Loading...
INFORMATION #1 06-05-1995INFORMA710N 1326 Energy Park Drive 51. Paul, MN 55108 6I2-644-4389 1.800.888-2923 Fax:612-644.9446 CIVIL ENGINEERING ENVIRONMENTAL May 31, 1995 File: 230-235-80 ~' T~® , 7 Mr. Jim Povich Minnesota Department of Transportation District 3 1991 Industrial Pazk Road Baxter, MN $6401 RE: CITY OF ELK RIVER F.Y. 1996 ISTEA PROJECT GEOMETRIC AND SIGNAL IMPROVEMENTS AT MAIN STREET AND TH 10 Dear Mr. Povich: The City of Elk River currently has the above referenced project programmed for ISTEA funding in F.Y. 1996. The present signal was installed in 1978, but increased traffic generated by surrounding development justifies left turn lanes and appropriate geometric and signal modifications. In order to construct these improvements, it is cleaz that right-of-way acquisition will be necessary. This acquisition may lead to the relocation of an existing business. MUNICIPAL Through discussions with the City Council and staff, we believe it will be difficult to obtain ""II''G the right-of--way and prepare the necessary documents to utilize the F.Y. 1996 funds. On °W"~ behalf of the City, we therefore request aone-year delay for funding for this project to sTRUCTURaL F.Y. 1997. It is our understanding that this delay would require that right-of--way suRVenNG acquisiton, permits, approval of the project memorandum, and submission of construction TRAEEIC plans for MnDOT review be completed by June 1, 1997- iRANSPORTATION ELECTRICAUMECHANICAL This project is extremely important to the City and they have every intent on completing ENGINEERING: the work. We are hopeful that you and your committee look favorably on this request for evAC aone-yeaz delay. Please contact me if you have any questions or require further POWER LNSTRIBMON information. SCADA SYSTEM CONTROLS Sincerely, MS'A~CONSULyTING EN,( Terry J. Maurer, P.E. City Engineer OFFKES IN: 'j'JM;pd INNEAPOLIS RIOR IAKE cc: Mike Tazdy, MnDOT ST. PAUL Pat Klaers, City of Elk River WASECA 135-3101.may