Loading...
5.1. 5.2. SR 07-24-1995ITEMS 5.1 & 5.2. (~1~1~i "~1.1t~ h~ti1i1H;~ftS 1323 Er~rg~ Pork D~ ire St. Povl, !rNv 551 DB b12•b~d•4?$9 i •~D(t-~89•?923 For: bi?•6GA•9~! 16 C;YIt ENGINF'RINCf ~IRON.N~LNIAI MJNIC!°AL ithNNiNG SOt4D `rvAStE SIRUCP.iAA.i s~RicrlNt; IRAi HC (RAPdSFORIAliON EtECthCatiMECHAN1CAt $NCRNEER!h'(i: i'YAC ,k;:jwtR asi~le~F~~N SCAOA SfSiEhV CONIROtS • OFFICES iN: M,!tJ1d~PO115 PRIOR IkKE st. Pnu7. ~uecrre July 20, 1995 Fite: 230-271-58 I-Ionorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 F..lk River, MN 55330 RE: 1995 OVERLAY IMPROVEMENTS Dear Council Members: Competitive bids for the 1995 Overlay Improvement projects were rec+:ivcd on July 19, 1995. There were a total of seven bidders. The low bidder was Master Asphalt, Inc. with a. low bid of $195,062.60. Following is a listing of the seven bidders Sand their total bids: 1. Master Asphalt, Inc. $195,062.b0 2. Aero Asphalt, Inc. $199,b57.85 3. Bauerly Brothers $203,030.40 4. H & M Asphalt Company $206,793.50 5. Valley Paving, Inc. $206,366.55 6. Northwest Asphalt $208,378.45 7. Midwest Asphalt, Inc. $214,354.75 Enclosed is a draft Resolution which determines the amount to be assessed. It is proposed to assess $236,000.00. This is the construction bid, plus a small contingency, plus City overhead. Thete are approximately 180 units to be assessed on this project. At the public hearing, we heard from approximately 15% of the units. At the public hearing, the assessment rate was estimated to be $1,505.00, it has dropped approximately 14% to $1,300.00 per unit. The assessment hearing, according to the project schedule is to be held on August 28, 1995. After the assessment hearing is held, we will be prepared to reronltnend award of the contract to Master Asphalt, Inc. as to lowest responsible bidder. If you have any questions regarding this information, I will be in attendance at yi~ur Monday evening Council meeting. Sincerely, MSA, CONSULTING ENGINEERS/ Terry J. Maurer, P.E. 'I'JM:pd • RESOLUTION 95 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION DETERMINING ASSESSED COST OF IMPROVEMENT AND ORDERING PREPARATION OF PROPOSED ASSESSMENT ROLL IN THE MATTER OF 1995 OVERLAY IMPROVEMENT OF 1995 "V4'I-ll~;)~tF,.AS costs have been determined for the 1995 overlay improvement consisting of a contract price of $214,b00.00 and expenses incurred or to be incurred by the City in the making of the improvement in the amount of $21,400.00 for a total cast of the improvement of $236,000.04. NOW, T1-IEREFORE, BE IT RESOLVED by the City Council for the City of Elk River, NSinnesota: 1. Based upon the City Assessment Policies, it is determined that the portion of this improvement to be paid by the City and not assessed to benefitted properties is $0. 2. The portion of the cost to be assessed against benefitted properties pursuant to the E!k • River City Assessment Policies shall be $236,000.00. 3. The assessments shall be payable in equal annual installments and shall extend over a period of 5 years, the first. of the installments to be payable on or before the first Monday in January, 1996, with interest at the rate of 8.0% per annum from the date of the adoption of the assessment resolution. 4. The City Administrator with the assistance of the Project Engineer shall forthwith calculate the proper amount to be specially assessed for such improvement against every assessable lot, piece, or parcel of land, without regard to cash valuation, as provided by Iaw, and shall have available to the City Administrator's office a copy of the proposed assessment roll for public inspection. S. Llpon completion of the proposed assessment roll, the City Administrator shall notify the Council and schedule a public hearing upon the proposed assessment, causing notice of the hearing by publication and mail to be made at least two weeks prior to the hearing. Passed and adopted this 24th day of July, 1995. • Hank Duitsman, Mayor ~ ~__ ~- AT'i'EST: Sand~•a Thackeray, City Clerk Elk Rrver City Council Minutes Page 6 June 26,.1995 5. Open Mike No one appeared for this item. 6.1. Public Hearing to Consider Overlay Imp rovements for Greenhead Acres 1st 2nd .and 3rdAd,¢itions 6.2. Public Hearing to Consider Overlav Imp rovements for Countryside Acres 6.3. Pubhc Hearing to Consider Overiav Imp rovements for Avon Acres 6.4. Public Hearing to Consider Roa Improvements for Tr unk Hiahwav 10 Frontage Road West of Edison Street4153rd Avenue and Fillmore Street Cul-de-sac City Engineer Terry Maurer reviewed the scope of the proposed project as follows: • Overlaying roads in Greenhead Acres 1st, 2nd, and 3rd Additions, • Overlaying roads in Countryside Acres, • Overlaying roads in Avon Acres Area, and • Analyzing the feasibility of road improvements to Trunk Highway 10 frontage road west of Edison Street, 153rd Avenue, and Fillmore Street cul-de-sac. The City Engineer informed the Council that .the .proposed assessment for the improvements is on a per parcel basis and indicated that the estimated assessment at this time is $1,505 per parcel. The City Engineer reviewed assessment schedules of three and five year repayment periods. Mayor Duitsman opened the ublic hearin . p 9 1. The City Clerk noted that. Mark Johnson, 21101 York Street, submitted a letter regarding the excessive cost for the assessment. 2. The City Clerk noted that Loren and Barb Thompson, 12630 212th Avenue NW, submitted a letter indicating their opposition to the project. 3. The City Clerk indicated that she received a phone call from Reggie and Janice Kreuser, 14885 Gary Street, who indicated their opposition to the project. 4. The :City-Clerk- indicated-#hat she received a phone call from Nottie Leary, 21172 York Street, indicating opposition to the improvements. 5. Joseph St. Dennis, 21275 York Street, Greenhead 3rd Addition, indicated his opposition to .the city's policy of assessing the homeowners for an overlay project. He stated that by assessing for overlays, the tax rate is artificially lowered. 6. Bill Polk, 15656 Edison Street, indicated in favor of that he owns a business at this address and that he is not opposed or for the project. However, he is concerned about the amount of taxes he pays to the city. Elk River City Council Minutes Page ? June 26, 1995 7. John Lind, 9922 153rd Avenue NW, indica#ed he owns two narrow lots and indicated he does not intend to sell either lot. He stated he felt he should be assessed for only one parcel. The City Engineer suggested that if Mr. Lind has no intention of selling .either lot, that. he combine the lots and, in that way, he would be assessed for only one parcel. 8. Dennis Coleman, 1.9959 Gary Street, questioned the City Engineer as to how long an overlay would last and also whether the residents can be assured that there will be no additional costs for sewer and water improvements to the area. 9. Dave Harmonick, 2114b York. Stree#, questioned why the city is assessing for this type of project. He indicated that he felt an overlay should be covered by the nom~al taxes. 10. dim Lundquist, 21244 Vernon Street, indicated his concern regarding a pond across the raced from him and how it would affect the overlay. He further indicated that he did not feel the residents should be assessed on a per parcel basis. He indicated he is opposed to the improvement. 11. Art Johnson, 9956 153rd Avenue, indicated he is in favor of the improvements as Edison Street is in need of repair. 12. Del Thompson, 20680 Watson Street, indicated he is opposed to the project and stated that if the streets were maintained in a better fashion, • it would not be necessary to overlay the roads. 13. Daryl Peterson, 12793 210th Circle, indicated he is speaking on behalf of numerous people in the .Greenhead development..,.. He stated he felt the people in Greenhead were being singled out for this road improvement and questioned what areas of the city had overlay improvements in the past. He stated he is not opposed to maintaining the roads. 14. Wayne Rudloff, 12781 206th `Avenue, questioned why some of the property owners did not receive notice. 15. Rose Allison, 21380 Vernon, indicated that she is not ready to pay. for the improvements at this time. 1 b. Warren Hudson, 1154 6th Street, Countryside Acres, indicated he is opposed to the method of assessing the project. He suggested that a small city tax to all residents would be . a be#ter method than an assessment... 17. Daryl Droogsma, 13323 199th Avenue, indicated he is opposed to the improvement.. He further stated that he would rather see the citizens taxed for this instead of an assessment, and also sta#ed that he felf the streets were in good shape. Mr. Droogsma indicated he would like to see speed bumps on 199th Avenue. F Elk River City Council Minutes June 26, 1995 Page $ • 18. Tim Bykowski, 12767 210th Circle, indicated that he felt his taxes are already helping maintain services for which he does not benefit-from. 19. Joel Oakes, 21014 York Street, indicated he is in favor of the project. There being no .further comments from the public, Mayor Duitsman closed the public hearing. Councilmember Holmgren spoke to the subject of the city's policy of assessing overlays as opposed to a tax levy for overlays. He indicated that although this. is a good idea, he felt the time is not right to tax citizens far this type of project. .Councilmember Farber stated that he felt the streets need to be kept in .good' repair and .indicated that without an overlay the streets would deteriorate at a much more rapid pace. Councilmember Scheel indicated she liked the idea of taxing the citizens for overlays as apposed to assessing them. She further noted that she would vote against the overlays on behalf of her constituents except for the Avon Acres area. Councilmember Dietz indicated he did not feel a tax levy for an oveHay would be very equitable.. He indicated it would be very difficult to prorifrze the road improvement project. • COUNC1t.MEMBER HOtMGREN MOVED TO ADOPT RESOLUTION 95.39, A RESOLUTION. ORDERING THE IMPROVEMENT tN THE MATTER OF THE 1995 BITUMINOUS OVERLAY. COUNCIWIEMBER DtETZ SECONDED THE MOTION. THE MOTION CARRIED 5-0. COUNCILMEMBER HOLMGRfN MOVED TO ADOPT RESOLUTION 95-40, A RESOLUTION APPROVING THE PLANS AND SPECIFICATIONS AND ORDERING THE ADVERTISEMENT FOR BIDS IN .THE MATTER Of THE 1995 BITUMINOUS OVERLAY IMPROVEMENT. COUNCILMEMBER DiETZ SECONDED THE MOTION.'` THE MOTION CARRIED 5-0. 10. East. Highway 10 Worksession The Council recessed at 8:20 p.m., and moved to the Training Room to hold a worksession to discuss East Highway 10 improvements. The Council reconvened in a worksession a# 8:30 p.m: The Council spent approximately one hour discussing the potential improvements to East Highway 10. The following items were distributed: • Urban service area study map • Estimated assessment rate for possible urban service area • Letter from St. Cloud Appraises! • Map indicating major landowners • Timeframe