Loading...
7.4. SR 06-05-1995ITEM N0. 7.4 June 1, 1995 File: 230-271-10 ('0151`6TI6G ENGIRIERS Honorable Mayor and City Council 1326 Energy Park Drive City of Elk River sr. Prrul, nw sslDa 13065 Orono Parkway P.O. Box 490 612~64f-4389 Elk River, MN 55330 1~800~888~2923 Fax:612~644A4d6 ~; 1995 BITUMINOUS OVERLAY PROJECT Dear Council Members: As you directed, we have prepared the feasibility study for the 1995 Bituminous Overlay Improvements. As you recall, this includes the areas of Greenhead Acres 1st, 2nd, and 3rd Additions, Country Side Acres Addition, and the Avon Acres Area along east TH 10. These areas have been recommended by Street Superintendent Phil Hals for a bituminous overlay in 1995. It has been the City's practice to periodically undertake these types of CIVIIENGINEERINCr improvements in an effort to rehabilitate existing streets before deterioration gets to the ENVIRONMENTAL point that reconstruction is the only viable alternative. In accordance with the City's MUNICIPAL Assessment Manual, it is proposed to assess 100% of the project costs to the benefitting ~NING properties on a per unit basis. We have analyzed the assessment rates on an azea by azea I1D WASTE basis. This analysis indicated that each area would have approximately the same assessment sreucnrRAL rate. Therefore, the feasibility study recommends aCity-wide assessment rate estimated suRVEYINC at $1,505 per unit. TRAFFIC TRANSPORTATION The schedule presented in the feasibility study recommends a public hearing be held on June 26. It also suggests proceeding with plans and specifications at this time to expedite ELECTR~cAuMECHANICAr the project. Attached are two draft resolutions for your consideration. The first accepts ENGINEERING the feasibility study and calls for the public hearing. The second authorizes the preparation r"AC of plans and specifications. POWER DISTRIBUTION scnoA If you have any questions regarding this information, I will be in attendance at your June 5, SYSTEM CONTROLS 1995, City Council meefing. Sincerely, MSA, CONSULTING ENGINEERS ~- G2~ Terry/~au~E. OFFICEStN: .INNEAPOLIS TJMaw PRIORIAKE Enclosure sr. PAUL WASECA 230/271-3104.msy RESOLUTION 95 - • A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND ORDERING A PUBLIC HEARING ON THE IMPROVEMENT IN THE MATTER OF THE 1995 BTI'UMINOUS OVERLAY IMPROVEMENT WHEREAS the Feasibility Report ordered by the CouncIl in Resolution 95-22 has been prepared with reference to the 1995 Bituminous Overlay improvement and was received by the City on June 5th, 1995; and WHEREAS the Feasibility Report recommends that the proposed improvement is feasible; NOW, THEREFORE, BE IT RESOLVED 6y the City Council of the City of Elk River, Minnesota: 1. The City Council will consider the 1995 Bituminous Overlay improvement as described in the Feasibility Report and the assessment of the property abutting this proposed improvement for all or a portion of the cost of the improvement pursuant to Minnesota • Statutes, Section 429 at an estimated total cost for the improvement of $265,800. 2. A public hearing shall be held before the City Council on the proposed improvement on the 26th day of June, 1995, at 7:00 o'clock p.m., at the Elk River City Council Chambers. 3. The City Administrator shall provide ten days mailed notice and two weeks published notice on the hearing as required by law. Passed and adopted this 5th day of June, 1995. Henry A. Duitsman, Mayor ATTEST: Sandra A. Thackeray, City Clerk • 230/271-3104.msy RESOLUTION 95 - • A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ORDERING THE PREPARATION OF PLANS AND SPECIFICATIONS IN THE MATTER OF THE 1995 BITUMINOUS OVERLAY IMPROVEMENT WHEREAS a public hearing relating to the 1995 Bituminous Overlay improvement will be held before the Elk River City Council after ten days mailed notice and two weeks published notice of the hearing was given; and WHEREAS the City Council has duly considered the Feasibility Report; and WHEREAS the City Council desires to possibly expedite the project schedule pending matters presented at the public hearing; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: • 1. M5A, Consulting Engineers is hereby designated as Project Engineer for this improvement. The Project Engineer is directed to prepare plans and specifications for the making of the improvement and the solicitation of competitive bids. Passed and adopted this 5th day of June, 1995. Henry A. Duitsman, Mayor ATTEST: Sandra A. Thackeray, City Clerk • 230/271-3104.msy