Loading...
7.5. SR 08-07-1995~~r ~~J ( ITEM 7.5. ( ~` ity of ~~ MEMORANDUM River TO: Mayor & City Council lk • FROM: Phil Hals, Street/Park Supt. DATE: July 31, 1995 SUBJECT: Woodland Trails Park Paving The road, parking lot, and trail construction at Woodland Trails Park is moving forward nicely. In about a week, all of the Class 5 base will be in place and it will be ready to pave. My original plan was for my staff to do the bituminous paving as part of our grant match, but I have several concerns. 1. Our grading and CL-5 installation will equal approximately $30,000 of our $50,000 match. 2. Our paver, being rubber tired, will not work well on the hills on a CL-5 base, so we would need to rent a truck type paver for $3,000 per week for two weeks or $6,000. • 3. If we are paying that much for a paver we should rent three trucks to haul, in addition to our three trucks, to keep the paver busy. This would cost $9,600. I did not calculate a cost for operating our paver, rollers, and three trucks. 4. A paving crew consists of five members plus three drivers which leaves myself and one other person to do the mowing and all of the other tasks for the two week period. In my opinion, it would be wise to hire a contractor to do the paving for an estimated cost of $19,500 which, with some incidentals, would cover the remaining amount for the grant match and would free up my staff to do normal maintenance work as well as our street patches and some playground improvements. The money could come from the park dedication fund. • 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425