Loading...
4. SPSR 11-03-2009Wd SbESE 6002/8Z/Oi '6nnp deW uoi~e~o~~auo~swa~ SZ-60 fly\dfl~\sa~ld ase~~9NINNV~d\ 5 y Gemstone Products Company Elk River EAW 10-26-09 Schulze Property ~ ~ .~ ~ - _ 4410.4300 Subpart 12 (B) Development of a facility for the extraction or mining of sand, gravel, stone, or other nonmetallic minerals, other than peat, which will excavate 40 or more acres of land to a mean depth often feet or more during its existence, local governmental unit. 5. Project Location County: Sherburne City /Township: Elk River / Livonia Parcel 2: The Southeast Quarter of the Northeast Quarter (SE'/4 of NE 1/4), lying West of Baldwin Street, in Township Thirty-three (33) North, of Range Twenty-six (26) West, Sherburne County, Minnesota; Parcel 7: Southwest Quarter of the Northeast Quarter (SW t/4 of NE '/4) lying Northwesterly of the centerline of Baldwin Street and that part of the Southeast Quarter of the Northwest Quarter, lying Easterly of the Easterly line of Trunk Highway 169 (formerly known as Minnesota State Highway 18 or Elk River and Princeton Wagon Road or Princeton Road), all in Section 3, Township 33, Range 26, Sherburne County, Minnesota. 1. Description a. Provide a project summary of 50 words or less to be published in the EQB Monitor. Gemstone Products Company proposes to operate a sand and gravel mine along with an aggregate crushing and washing plant to provide construction aggregates for the north metro market. The facility will be located in the city of Elk River on the east side of TH 169, at 225tH Avenue. b. Give a complete description of the proposed project and related new construction. Attach additional sheets as necessary. Emphasize construction, operation methods and features that will cause physical manipulation of the environment or will produce wastes. Include modifications to existing equipment or industrial processes and significant demolition, removal or remodeling of existing structures. Indicate the timing and duration of construction activities. Gemstone is proposing to open a new aggregate mine. Mining operations and practices on the property are proposed to be similar to current -3- Final uses of this property will depend on end-use plans that are yet to be determined. Currently, the property within the City of Elk River is designated as Commercial Reserve Transition. In all likelihood, much of this property will be suitable to be developed as both residential and light commercial as mining ceases. e. Is this project a subsequent stage of an earlier project? _Yes X No If yes, briefly describe the past development, timeline and any past environmental review. 7. Project Magnitude Data Total project acreage: 62.9 acres Number of residential units: unattached 0 attached 0 maximum units per building 0 Commercial, industrial or institutional building area (gross floor space): 12,000 sQ. ft. Indicate areas of specific uses (in square feet): Office 1,000 Manufacturing 0 Retail 0 Other industrial 0 Warehouse 0 Institutional 0 Light industrial 0 Agricultural 0 Other commercial (specify) 0 Building height If over 2 stories, compare to heights of nearby buildings: n/a 8. Permits and approvals required List all known local, state and federal permits, approvals and financial assistance for the project. Include modifications of any existing permits, governmental review of plans and all direct and indirect forms of public financial assistance including bond guarantees, Tax Increment Financing and infrastructure. All of these final decisions are prohibited until all appropriate environmental review has been completed. See Minnesota Rules, Chapter 4410.3100. Table 8.1 Permits and Annrovals Required Unit of Government T e of A lication Status MPCA NPDES Storm Water Permit To Be Obtained MPCA Air Permit To Be Obtained MN DNR Water A ro riation To Be Obtained Cit of Elk River Minin Permit To Be Obtained Cit of Elk River Re-zone Property as Mining District To Be A lied For Cit of Elk River Conditional Use Permit To Be A lied For -5- b. Are any state-listed (endangered, threatened or special concern) species, rare plant communities or other sensitive ecological resources on or near the site? X Yes _No If yes, describe the resource and how it would be affected by the project. Describe any measures that will be taken to minimize or avoid adverse impacts. The Minnesota Department of Natural Resources was consulted if any rare species or other significant natural features are known to occur within the approximate one-mile radius of the proposed project. There is record of Blanding's Turtle (Emydoidea blandingii), astate-listed threatened species, in the area, though they have not been observed on the property. The Blanding Turtle is astate threatened species and is declining in most of their range. There will likely be no impacts of the species on this property due to the fact that there are no wetlands in or near the mining area. Provide the license agreement number LA-n/a and/or Division of Ecological Resources contact number (ERDB: 20090142) from which the data were obtained and attach the response letter from the DNR Division of Ecological Resources. 12. Physical impacts on water resources Will the project involve the physical or hydrologic alteration -dredging, filling, stream diversion, outfall structure, diking, and impoundment - of any surface waters such as a lake, pond, wetland, stream or drainage ditch? _Yes X No If yes, identify water resource affected and give the DNR Public Waters Inventory number(s) if the water resources affected are on the PWI: Describe alternatives considered and proposed mitigation measures to minimize impacts. 13. Water Use Will the project involve installation or abandonment of any water wells, connection to or changes in any public water supply or appropriation of any ground or surface water (including dewatering)? _Yes _X No If yes, as applicable, give location and purpose of any new wells; public supply affected, changes to be made, and water quantities to be used; the source, duration, quantity and purpose of any appropriations; and unique well numbers and DNR appropriation permit numbers, if known. Identify any existing and new wells on the site map. If there are no wells known on site, explain methodology used to determine. 14. Water-related land use management district -7- b. Identify routes and receiving water bodies for runoff from the site; include major downstream water bodies as well as the immediate receiving waters. Estimate impact runoff on the quality of receiving waters. The settling ponds will be located at the lowest lying area of the property, thus water will be directed towards this area. 18. Water quality: wastewaters a. Describe sources, composition and quantities of all sanitary, municipal and industrial wastewater produced or treated at the site. • On-site sanitation facilities will include portable toilets. • Water from the wash plant used to rinse sand and gravel will carry clays, sediments, and other fine organic particles. This water will be piped into the series of settling ponds where the "fines" are allowed to settle out. The clean water is then pumped into the wash plant for reuse. Periodically, the ponds will need to be cleaned of the soil build-up to maintain their effectiveness. Wash plant water will not contain chemical additives. b. Describe waste treatment methods or pollution prevention efforts and give estimates of composition after treatment. Identify receiving waters, including major downstream water bodies (identifying any impaired waters), and estimate the discharge impact on the quality of receiving waters. If the project involves on-site sewage systems, discuss the suitability of site conditions for such systems. Through the closed loop pond system, the wash plant water will be recycled for re-use. c. If wastes will be discharged into a publicly owned treatment facility, identify the facility, describe any pretreatment provisions and discuss the facility's ability to handle the volume and composition of wastes, identifying any improvements necessary. N/A 19. Geologic hazards and soil conditions a. Approximate depth (in feet) to ground water: Groundwater exists at approximately the 970 ft. contour. Describe any of the following geologic site hazards to ground water and also identify them on the site map: sinkholes, shallow limestone formations or karst conditions. -9- 21. Traffic Parking spaces added: Up to 12 spaces added for employee parking and potentially 6 spaces for overnight parking for dump trucks Existing spaces (if project involves expansion): None Estimated total average daily traffic generated: During typical operating season (normally April through November), the estimated total daily traffic is anticipated to be 100 truck loads per day (200 truck trips). Estimated maximum peak hour traffic generated and time of occurrence: Peak traffic typically occurs in the morning with up to 15 loads per hour (30 truck trips). Indicate source of trip generation rates used in the estimates. Most trucking will be destined for nearby Gemstone ready-mixed concrete plants. 22. Vehicle-related air emissions Estimate the effect of the project's traffic generation on air quality, including carbon monoxide levels. Discuss the effect of traffic improvements or other mitigation measures on air quality impacts. Vehicle-related air emissions are comprised of emissions from employee vehicles, loaders, and excavation equipment. These emissions contain carbon monoxide, hydrocarbons, and particulate matter. The site is not expected to have an adverse impact on air quality. 23. Stationary source air emissions Describe the type, sources, quantities and compositions of any emissions from. stationary sources of air emissions such as boilers, exhaust stacks or fugitive dust sources. Include any hazardous air pollutants (consult EAW Guidelines for a listing) and any greenhouse gases (such as carbon dioxide, methane, nitrous oxide) and ozone-depleting chemicals (chloro-fluorocarbons, hydrofluorocarbons, perfluorocarbons or sulfur hexafluoride). Also describe any proposed pollution prevention techniques and proposed air pollution control devices. Describe the impacts on air quality. The crushing plant will create air emissions from both the generator required to power the crushing plant and from the crushing activity itself. An air emissions permit will be obtained for operation of the processing equipment. The wash plant will also create emissions from the generator used to power the plant. The process of washing the aggregates does not produce dust. The site will generate -11- This property will present various visual impacts during the operation of the mine. These visual impacts consist of changing land cover, excavation equipment, aggregate processing equipment such as conveyors, crushing and washing equipment, lighting, stockpiles of aggregates, truck traffic, emission plumes, and dust. These impacts may be considerably mitigated by the construction of berms and vegetative plantings. 27. Compatibility with plans and land use regulations Is the project subject to an adopted local comprehensive plan, land use plan or regulation, or other applicable land use, water, or resource management plan of a local, regional, state or federal agency? X Yes _No. If yes, describe the plan, discuss its compatibility with the project and explain how any conflicts will be resolved. If no, explain. The site is subject to Elk River City ordinances. The property is not currently in the Elk River Mineral Excavation Zoning District; therefore, a zone change will need to be applied for. 28. Impact on infrastructure and public services Will new or expanded utilities, roads, other infrastructure or public services be required to serve the project? _Yes X No. If yes, describe the new or additional infrastructure or services needed. (Note: any infrastructure that is a connected action with respect to the project must be assessed in the EAW; see EAW Guidelines for details.) 29. Cumulative potential effects Minnesota Rule part 4410.1700, subpart 7, item B requires that the RGU consider the "cumulative potential effects of related or anticipated future projects" when determining the need for an environmental impact statement. Identify any past, present or reasonably foreseeable future projects that may interact with the project described in this EAW in such a way as to cause cumulative potential effects. (Such future projects would be those that are actually planned or for which a basis of expectation has been laid.) Describe the nature of the cumulative potential effects and summarize any other available information relevant to determining whether there is potential for significant environmental effects due to these cumulative effects (or discuss each ca~mulative potential effect under appropriate item(s) elsewhere on this form). It is understood that the northern border of the property is adjacent to another potential mine operator, Max Steininger, Inc. Steininger is currently permitting -13- I herby certify that: • The information contained in this document is accurate and complete to to the best of my knowledge. • The EAW describes the complete project; there are no other projects, stages or components other than those described in this document, which are related to the project as connected actions or phased actions, as defined at Minnesota Rules, parts 4410.0200, subparts 9b and 60, respectively. • Copies of this EAW are being sent to the entire EQB distribution list. Signature ~~ ~" ~ ~,, ~ Date 1~° 1`J.~ 1 ~' `'' Title ~ V, ~ ~,~ ,,,r,-, ~,.~ ~%`"1 ~.,,, ~,.~ -15- ---- __ I ~ ~ '~ Z ~ ~ e € ~ -~-coo = ! a ~ y ~ 3 ~ rv ~ $~ 5H _ ~ ~ ~ ~ ~ ~ N N e N i « r~ x - -~~ - -, a . - 9 ~ ~ ... _. ,~ 111 ~ I ~~~ I ~ ~ . - ,.. ,. II k o `~ ~ ~ 5 _ ~j 0 ~ , ~- ~ ~ ~O ~. ~ - . . _. ~. ~_. x~ °.~ F ~~ '. ~ ~. .. I Z °~ ~~ e ` i .. .. a 5 I ~ I e • \ j >- i _E I ,. ~ e~ $ , t ~ a s' \ 5 ~, ` ~ ... $ -. ~ - rc s ~ ~-- '6' a ~ __ ~F ~- ~ ~ ~ ~~ i ~o .§ ~ g ~ ~¢r .~ ~. _ _ .. _.! .. b6 .®.. _.. INI / o ry .. r ~. ,~ (I// i ^ ~ .~ a• e ,;~ 0 e .p ~ ._.. e _ r'//~ s e _ °s,. °" _ am ~$ _.. s Jl _ ~ . e ~_ 3~~ _' `s - g $' ~ ~ ~ a. - - ~- _ L -- _ ~ - - ~~ " ~~ _~ n ~ '~._. ~ L ~ _... w _ _. _ _ _._ __- ~ I $ ~ e ~ ~ ~-o = a 3E ~ ~ ~ ~~ ~ ~ i ~ i ~ ~ C ~ ~ ~ a ~ e\ ca ~ ~ ~ ~ \ ~ \\ \ Q I ~ N ~. ~ O I N lel +~ ~ ~ I~ °- I rn c ~ ~ u o ~ a ~ I ~I 9 - ~_ - ~ ss ~ N ~ ~ ~ _,w~H ~s n - -- - - - - - 3 I! ~ ~ > y ~_ ! rs ; fr m 8a i~ ~ r ~ ~ :~\ ~ //~l ~~ \~ ~~~~ ~ '/rte ~~~ w ~~ \~ ~ l/ l// l; 11 bC6~~~~~~~~~~~ ~~~\~~~~~ _ _ ~ ._ - ~~~~_ III \ -' _ _ -'~ ~ ~~ \ ~ ~~~ \ ~~~ I I/ll. L \\\\\\\\ `\ \\ \\ 1\ _ . ` `~~1~111 \I'Ii11 ;'li' II'I' \ ,, \ \ \ \ \ \ \ \ \ (~~1 1111 1111 III;'p;l.~l ,'\ '`\`\\\ ~ `' \\ \\ \\ \\ \_-`...,1111, iiii IIII:IIII,III I \ \ \ \ \ \ \ \ \ _ _ 1111 11 I I I';I'I; I;I I\\\ \ \ \ \ \\ \ \ \------I Ili IIII~~I~~Ilill! \ . \ \ \ \ \-------~ I .1111 I I'lll ~ \\\\\ ,\\\\\ \\ ~ \\ \---------~ j IIIIIIIIIjllljll \ \ \ \ \\\\ \ \----------~ IIIIIIII~I~IIIIII,~ I I ~~\~ \\\\\ ~\\\ \\ - _ - _ - .,. JIII~~II III 1~II71 I ~ I \\ ,,\~\\ \ ,, ~ ~ (~ //11j1111111111111 a \ \ \ \\ \ ' \ ~ \ ///J I I I'I II III \\\, \\\\\.,.\\~\ ~,,~7~///~Illljljijll;lll Q \ \\\\ .\\ \\\' \ \ \\ ~,'~ j7 j////JIIIIIIIII'llll h ~\ \\\ '~\\\ \ \\\ \\\. ~~ / //// ///lhjlllllllj I ~ I %/ //// //// /III I j\ \\\\\ \\\\\ \\\~\,\ ~~~ //////'//// //L.Ilpllll II\,\\ \\\ \\\\' \\\\ \\~~ //////'//// /~j111111111g VIII\\\\\\\\\\,`~\\\\\'\\\\\',\\ j/~//~~ij%~i~/j%%j~~~j' I I 011\\\ \\\\'\\\\`` \ \~~1~(\~l~/1%(\l (//(l~\`,\\\ I I VIII ~\\ \ \ ,~\ \\ \ ~ ~~-` _ ~\\~~ \\\ \\\ \\\\\~ \\\\`\\ IIII~,VA\\. A_ - _ ~V\ V A\\ ,~ J\\\\\\\\ \\\ \. - ~ 69 L~_.~MH S n - --__ _ 6Mp•(aiuued ~oOA-g) 6ydw6odoy 6ui~six3 LOOZ/6L/£ ---- ~, '~ ``- ~