Loading...
8.3. SR 07-17-1995/` ~Ik Ri MEMORANDUM V~~ TO: Mayor and City Council ITEM 8.3 FROM: Stephen Rohlf, Building and Zoning Administrator DATE: July 7, 1994 j SUBJECT: Review of Conditional Use Permit for Commercial Asphalt's/Public Hearing CU 95-13 Request Commercial Asphalt Co. is requesting renewal of a conditional use permit to run a hot mixed bituminous plant, in an existing gravel mine. Location • The legal description of the affected property is the east half of the northwest quarter and that part of the west half of the northeast quarter that lies west of the right-of--way of US Trunk Highway 169, Section 22, Township 33, Range 26, Sherburne County, Minnesota. Attachments 1 and 2 to this memo are a general site plan of the property described and a site plan of the hot mix plant. The property lies in the southwest corner of the intersection of County Road 33 and US Highway 169. Background Commercial Asphalt Company's hot mix plant has all the appropriate state permits, including an air emissions .permit that expires January 25, 1998. Commercial Asphalt has done air emissions testing in the past, and the next scheduled time to do so is no later than October 31, 1997. The plant is equipped with a baghouse filter, which is periodically checked for leaks and the results are copied to the city. Commercial Asphalt was first given a permit from the City of Elk River in 1988. Because of the nature of the operation, this permit is to be reviewed and renewed at a maximum of every two years. However, due to odor complaints from adjacent residents, 1994's renewal was for only one year. • 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 CU 95-13 Continue d ----------------------------- • Issues Dust Page 2 Changes to this operation, since the last renewal, to control dust include paving the entrance to the site and buying a sweeper attachment for a Bobcat to clean the dust off of the hard surface drive and adjacent streets. Commercial Asphalt also continues to water as needed to control dust. Sedimentation Previously, there was a sedimentation problem to a pond in the southeast corner of the intersection of Highway 169 and County Road 33. Sediment from the Commercial Asphalt site was running to this pond and filling it in. Enlarging the sedimentation pond on Commercial Asphalt's site, appears to have alleviated this situation. The sweeper previously mentioned will also help. Staff feels this issue is resolved. Noise When Commercial Asphalt first started up, the city received complaints regarding noise levels from the plant. Adjustments to the blower fan for the • hot mix plant and placement of stockpiles apparently eliminated these problems. Staff has not received any complaints regarding noise for several years. Odor Staff feels that odor is the one true outstanding issue. To alleviate problems with odor, Commercial Asphalt has raised their stack height to help dissipate odor, and reduced the amount of recycled materials used during weather inversions. They have also made their phone number available for people with complaints. As of the date of this memo, Commercial Asphalt has received complaint regarding odor from the following residents: Brenda Bunker, on May 11, 1995, at approximately 2:30 p.m. Ms. Bunker lives on the east side of Highway 169. It was speculated that the odor was due to the plant just starting up at the time of the complaint. Once the plant reached full temperature, the complainant was called back and she indicated the odor had disappeared. • 2. Dave Munter, on May 16, 1995. Again, at the time of the complaint the plant was just being started up. It was discovered that the 6-27comm/bz/stever CU 95-13 Page 3 Continued • aggregate bin was not properly adjusted, causing the plant to run too hot (another way Commercial Asphalt adjusts their operation for odors is to turn the temperature down). Commercial Asphalt's response to this complaint was to shut the plant down until the aggregate bin was adjusted appropriately. When the plant started up again the odor problem had dissipated. Having complaint calls go directly to Commercial Asphalt, appears to be a much more efficient and timely way of dealing with the odor issue. Commercial Asphalt Co. has gone as far as not to run their plant under certain weather conditions. Staff feels Commercial Asphalt has been cooperative in dealing with the odor issue. The question for the City Council is whether or not Commercial Asphalt has been able to keep odors at an acceptable level and they should have their permit renewed, or odor levels are at an unreasonable level and their permit should be denied. Recommendation Attached to this memo is a conditional use permit that, except for a few • minor wording changes, is the same as the 1994 permit. The one exception is the permit that is attached to this memo is good for two years. The one issued in 1994 was only good for one year. The Planning Commission is recommending approval of this permit. Staff has re-notified the neighbors, including those who complained in 1995, of this renewal process. However, there was no one at the Planning Commission public hearing opposed to this renewal. .] 6-27comm/bz/stever __ _.-_~ __~ ___ ~ .-. _ ~.-- TAM •~q.[ ~a i ~. •1,* 1`I' - ~ 1 ~~~. ~ i TM f N ~~ COMMERCIAL ASPHALT CO. I ~''', ,; ,. -~e ;,.,: ~~ ~~,~ ,\~ ~, ,,, C'. ~~ - ~' - _ ~ i ~ :' r- - -- ---- -- - - SITE ~,-- -- - - - -- - ~,. ~ ' ~ • • :ir :~r' ~; ; 't q~ f j~ I i ~'. I' ~ ~-I r r I `,~ i ~ ~ ~ I i ~ ~ ~~ ~ ~~ _ m b Z _~ ., ~~i~ ~ __~~ ~ ~ ,. Or \~ ..~ ~. .~ I 1 c: ~ _ ~ 1~ ~~ rt[n 1 Vr; ELK RIVER MINNESOTA ~ ~ ' . ' SHERBURNE COUNTY ' "' T33N R26W • 1 - HOW MOYi t11Yl • .•\~ rL....rw 1• ~ 1 20+IM +11[~•\I[ w ~ 1 .' / I ~ ~,. ,~. .. II, r ~ ( ' r I ~ 1 1 t e 1 / ~ ~' t ' t ~ II ~ , ~ / ~ ~ ~ ~I ~ ~ „~ _~ ~ ~~ .. ~, , ~ 1 : i r• 4~ ~i ~ '" i ~ ~i / j •' ;-- f 1 I 1 =- f ~ ' ~• : ~~ ~ ' / \ a eou] ~ 1 ~~ ~ / ~. _, RAW ~ / / ~~~~~ ~~ ~ _ ~ - / ~ ~ i~ / / ! ~ +itATER Lam' ~ ~ ~ / ~ / ;-•,,.~'~, / ! ! I 1 ' It ~ . I , ~ ~~ / 1 I ~- L 1 ~ 6 -_ 1 { l 0• SITE PLAN o~t~a. .~ 200 ~.~ « r ~.. 1. 11. w r ._ .. wr.«. « ~.r% n.•...... ........~ 1 • STATE OF MINNESOTA COUNTY OF SHERBURNE CITY OF ELK RIVER In the matter of: Commercial Asphalt Co. CITY OF ELK RIVER CITY COUNCIL CONDITIONAL USE PROCEEDINGS Request: Renew their conditional use permit to process asphalt for an additional two (2) years. ORDER GRANTING CONDITIONAL USE Commercial Asphalt Co., Owner The above entitled matter came to be heard before the City Council on the 17th day of July, 1995, on a petition for a Conditional Use pursuant to the City of Elk River Zoning Ordinance, for the following described property: East one half of the northwest one quarter and that part of the west one half of the • northeast one quarter that lies west of the centerline of U.S. Highway 169, Section 22, Township 33, Range 26, Sherburne County, MN. IT IS ORDERED that a Conditional Use be granted as upon the following conditions: 1. THAT A MAXIMUM OF 30% RECYCLED ASPHALT CAN BE USED IN THE OPERATION IN ORDER TO CONTROL ODOR. IF WEATHER CONDITIONS MAKE ODOR TOO NOTICEABLE, THE OPERATOR MUST TEMPORARILY REDUCE THE PERCENTAGE OF RECYCLED ASPHALT IN THEIR OPERATION UNTIL ATMOSPHERIC CONDITIONS ALLOW THE 30% LEVEL TO CONTINUE. 2. THAT THE LEAD CONCENTRATION IN FUEL OIL COMPLY WITH CURRENT MPCA REGULATIONS OR BE NO MORE THAN 4,000 MG/KG, WHICHEVER IS LESS. FURTHER, THAT ANALYSIS OF LEAD CONCENTRATION BE PROVIDED AS PER MPCA'S REQUIREMENTS. 3. THAT A MAXIMUM OF 20% OPACITY IS ALLOWED FOR EMISSION FROM THE STACK FOR THIS OPERATION. 4. THAT PARTICULATE EMISSIONS BE LIMITED TO A MAXIMUM OF .04 GR/DSCF. 5. THAT ALL CORRESPONDENCE BETWEEN COMMERCIAL ASPHALT CO. AND MPCA INCLUDING TEST RESULTS BE COPIED TO THE CITY. b. THAT COMMERCIAL ASPHALT CO. BE ALLOWED TO USE BAGHOUSE FINES • IN THEIR OPERATIONS. cup-asph/bzlstever • 7. THAT THE NATURAL VEGETATION BETWEEN THE ASPHALT PLANT AND HIGHWAY 169 BE LEFT TO ACT'AS SCREENING. 8. THAT DURING DRY PERIODS THE SITE MUST BE WATERED TO AVOID DUST. 9. THAT COMMERCIAL ASPHALT CO. REIMBURSE THE CITY FOR THE COST OF REVIEWING THEIR PROPOSAL. THAT THE CITY HAS THE RIGHT TO CLOSE THIS OPERATION DOWN IF THERE IS IMMINENT DANGER AND THAT CITY STAFF HAS THE RIGHT TO INSPECT THE PREMISES AT ANY REASONABLE HOUR FOLLOWING NOTIFICATION. 10. THAT THE NORMAL HOURS OF OPERATION FOR THE PLANT ARE FROM 7:00 AM TO 7:00 PM, SEVEN DAYS A WEEK. HOWEVER, HOURS CAN BE EXTENDED FOR SPECIAL CASES BY THE BUILDING AND ZONING ADMINISTRATOR AS LONG AS THE ADDITIONAL HOURS DO NOT CREATE A NUISANCE FOR SURROUNDING RESIDENCES. FURTHER MPCA NOISE LEVELS MUST BE ADHERED TO AT ALL TIMES DURING THE OPERATION OF THIS PLANT. 11. THAT THE BAGHOUSE IS TESTED ONCE PER MONTH FOR LEAKS DURING THE OPERATING SEASON AND THE RESULTS OF THOSE TESTS ARE COPIED TO THE CITY. 12. THAT THIS CONDITIONAL USE PERMIT BE REVIEWED IN TWO YEARS AND A • NEW PERMIT BE OBTAINED AT THAT TIME. 13. THAT STOCKPILES OF RECYCLABLE MATERIALS NOT BE PLACED IN SURFACE WATER AND FURTHER THAT RUN-OFF FROM THESE STOCKPILES IS DIRECTED AWAY FROM ANY SURFACE WATER. THAT THE SIZE OF THE STOCKPILES BE LIMITED TO THE AMOUNT OF MATERIAL THAT COULD POSSIBLY BE USED IN ONE YEAR, BUT NOT NECESSARILY TO WHAT WILL BE USED IN ANY ONE GIVEN YEAR. FURTHER, THAT THE CITY UNDERSTANDS WITH THIS STIPULATION THAT SOME RECYCLABLE MATERIALS WILL BE RETAINED OVER THE WINTER SO THAT RECYCLING CAN START AT THE SAME TIME AS SPRING START UP FOR THE ASPHALT PLANT. 14. THAT COMMERCIAL ASPHALT CO. CONTINUE TO WORK WITH CITY STAFF TO RESOLVE PROBLEMS WITH NOISE IF THEY ARISE. 15. THAT COMMERCIAL ASPHALT CO. CONTINUE TO WORK WITH CITY STAFF TO ELIMINATE SEDIMENT FROM BEING INTRODUCED TO THE POND ON THE EAST SIDE OF HIGHWAY 169. 16. THAT COMMERCIAL ASPHALT CO. REDUCE ODOR FROM THEIR PLANT TO ACCEPTABLE LEVELS. DATED this day of , 1995. • cup-asph/bz/stever STATE OF MINNESOTA ) • ) COUNTY OF SHERBURNE) ss. CITY OF ELK RIVER ) OFFICE OF CITY BUILDING AND ZONING CITY OF ELK RIVER I, Stephen Rohlf, Building and Zoning Administrator for the City of Elk River with and in for said City, do hereby certify that I have compared the foregoing copy and Order granting a Conditional Use with the original record thereof preserved in my office, and have found the same to be a true transcript of the whole thereof. If the proposed work described in a conditional use permit has not been substantially completed within two (2) years after its date of issuance, the permit shall expire and become void except that the Council may, following recommendations of the Planning Commission, extend the permit for an additional period determined by the council on the receipt of a request for a permit extension prior to its expiration. A Conditional Use permit authorizes only the use specified in the permit and shall expire if, for any reason, the authorized use ceases for more than one (1) year. Stephen Rohlf, Building and Zoning Administrator • IN TESTIMONY WHEREOF, I have hereunto subscribed my hand at Elk River, Minnesota, in the County of Sherburne, in the City of Elk River, on the day of 19 _. DRAFTED BY: City of Elk River Signed before me a NOTARY PUBLIC Elk River, Minnesota 55330 this day of , 19 _. • cup-asph/bz/stever