ITEM 4.1.
RE: MAIN STREET/EVANS AVENUE STORM SEWER IMPROVEMENTS
CONSTRUCTION BIDS
CIVIL ENGINEERING
ENVIRONMENTAL
MUNICIPAL
PIANNING
LID WASTE
RucruRAL
SURVEYING
TRAFFIC
TRANSCORTanoN
ELEQRICAL/MECHANICAL
ENGINEERING:
Hvac
POWER DISTRIBUTION
scnDA
SYSTEM CONTROLS
OFFICES IN:
MINNEAPOLIS
~RIOR IAKE
ST. PAUL
Dear Mr. Klaers:
We have tabulated the bids received by the City on June 8, 1995, for the Main Street and
Evans Avenue Storm Sewer Improvement project. There were a total of five bidders. The
following table provides a list of the bidders and their total bid.
Barbarossa and Sons $370,991.85
R. L. Lazson Excavating 395,015.20
Bonine Excavation, Inc. 399,007.00
Northdale Construction 455,677.66
Latour Construction 504,911.35
As you recall, approximately two years ago a report was prepared regarding several storm
drainage issues within the City. In that report, we had initially estimated the cost of these
improvements, approximately $100,000 below the lowest bid submitted by Barbarossa and
Sons. Since that report, a number of things have changed which have caused the cost to
escalate. One major item is the need to remove, reinstall, and lengthen the culvert under
the UPA driveway access to TH .169. The total cost of this work adds approximately
$25,000 to the project. Other issues include a sanitary sewer line needed on Main Street
because the storm sewer interfere with existing building services and the realigning of the
storm sewer pipe and reconstnTCting the ditch along property lines in an effort to make the
properties belonging to Dr. Johnson and Earl Hohlen more developable in the future.
These items add approximately $50,000 to the total project cost.
As you are aware, Barbarossa and Sons is the Contractor who is currently working on the
Western Area Phase II improvements. They have successfully completed projects very
similar to this Main Street and Evans Avenue Storm Sewer project. Therefore, we would
recommend award to them as the lowest responsible bidder in the amount of $370,991.85.
Attached for the City Council's consideration is a draft resolution which accomplishes this
award.
WASECA
Mr. Pat Klaers
June 22, 1995
• Page Two
If you have any questions regarding this, I will be in attendance at your Tune 26, 1995,
City Council meeting.
Sincerely,
MSA, CONSULTING ENGINEERS
Terry J. Maurer, P.E.
TJM:tw
Attachment
265-2205.jun
•
r1
~J
RESOLUTION -
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION ACCEPTING BID AND AUTHORIZING
EXECUTION OF CONTRACT IN THE MATTER OF THE
MAIN STREET/EVANS AVENUE INTERSECTION
DRAINAGE IMPROVEMENT OF 1995
WHEREAS pursuant to Resolution 95-26, competitive bids were solicited and received for the
Main Street/Evans Avenue Intersection Drainage improvement as set forth in the
bid tabulation attached hereto and incorporated herein by this reference; and
WHEREAS the City Council has considered the amount of the bids and the responsibility of the
bidders and determined that Barbarossa and Sons, Inc., is the lowest responsible
bidder;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River,
Minnesota:
1. The Mayor and City Administrator are authorized and directed to execute, on behalf of the
• City, such contract with Barbarossa and Sons, Inc., as is approved by the Ciry Attorney
for the completion of the Main Street/Evans Avenue Intersection Drainage improvement
according to the approved plans and specifications designated in Resolution 95-26.
2. The City Administrator is authorized and directed to forthwith return to all bidders the
deposits made with their bids upon execution of the contract above specified.
Passed and adopted this 26th day of June, 1995.
Henry A. Duitsman, Mayor
ATTEST:
Sandra A. Thackeray, City Clerk
•
230/265-2221.jun