Loading...
7.3. SR 06-05-1995ITEM N0.7.3 June 1, 1995 File: 230-246-11 IbSSIILIISC E4CItiEEk1 1326 Energy Park Drive St. Pod, MN 55108 612-64d-d369 1.800-8882923 Foz: 612644-94d6 Mr. Pat Klaers City Administrator City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: ELK H1ZLS DRIVE/DODGE IMPROVEMENTS Dear Mr. Klaers: ' Now that the Developers of Outlot A, Deerfield Third Addition have indicated in writing their desire to have the intersection of Elk Hills Drive and Dodge improved along with Dodge Street north to 159th, and have also indicated their willingness to escrow for the cost of plans and specifications and accept assessments against their property in the amount of $145,000, it would be appropriate for the City Council to make a final determination on CIVIL ENGINEERING the intersection wnfiguration. As you recall, the last time the City Council considered this ENwaoNMENTAL item, they delayed a decision on the intersection configuration pending either a petition MuwcIPAL from the property owners to the south or an indication of a development moving forward ~`"""ING on Outlot A. SOLID WASTE srRLxTORAL The feasibility study for these improvements outlined two options for the improvement of SURVEYING the Elk Hills Drive/Dodge intersection. The first one referred to on Figure 8 in the TRAFFIC feasibility study was the curved alternative, and the second one shown on Exhibit 8-a in the TRANSVORTnnaa feasibility study was a 4-legged intersection. The City Council has discussed the pros and cons of both of these alternatives on several occasions, most recently at the April 3rd City ELECFRICAL/MECHANICAL ENGINEERING: COU11C11 meeting. It appeared that there was a consensus of the City Council leaning HYAC toward the 4-legged intersection. Attached for consideration by you and the City Council EOwER DISTRI6unoN are two larger scale drawings showing more detail of both of these alternatives. SCAOA srsrEMcoNreoLS Since the preparation of the feasibility study, we have had an opportunity to review these in greater detail. You will note that the 4-legged intersection has now been shown moved slightly farther to the east. This allows for greater stacking between TH 169 and Dodge. It also provides for a more defined lane for eastbound Elk Hills Drive traffic wanting to turn left to northbound Dodge. Based on all of our previous discussions with the City Council and the information obtained from the public at the informational hearings and City Council meetings, I would recommend that the City Council pursue the 4-legged intersection alternative. As I've indicated before, neither of these two options are a perfect solution to the traffic problems now and projected for the intersection of Elk Hills Drive PPICESIN: and Dodge. I believe the 4-legged intersection provides for the best solution, given the MINNEAPOLIS constraints of the physical parameters in the area. PRIOR LAKE ST. PAUL WASECA 230/246-071 Ljun • Mr. Pat Klaers June 1, 1995 Page Two I will be prepared at the June 5th Ciry Council meeting to answer any Council questions regarding these alternatives or to provide backup information from our previous discussions with the City Council. After Council consideration and direction on the alternative for the improvement of the intersection, it would be appropriate for the City Council to consider the attached resolution which authorizes the preparation of plans and specifications. I have structured the resolution such that the authorization for plans and specifications only deals with the intersection, necessary improvements to Dodge Avenue to the south, and the improvement to Dodge Street north to 189th. If you have any questions or would like additional information prior to the City Council meeting on June 5th, please call. Sincerely, MSA, CONSUCLT~IN/G ENGIN • Terry J. Maurer, P.E. TJM:tw Enclosure • 230/246-0111 .jun RESOLUTION 95 - _ • A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ORDERING THE IMPROVEMENT AND PREPARATION OF PLANS AND SPECIFICATIONS IN THE MATTER OF THE ELK HILLS DRIVE AND DODGE IMPROVEMENT OF 1995 WHEREAS, the Developers of Outlot A Deerfield Third Addition have requested the initiation of the preparation of plans and specifications and aze willing to escrow for the cost of such; and WHEREAS, the Developers have indicated their willingness to accept assessments against Outlot A Deerfield Third Addition for their fair shaze; and WHEREAS, the City Council has duly considered the Feasibility Report; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, • Minnesota: 1. MSA, Consulting Engineers is hereby designated as Project Engineer for this improvement. The Project Engineer is directed to prepare plans and specifications for the making of the improvement and the solicitation of competitive bids. Passed and adopted this 5th day of June, 1995. Henry A. Duitsman, Mayor ATTEST: Sandra A. Thackeray, City Clerk • zsorzav-m i i.~~n BRUCE A. PETERSON SHOPPING CENTER & COMMERCIaI REAL ESTATE CONSULTANT 7545 OFFICE RIDGE CIRCLE May 31, 1995 EDEN PRAIRIE. MN 55344 • 612.944-7447 FAX 612-941-5492 Mr. Pat Klaers -City Administrator CITY OF ELK RIVER PO Box 490 13065 Orono Parkway Elk River, MN 55330 RE: E!k River Development Corporation Project Northeast Corner of Elk Hills Drive and U.S. Highway 169 Dear Mr. Klaers, This letter will confirm our recent discussion regarding our request !flat the City of Elk River authorize its consulting engineers (MSA Consulting Engineers) to commence to prepare plans and specifications for the revision to intersection of Elk Hills Drive and Dodge Street as well as the revisions to Dodge Street extending from said intersection to 189th Avenue. It is further understood that said intersection will be designed as a "four legged T" substantially similar to Exhibit 8A of the MSA report dated ]anuary 18, 1995. Elk River Development Corporation agrees that on or about Lune 5, 1995 it will provide a letter of credit issued by Norwest Bank Minnesota as surety that it will pay for the cost of preparation of said plans and specifications. • The letter of credit will be in the amount of $22,500.00. Elk River Development Corporation agrees to provide the letter of credit with the additional understanding that the preparation of the plans and specifications will be completed by a date that will allow for bidding, the letting of contracts and commencement of construction of said roadwork by the day after the first Council meeting of September, 1995. The above defined terms and conditions are conditioned upon the City and the developer reaching agreement on the portion of the cost of construction that shall be the responsibility of tl7e developer (Elk River Development Corporation). The proposed developer's portion is set forth in a letter to the City of Elk River also dated May 31, I995. This letter is respectfully submitted in behalf of Elk River Development Corporation by its consultant, Bruce A. Peterson. Very Truly Yours, Bruce A. Peterson • m A N m x N 0 ~_ 00 ~ 0 P o0 r- ~rn ~ ~ m to D ~ mm ~m -I rr_ ~ ~ _ ~ ~ ~ c ~~ 2 ~ 07 c[~ O m r m ~ "' n ~~ ~ Wo m o 0 - 0 z Do ~ n ~ _~ ~ _~ D Z o z <0 0 0 n mZ Z m m N ~y O ~ 20 ~ ~ ~ rn c Cfl ~ 0 ~ m Tt fT1 rC~ D ~ ~~m r~ ~ z r~ t ~ ~ ~ __ _ !'ln,. ~ .S•~ • ~ SCHOOL STREET Fu eeie cac / aaarogn siwk R~17S' /BASE LOCATION aROaasEU e' CONC, WALK - FUTURE w ELK RIVER w RETAIL CENTER w 0 O D 6' CONE. 1NA11: PEDESTRIAN~~ CROSSING 1. 5EE EXHIBIT 9 R-25 SICP SIGN UTILITY AND DRAINAGE G ~N Z s v~ 2 0 0 0 0 M .D G Z CJTLOT a 5EE EXHIBIT 6 .NT TO BE OBTAINED . WALK ®0 5TH STREET, DODGE, AND ELK HILLS DRIVE OPTION 1 INTERSECTION LAYOUT ELK HILLS DRIVE AT T.H. 169 r ~~caa o o~ City of ~ CONSOLfllIC BNCOIEERS Elk fiver ~°