposing to modify several of the miscellaneous permit fees, the heating, ventilation, and air conditioning fees, and building permit fees. Mr. Skogstad elaborates on these in his attached October 16, 1995, memo. Action Requested: Pass Fee Resolution 5.15C Mineral Excavation License In 1995, the city charged $15.00 per acre for land that was goihg to be mined in the forthcoming year or was approved to be mined. In 1996, staff is proposing this fee be increased to $20.00 per acre to cover the cost of administering the gravel mining licenses. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 In 1995, the city charged $5.00 per acre for land that was mined and not reclaimed. Staffis proposing to increase this fee to $10.00 per acre to act as more of an incentive to get lands reclaimed. Staff has notified the gravel companies of these proposed changes. Action Requested: Pass Fee Resolution ccl2-5/bz/stever MEMORANDUM TO: FROM: DATE: SUBJECT: Mayor and City Council Cliff Skogstad, Building Official October 16, 1995 Adoption of the New Building Code and Fee Schedules Provided for you in this memo, are many different areas that we wish to have addressed at this time. Staffs intention is to update the following areas to be ' in comphance with State regulations and city codes. The following is included with this memo: Section 1000 of the City Code regarding the adoption of the 1994 State Building Codes. 2. Adopting a new City of Elk River fuel gas piping permit fee. Adopting a new City of Elk River Heating, Ventilation, and Air Conditioning permit fee. 4. Adoption of the City of Elk River's miscellaneous permit fee schedule. The first item is the adoption of the 1994 UnWorm Building Code. Approximately every three years, the Uniform Building Code is updated by the International Conference of Buildin g Officials and then published. Once published, the code is presented to the State Building Code Division. The State Building Code Division writes the new State Buildin g Code with amendment to the Uniform Building Code. Once this code has been adopted by the State, all municipalities can adopt the State Building Code with amendments to the Uniform Building Code. The 1994 State Building Code was adopted on March 20, 1995. With the adoption of this new code, there are certain areas that need to be brought to your attention. The State Building CSde Division never adopted the 1991 code. The reason for this action was to start working on the 1994 code and have it adopted in 1995. The State Building Code was always running about slx years behind in regard to the adoption of the Uniform Building Cbde. The Building Code Division felt it was a good time to bring all the codes up to date. Secondly, in regard to the adoption of the codes, two building code chapters were added to this section of the ordinance, letters "S" Page 2 and "T". The Uniform Building Code Appendix, Chapter 15, regarding re- roofing, assists building inspectors in the inspecting process on all re-roofing projects and gives them a guideline for work being completed. This chapter was in the 1988 Building Code, but was under Chapter 25 and not an appendix chapter. Since it is now an appendix chapter, it must be adopted with the city codes. The Uniform Building Code Appendix, Chapter 33, for excavation and grading, assists the building inspector for recognizing hazardous excavating regarding cutting of soils for foundations and recommendations for protection of these excavated sites. It also assists in the recommendations for soil engineering reports and engineered grading requirements, erosion control, and all necessary inspections for this type of activity. Once again, this ch'apter was in the 1988 Uniform Building Code but was not an appendix chapter. One of the major changes with the adoption of the 1994 Uniform Building Code is Table lA, for building permit fees. With the elimination of the 1991 Uniform Building Code, we have not seen a change in building fees for approximately five years. With the adoption of this new code there has been a dramatic change in the permit fees. Provided for you is a scenario of the changes. Assuming a residential structure at $100,000 valuation, the 1988 Uniform Building Code permit price out of table 3A (which is our current permit pricing schedule) would be a total price of $1,105.50. This does not include a septic permit fee of $65.00 or a SAC charge of $1300. The same house with a valuation of $100,000 using table lA from the 1994 Uniform Building Code would be $1,527. This would be an increase of $421.50. Again, this price includes permit fee, plan check fee, and state surcharge and does not include a $1300 SAC charge or a $65.00 septic charge. Staff feels that this may be a fee that would be a very heavy burden on homeowners and contractors. A gradual increase may be better at this time. Staffis proposing to leave the permit fee the same as what we have in Table 3A until the end of 1995 and start January 1, 1996 with commercial and industrial permit fees based out of Table lA of the 1994 Uniform Building Code. All residential projects would also have their permit prices based out of Table lA of the 1994 Uniform Building Code, but instead of a 65% plan check fee for residential, it would be a 35% plan check fee. The permit price using the same scenario of $100,000 would be $1,258. This would be a $152.50 increase from the 1988 Uniform Building Code permit fee schedule. We would then go to a 65% plan check fee January 1, 1997. This will allow us to give all residential contractors a notice of price changing on permit fees and will give them the opportunity to put these price changes into their bid prices. In addition, notice will be given to all commercial and industrial contractors of the January 1, 1996, price change. lO-16cs/bz Page 3 The second and third items are Exhibit A regarding fuel gas piping fees and Exhibit B regarding heating, ventilation, and air conditioning. These two items were combined in the current CiW Code and we wish at this time to separate the two, as they are two completely different types of work. Exhibit A for fuel gas piping requires a hcense with the city and also a bond. We have found that many different contractors were runnin g gas lines without a hcense or a bond. With this change, it will assist the inspectors to more define this type of work and put hcensed pipe fitters on all gas piping. Exhibit B is a fee that we wish to charge for all heating, ventilation, and air conditioning projects. This fee is 1% of the total valuation of the work being performed. In the past, we never had a price for this type of work but were doing plan reviews and inspections. This allows us to charge for all the inspections that are being performed. The last item is Exhibit C regarding miscellaneous permit fees. St~W is trying to base all valuations off of square footage with these fees. We have learned from other municipalities that using a base price has put them into a legal court system. Contractors felt that they were being charged too much for the smaller projects and allowing the larger projects to be a lot less than expected. Using square footage for valuation allows the smaller projects to become a fair permit price along with the larger projects, thus allowing unfair situations. At this time staff is requesting the adoption of the 1994 State Building Code with Appendix Chapter 15 and Appendix Chapter 33, and the residential permit price change stated above. Also, the adoptions of Exhibit A, B, and C. If you have any further questions, I will be at Monday night's meeting. lO-16cs/bz ~ty of River ITEM 5.15.d TO: FROM: DATE: SUBJECT: MEMORANDUM Mayor and City Council Steven B. Ach, City Planner~ December 18, 1995 Park Dedication Fees Issue. Consider Resolution No. 95-__, amending the park dedication fees for ali residential and commercial development. Attachments · Resolution No. 95-__ · Memo to the Park and Recreation Commission dated September 13, 1995 · Minutes from the September 13, 1995 Park and Recreation meeting · Survey of park dedication fees Overview In 1992, the City Council adopted a resolution which adjusted the park dedication fees on an annual basis by $50.00 for a three-year period. The last adjustment as set forth in the resolution was made on 1/1/95 which brought the fee up to $500 per dwelling unit for residential development. Attached for the Council's review is a survey of other communities' park dedication fees. Park and Recreation Commission The Park and Recreation Commission, at their September 13,.. 1995 meeting, discussed an increase in park dedication fees. The Park and~ec Commission recommended increasing the fee for single family and multi-family development by $100 per lot annually for the next two years. The Commission also recommended increasing the commercial park dedication fee from the current rate of $1,500 per acre to $2,000 per acre in 1996 and $2,500 per acre in 1997. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 Commercial Park Dedication Currently, the City of Elk River has a rural and urban park dedication fee. The proposed resolution would eliminate the rural rate and equ,lize the commercial dedication. There is not a lot of rural commercial development and when it does occur, they are held to the same standards as urban commercial. Therefore, staff believes the rate for urban and rural should be identical. Recommendation The attached resolution establishes a park dedication fee increase as recommended by the Park and Recreation Commission for residential and the first year increase for commercial. Staff would like to review the commercial park dedication rate later this year to determine ff an increase to $2,500 per acre is appropriate or ff that fee should actually be higher. It is recommended the City Council adopt Resolution 95- , amending the park dedication fees as set forth in the attached resolution. s:council:parkdedi RESOLUTION 95- RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION AMENDING THE PARK DEDICATION FEE FOR ALL RESIDENTIAL DWELLING UNITS AND COMMERCIAL DEVELOPMENT WHEREAS, the City Council of the City of Elk River in Or3inance 87-1 estabhshed that the City Council can require a fixed fee to be paid for Park Dedication purposes and that this fee shall be set by resolution of the City Council; and, WHEREAS, the Elk River City Council has received and reviewed a recommendation ~om the Elk River Park and Recreation Commission that recommends that this Park Dedication Fee be increased per residential and multi-family dwelling unit based on the need for additional funds to provide recreation opportunities and based on the increased land value in the City of Elk River; and, WHEREAS, the Elk River Park and Recreation Commission recommends the Park Dedication Fee requirements for commercial property be increased based on the increased land value in the City of Elk River; and, WHEREAS, the adoption of this resolution adjusts the Park Dedication Fee for all residential dwelling units that was adopted in Resolution 92-122. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River that Park Dedication Fees paid to the City in heu of 10% of the undeveloped land shall be set at: Residential: ' $600flot or dwelling unit effective 1/1/96 $700/lot or dwelling unit effective 1/1/97 Commercial: $2,000 per acre effective 1/1/96 Passed and adopted by the CiW Council of the City of Elk River this 18th day of December, 1995. s:document:r esolution:p arkded3 ATTEST: Henry A. Duitsman, Mayor Sandra A. Thackeray, City Clerk Park Dedication Fees City Residential Commercial Industrial Trail Fees 10% of market 10% of market Andover 10% of market value value value N/A SFR = $700/unit, duplex = 3% of gross area 5% of gross area $574.00/unit, townhome = or negotiated cash or negotiated cash Anoka $687.00/unit fee fee N/A Apple Valley 10% 5% 5% varies $620-SFR unit, $530-Duplex, $460-townhome/quad, $390- Blaine MFR unit, $475-mobilehome $1860/acre $1630/acre N/A 10% fair market 10% fair market Brooklyn Park 10% fair market value of land value of land value of land none developer is responsible for SFR = $2,000.00/acre, Multi- all easements, Champlin family = $4,500.00/acre $6,750.00/acre $6,750.00/acre paths and trails SFR = $385/unit, Two Family + $326/unit, mobile home = $291/unit, townhome = $286/unit, apartment = Coon Rapids $238/unit $1152.00/acre $1152.00/acre N/A Maple Grove $805.00/unit $3150.00/acre $2250.O0/acre N/A Monticello 10% if raw land value N/A N/A N/A 10 of gross land 10 of gross land $125.00 per 10% of gross land area or area or 10% of fair area or 10% of fair home in $750.00 - $950.00 per dwelling market value of the market value of the residential Otsego unit undeveloped land undeveloped land subdivisions Developer is responsible-- some are not Rural = $600.00/unit, Urban = 5% of market value 5% of market value park dedication Ramsey $825.00/unit or $4300/acre min. or $2100/acre min. credit eligible Rogers $560.00/unit $1,800.00/acre $1,400.00/acre N/A non-city sewer = $1000.001acre, city sewer = ELK RIVER $500.00/unit $1500.001acre NIA N/A PROPOSED FEE $600.00/unit $2,000. O0/acre N/A N/A PLANFEES.XLS 12/13/95 Sheet2, Page 1 ITEM 5.15.e ity of iver MEMORANDUM TO: FROM: DATE: SUBJECT: Mayor and City Council Steven B. Ach, City Planner~~__~ December 18, 1995 Planning Fees Issue Consider adjusting planning apphcation fees. Overview On an annual basis, staff conducts a survey of surrounding and other similar developing communities to assess their fee structure as compared to Elk River's. When considering an increase in application fees, staff reviews the following: · How does Elk River's fees compare to the surrounding and similar communities? · Which apphcations generally demand the greatest amount of staff time to review, prepare reports and administer? The last time planning apphcation fees were adjusted was January of 1994. Since that time, it has become clear the applications which generally demand the greatest amount of staff time are: · Subdivisions (preliminary and final) · Conditional use permits · Site plan review Therefore, the fees for these apphcations are proposed to be increased as follows: Conditional use permit (commercial/industrial) Preliminary plat Site plan review 1995 Fee 1996 Fee $250.00 $300.00 $500.00 $500.00 + $5 perlot $200.00 $250.00 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 A special note should be made regarding the increase in preliminary plat fees. This fee is being adjusted to maintain a base fee; however, include a per lot fee. This is an attempt to try and make apphcation fees for preliminary plats proportional to the size of the actual development. Recommendation It is recommended the City Council approve amending the planning apphcation fees by adjusting the following apphcations: 1995 Fee Conditional use permit (commercial/industrial) $250.00 1996 Fee $300.00 Preliminary plat $500.00 $500.00 + $5 per lot Site plan review $200.00 $250.00 s:council:planfees APPIlCATION FEE SURVEY Contact Comp Plan Site Plan City Person Phone Amendment Rezoning Preliminary Plat Final Plat CUP Review Variance PUD Admin. Subdivision Other $60.00 + $20.00/acre + $100.00 + recording $80.00/Iot escrow $150.00 fees + $400.00 park (urban) or residential/S190.00 dedication fee for each $11.00/acre for David L. all fees paid $200.00 + $425.00/Iot commercial + recording $75.00 SFPJ $100.00 $150.00 + Plat fees + undeveloped lot less topo maps if Andover Carlberg 755-5100 . by developer recording fee escrow (rural) $20.00 fee $750.00 all others Recording fees than 20 acres requested Admin. Site Plan = none $125.00 + staff $50.00, 421-6630 ($150.00 $150.00 + costs & attorney $125.00 ($100.00 home $1000.00 escrow (unused $75.00-no plat, $150.00 Environmental Anoka Carolyn Braun ext. 165 proposed) $250.00 $2.00/Iot fees occupation permit) $125.00 $100.00 amount is returned) -platted permit = $75.00 $80 + $2.50/Iot Apple Valley Rick Kelley 953-2500 $365.00 $365.00 $365.00 over 10 lots $210.00 $80.00 $80.00 $1,050.00 $130.00 N/A $500.00 + ($5/Iot, $100.00 (R1 & R2), $100.00 (R1 & R2), Blaine Shawn Kaye 785-6183 $500.00 $300.00 $15/acre) $250.00 $250.00 (all others) $250.00 $250.00 (all others) N/A $250.00 N/A $950.00 - Brooklyn Park Howard Blin 493-8055 $500.00 $750.00 $1800.00 $0.00 $650.00 N/A $100.00 $650.00 $500.00 N/A concept = $200.00 + escrow (less than 10 acres = $500.00, 10 - 50 $300.00 + acres = $1,000.00, 50+ $300.00 Agricultural/Residential = acres = $1,500.00), escrow + $50.00, all others preliminary = $650.00 + conservancy Thomas $50.00/acre: $225.00 $200.00, annual review -- $20.00/acre, final = district permit = Champlin Pashkee 421-8100 adjust MUSA $575.00 +$10.00/Iot $100.00 $25.00 $550.00 $50.00 $100.00 $450.00 $50.00 Special Use Permit, Principal Use = $305.00 Concept = $245.00, $1000.00 deposit + $19.50 recording fee, Preliminary = $490.00, for landscaping. Temp. & Home Occ. = Final (per phase) = Townhome play $125.00 + $19.50 $125.00 + $19.50 $125.00/residential & structure fee = Coon Rapids Lee Starr 780-6460 $305.00 $305.00 $245.00 $125.00 recording fee $305.00 recording fee $245.00/commercial $125.00 $250.00/unit PLANFEES.XLS 12/13/'95 page 1 APPLICATION FEE SURVEY Contact Comp Plan Site Plan City Person Phone Amendment Rezoning Preliminary Plat Final Plat CUP Review Variance PUD Admin. Subdivision Other R-A & R-1 = $100.00 + $20.00/acre + escrow. All concept plan = $250.00 + $100.00 or $250.00 if Park Dedication others = $250.00 + $20/acre, development street easement or fees subject to $200.00 + $5.00/Iot + $100.00 + $250.00 + plan = $200.00 + vacation is processed change in February Maple Grove Alan Madsen 494-6040 $200.00 $20.00 + escrow escrow escrow $200.00 + escrow escrow $50.00 $5.00/acre as part of the same 1996 $250.00 + $300.00 + consultant $250.00 + $100.00/acre for considering a tree fees if over consultant fees first 10 acres, setback = $50.00, all dedication fee of Monticello Jeff O'Neill 295-2711 $250.00 if over $250.00 then $25.00/acre $0.00 $125.00 $0.00 others = $125.00 $125.00 $50.00 $250.00/Iot Five or less lots = $150.00 + SFR = $200.00 + SFR = $200.00 + $1,000.00 $300.00 escrow, other = $300.00 escrow, $150.00 + $500.00 escrow, six or $200.00 + $500.00 other -- $200.00 + escrow, 1 per 40 = $150.00 + more lots = escrow, appeals = $500.00 escrow, $200.00, 1 per 40 $500.00 $150.00 + $150.00 + $150.00 + $200.00 appeals = $150.00 + (transfer) = $200.00 + Otsego Elaine Beatty 441-4414 escrow $500.00 escrow $2,500.00 escrow N/A escrow N/A $200.00 escrow N/A $300.00 escrow N/A $75.00 + $75.00 + costs $75.00 + costs costs incurred in incurred in incurred in $75.00 + costs processing processing $75.00 + costs incurred processing incurred in $75.00 + costs incurred in $75.00 + costs incurred through through in processing through through processing through processing through in processing through Ramsey Sylvia Frolik 427-1z10 no charge Recording Recording N/A Recording Recording Recording Recording Recording N/A Home occ. = $75.00, zoning ordinance $100.00/Iot renewals = $25.00, all (text amendment) Rogers Gary Eitel 428-2253 $500.00 $500.00 ($300.00 min.) $100.00 others = $100.00 $200.00 $200.00 N/A N/A = $100.00 residential = $100.00, comm./ind. = $250.00, ELK RIVER Steve Ach 441-4902 $300.00 $250.00 $500.00 no fee amend. = $75.00 $200.00 $150.00 no fee $150.00 N/A PROPOSED $500.00 + FEE N/A N/A $5.00/Iot N/A commJind. = $300.00 $250.00 N/A NIA N/A NIA PLANFEES.XLS 12/13/95 page 2 t?EM 5.15.f ,ity of iver TO: FROM: DATE: SUBJECT: MEMORANDUM Mayor and City Council Sandra Thackeray December 18, 1995 1996 Administrative Fees Fees for services are based on the direct cost of administration and enforcement for the licensed service. The city annually reviews its fees to ensure that the cost of administration and enforcement are covered and to see how the fees compare with surrounding communities of similar size. The recommendation for the fo]lowing fee increases is based on the cost of administration and the average fees being charged by metropohtan municipalities for cities of 10,000 - 20,000 population. Listed below are the current administrative fees with the recommended increases. ADMINISTRATION FEES Bowling Alley License $70.00 No Cha~ge Residen~i~ SPe~ B~g pe~ : iN, Fee:::: $I0~00 Ho~ NoFee C~ette Li~nse :Db~ ::~i~e $25 No Cha.ge Kennel Li~nse $75.00 No Liquor On-S~e Li~nse $4,000 No Sunday On-S~e $200 No Non-Into~c~ting Off-S~e ~eer~ $75 No ine Tem~o~ ~oa-into~tiag on-s~e $20/da~ ~o Tempora~ into~ting on-s~e $20/day No Change O/~S~e Li~U°r InV~ati°n ~ (C0~ti0n} N0 ~250 ,,. Mechani~ Amuzement Li~nae $35 [ devi~ The~pentic Maaa~e Eatabliahment $200 ~o Change The~peutic Maaa~e Eatab. Co~/Pa~ne~hip $300 The~peutic Maas~e Therapiat $150 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 * The average fee for wine licenses was much higher than what the city is currently paying. In this case, the City is recommending a below average increase so as not to dramatically raise the fee in one year. ACTION RECOMMENDED: Council action to adopt the changes highlighted in the fees for services chart for. 1996. s:\councflkfeesadmn.doc