Loading...
6. SR 06-26-1995ITEM 6. June 22, 1995 43ULTINUEN619EER5 File: 230-271-10 1326 Energy Park give sr- Paul, MN sloe Honorable Mayor and City Council 612544-4389 City of Elk River 1-800-888.2923 13065 Orono Parkway Fax: 612-644-9446 P.O. Box 490 Elk River, MN 55330 RE: 1995 OVERLAY PROJECTS PUBLIC HEARING Deaz Council Members: As you are aware, the public hearing for the 1995 Overlay Improvement project is scheduled for the June 26, 1995, City Council meeting. The areas to be overlaid aze Greenhead Acres 1st, 2nd, and 3rd Additions, Country Side Acres, and the Avon Acres CMLENGINEERINCa Area. As you recall from the feasibility study, the project is proposed to be 100% assessed ENmaoNMRNTA` to the benefitting property owners at a rate of $1,505 per unit. MUNICIPAL PIA""'NO I will have a handout prepazed for the public hearing which will detail the project and the uownsTE assessment procedure. I will also be prepared after the presentation to answer any RucTURAL questons that the public may have. As you will recall from the project schedule, after the suevenrrG closure of the public hearing, if the Council decides to move forwazd with this project, the reAPElc next step would be to order the improvement and authorize the advertisement for bids. TRANSPORTATION Attached for your consideration are two draft resolutions which would initiate the next step. ELECTRICAL/MECHANICAL ENGINEER,"O, If you have any questions regarding this project, please call. HVAC POWER DISTRIBUTION Sincerely, scnoa svsTEMCONTROLS GI NEERS MSA, CONSULTI G EN N ~ ~ ~~Ll~/`~~GGCLCGC/ Terry J. Maurer, P.E. TJM:tw Enclosure OPFICESIN: T71-2230jun MINNEAPOLIS ~IOR IAKE eT. PAUL WASECA RESOLUTION 95 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ORDERING THE IMPROVEMENT IN THE MATTER OF THE 1995 BITUMINOUS OVERLAY IMPROVEMENT VL'FIEREAS a public hearing relating to the 1995 Bituminous Overlay improvement was held before the Elk River City Council after ten days mailed notice and two weeks published notice of the hearing was given; and WHEREAS the City Council has duly considered the Feasibility Report and those matters presented at the public hearing by those persons desiring to be heard on the matter, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The 1995 Bituminous Overlay improvement is hereby ordered as recommended in the Fusibility Report dated May 31, 1995. Passed and adopted this 26th day of June, 1995. Henry A. Duitsman, Mayor ATTEST: Sandra A. Thackeray, City Clerk • RESOLUTION 95 - • A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION APPROVING THE PLANS AND SPECIFICATIONS AND ORDERING THE ADVERTISEMENT FOR BIDS IN THE MATTER OF THE 1995 BITUMINOUS OVERLAY IMPROVEMENT WHEREAS pursuant to Resolution 95-29, the Project Engineer has prepared plans and specifications for the 1995 Bituminous Overlay improvement, which plans and specifications have been reviewed by the City; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. Such plans and specifications, a copy of which is attached hereto and incorporated herein by this reference, are hereby approved. 2. The City Administrator shall prepare and obtain the publication of an advertisement for bids for the making of the improvement pursuant to the attached plans and specifications. The advertisement shall be published once each week for three consecutive weeks, shall specify the work to be done, and shall state that the bids will be received by the City • Administrator until 10:00 a.m. on July 19, 1995, at which time the bids will be publicly opened in the Council chambers of the City Hall by the City Administrator and the Project Engineer and will then be tabulated for consideration by the City Council at a meeting thereof at 7:00 o'clock p.m. on July 24, 1995, in the City Council chambers at City Hall. No bids will be considered unless sealed and filed with the City Administrator and accompanied by a cash deposit, cashier's check, bid bond, or certified check payable to the City Administrator in the amount of 5 % of the amount of such bid. Passed and adopted this 26th day of June, 1995. Henry A. Duitsman, Mayor ATTEST: Sandra Thackeray, City Clerk e 230/265-2221.jun June 22, 1995 • Steve and Cheryl Zimmerman 21628 Vernon St. NW Elk River, MN 55330 Dear Mayor and City Council, We will be out of town on the 26th of June and therefore are writing to express our concerns on the proposed overlay improvements in our neighborhood. Our residence is on lot 2, block 1, Greenhead Acres 3rd addition. The general condition of Vernon Street is pretty good. There aze a few small azeas starting to break up, which some good quality patching would ensure another 5 yeazs of maintenance free road for the city and its tax payers. We just don't have the volume of traffic to justify resurfacing the entire street. We have been residents of Elk River for 23 yeazs and have seen our taxes leaping every year. I have seen the city discourage too many business prospectives that would have lessened the tax burden, or at least supported our school system. We've reached the extent of our ability to pay any higher taxes and relocation may become an unfortunate possibility. • Thank you for the opportunity to express our feelings. Steve and Cheryl Zimmerman • ~n~sr~~.+~eraraxc PUBLIC HEARING FOR e a cuY or El River 1995 OVERLAY IMPROVEMENTS JUNE 26,1995 2sonn-uoz.;~~ LEGEND ~ BITUMINOUS OVERLAY PROPOSED A55ESSMENT AREA ER271EX1 PROPOSED BITUMINOUS OVERLAY AND ~s ~~ ASSESSMENT AREA 1 City of Elk •~r 0 ® 600 ~ i ~~a~ o ~`~ ER277EX2 h( PROPOSED BITUMINOUS OVERLAY AND ASSESSMENT AREA 0 "' 400 _ BITUMINOUS Elk •~~ C~~a~ o ~4 ~~ ~~~ ~~ J~ G~ ~~ o ® 400 ~~ \~ 0 ~o D VINOUS OVERLAY ER27tEX2 m~ PROPOSED BITUMINOUS OVERLAY AND ASSESSMENT AREA 'CSED ASSESSMENT L; AREA r City of Elk •~r ~W WD ~ ~~ Z V 6 Y O 2 Q 0 ® 600 I I ER 271EX7 M~ PROPOSED BffUMINOUS OVERLAY AND ~~ ASSESSMENT AREA LEGEND ~ BITUMINOUS OVERLAY ROAD IMPROVEMENTS U PROPOSED ASSESSMENT r ~ C~~{G~l~ ~ ~4 City of Elk •~r • r i{ city of El River 1995 OVERLAY IlVIPROVEMENTS ESTIlVIATED COSTS ~assnatrs ersis~ss Construction Cost $260,000 Overhead (10%) 26 000 TOTAL PROJECT COST $286,000 ESTIMATED ASSESSMENT RATE Based on 100 % assessment, the estimated rate is $1,505/unit. Naomi-zeaz.~uo ASSESSMENT SCHEDULE Constant Principal Payment Method Project: SParcel: Owner: 1995 OVERLAY IMPROVEMENTS Interest Start Date: Repayment Period: Interest Rate: Assessments: a.OVERLAY IMPROVEMENTS 01-Oct-95 3 years 8.00% LOT BLOCK Quantity Unit Measure Unit Price Amount 1 UNIT 1505.00 $1,505.00 Total Assessment $1,505.00 YEAR ANNUAL PAYMENT PRINCIPAL INTEREST PRINCIPAL PAYMENT PAYMENT REMAINING 1995 $0 .00 $0.00 1,505. 00 1996 $652.41 $501 .67 $150.75 $1,D03. 33 1997 $581.93 $501 .67 $80.27 $501. 67 1998 $541.80 $501 .67 $40.13 $0. 00 $1,776.15 =Total of Annual Payments • NOTE: Prepayment of entire assessment amount may be made to the City of Elk River any time before NOVEMBER 30, 1995 without interest. 06/26/95 ASSESSMENT SCHEDULE Constant Principal Payment Method Project: • Parcel: Owner: 1995 OVERLAY IMPROVEMENTS Interest Start Date: Repayment Period: Interest Rate: Assessments: a. OVERLAY IMPROVEMENTS 01-Oct-95 5 years 8.00% LOT BLOCK Quantity Unit Measure Unit Price Amount 1 UNIT 1505.00 $1,505.00 Total Assessment $1,505.00 YEAR ANNUAL PAYMENT PRINCIPAL INTEREST PRINCIPAL PAYMENT PAYMENT REMAINING 1995 $0 .00 $0. 00 $1,505. 00 1996 $451.75 $301 .00 $150. 75 $1,204. 00 1997 $397.32 $301 .00 $96. 32 $903. 00 1998 $373.24 $301 .00 $72. 24 $602. 00 1999 $349.16 $301 .00 $48. 16 $301. 00 2000 $325.08 $301 .00 $24. 08 $0. 00 • $1,896.55 =Total of Annual Payments NOTE: Prepayment of entire assessment amount may be made to the City of Elk River any time before NOVEMBER 30, 1995 without interest. 06/26/95 THE COST OF ATIMELY' MAINTENANCE From "THE HOLE STORY....FACTS AND FALLICIES OF POTHOLES" American Public Works Association, 1983 409 DROP IN QUALITY 75% TIME PSR VERY GOOD Eoch $1.00 .......... .............................. ....... of Renovation ............... . GOOD cost here FAIR III cost $4.00 to $5.00 if ........... .:...........................................:. . '~ ~ ~ Delayed until POOR 40~ DROP IN here QUALITY ' ., TOTAL FAILURE VERY POOR 12% TIME YEARS OF SERVICE The Advantage of Doing Timely Maintenance ER271EX4 hl PAVEMENT STRENGTH VERSUS YEARS OF SERVICE t city of Elk 'ver • CUdS[L~t96 flTGIYI~IIS r -~ c;~Y or El River 1995 OVERLAY IlVIPROVEMENTS PROJECT SCHEDULE • Receive Feasibility Study, Order Public Hearing, and Order Plans and Specifications Hold Public Hearing, Order Project, Approve Plans and Specifications, and Advertise for Bids Open Bids Receive Bids, Establish Amount to be Assessed, and Set Assessment Hearing Date Hold Assessment Hearing and Award Contract Begin Construction Complete Construction June 5, 1995 June 26, 1995 July 19, 1995 July 24, 1995 August 21, 1995 September 1995 October 1995 230/271-2602.jun J-lN Y ~ ~ ~u}~~ ~~} 1~i~iC ,. f 0 a ~ l u~ ~`Q ~' c l~ ~ r+~ P f~~' ~ - 1~> ~ ~~ t c s }~ a v, ~i . J 4 .. YY1 ~ S e i -i- C. a ~ t~ v ~- ~ ~ E _ c== r -~ 1~ ~ s.. ,, \ L~ rG v, W ~~-~` C',~~r 'E'ccv ~cS~d ` v~ Q~'~hhea~ QC r~e ~ ~J e ~ c F ~- o i-c~ S 1 ~ cz J c. , r~ s-1- .. S~e~nd,v. ~ ZCpS ~ ~U~ ~r. C'oa ~1'IC~.Y'e~~ __. .. _.___ i ~_ ___ .. ~ C ~' e v~ `y ~c1..t b ~ t wyD soli ,. ~2-to3c:~ ZIZ~~ ~~ ll~. 1 q6 a ~' ~ ~~ ~..~ e r ~Q .nor ~ ~ - l n, _ ,. ~ . ~_ 1 c