Loading...
4.1. SR 06-26-199511S ENEINEERS 1326 Energy Park Drive St. Paul, MN 55108 612644 4369 1-800-886-2923 Faa:612-6449445 June 22, 1995 File: 230-265-30 Mr. Pat Klaers City Administrator City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 ITEM 4.1. RE: MAIN STREET/EVANS AVENUE STORM SEWER IMPROVEMENTS CONSTRUCTION BIDS CIVIL ENGINEERING ENVIRONMENTAL MUNICIPAL PIANNING LID WASTE RucruRAL SURVEYING TRAFFIC TRANSCORTanoN ELEQRICAL/MECHANICAL ENGINEERING: Hvac POWER DISTRIBUTION scnDA SYSTEM CONTROLS OFFICES IN: MINNEAPOLIS ~RIOR IAKE ST. PAUL Dear Mr. Klaers: We have tabulated the bids received by the City on June 8, 1995, for the Main Street and Evans Avenue Storm Sewer Improvement project. There were a total of five bidders. The following table provides a list of the bidders and their total bid. Barbarossa and Sons $370,991.85 R. L. Lazson Excavating 395,015.20 Bonine Excavation, Inc. 399,007.00 Northdale Construction 455,677.66 Latour Construction 504,911.35 As you recall, approximately two years ago a report was prepared regarding several storm drainage issues within the City. In that report, we had initially estimated the cost of these improvements, approximately $100,000 below the lowest bid submitted by Barbarossa and Sons. Since that report, a number of things have changed which have caused the cost to escalate. One major item is the need to remove, reinstall, and lengthen the culvert under the UPA driveway access to TH .169. The total cost of this work adds approximately $25,000 to the project. Other issues include a sanitary sewer line needed on Main Street because the storm sewer interfere with existing building services and the realigning of the storm sewer pipe and reconstnTCting the ditch along property lines in an effort to make the properties belonging to Dr. Johnson and Earl Hohlen more developable in the future. These items add approximately $50,000 to the total project cost. As you are aware, Barbarossa and Sons is the Contractor who is currently working on the Western Area Phase II improvements. They have successfully completed projects very similar to this Main Street and Evans Avenue Storm Sewer project. Therefore, we would recommend award to them as the lowest responsible bidder in the amount of $370,991.85. Attached for the City Council's consideration is a draft resolution which accomplishes this award. WASECA Mr. Pat Klaers June 22, 1995 • Page Two If you have any questions regarding this, I will be in attendance at your Tune 26, 1995, City Council meeting. Sincerely, MSA, CONSULTING ENGINEERS Terry J. Maurer, P.E. TJM:tw Attachment 265-2205.jun • r1 ~J RESOLUTION - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MATTER OF THE MAIN STREET/EVANS AVENUE INTERSECTION DRAINAGE IMPROVEMENT OF 1995 WHEREAS pursuant to Resolution 95-26, competitive bids were solicited and received for the Main Street/Evans Avenue Intersection Drainage improvement as set forth in the bid tabulation attached hereto and incorporated herein by this reference; and WHEREAS the City Council has considered the amount of the bids and the responsibility of the bidders and determined that Barbarossa and Sons, Inc., is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The Mayor and City Administrator are authorized and directed to execute, on behalf of the • City, such contract with Barbarossa and Sons, Inc., as is approved by the Ciry Attorney for the completion of the Main Street/Evans Avenue Intersection Drainage improvement according to the approved plans and specifications designated in Resolution 95-26. 2. The City Administrator is authorized and directed to forthwith return to all bidders the deposits made with their bids upon execution of the contract above specified. Passed and adopted this 26th day of June, 1995. Henry A. Duitsman, Mayor ATTEST: Sandra A. Thackeray, City Clerk • 230/265-2221.jun