7.9. SR 08-21-1995TTF.M 7 . 9 _ CONSDLTING ENGINEERS 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 August 15, 1995 File: 236-002-20 1-800-888-2923 Fax: 612-644-9446 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: DOWNTOWN PARKING LOT IMPROVEMENTS Dear Mayor and Council: At the direction of Bill Rubin, we have prepared a plan for the resurfacing and restriping CIVIL ENGINEERING of the parking lot located north of Main Street and east of Jackson, behind the downtown ENVIRONMENTAL businesses. We have also asked Barbarossa & Sons, the contractor for the Western rea MUNICIPAL Phase II Improvements, to give us a quote on this work for a possible change order to their ~NNING project. They have provided a quote, based on unit prices, in the amount of $35,294.00. SOLID WASTE sTRUCruRAL Pending City Council approval, we are prepared to issue a change order for the addition SURVEYING of this work to the Western Area Phase II Improvements. TRAFFIC TRANSPORTATION If you have any questions regarding this item, I will be in attendance at your August 21, 1995, City Council meeting. ELECTRICAL/MECHANICAL ENGINEERING: Sincerely, HVAC POWER DISTRIBUTION MSA, CONSULTING ENGINEERS SCADA SYSTEM CONTROLS ~- Terry J. aurer, P.E. TJM:tw OFFICES IN: MINNEAPOLIS PRIOR LAKE ST. PAUL 002-1519.aug WASECA CONSULTING ENGINEERS August 15, 1995 File: 236-002-20 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888-2923 Mr. Bill Rubin Fax: 612-644-9446 Economic Development Coordinator City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: QUOTE FOR DOWNTOWN PARKING LOT Dear Mr. Rubin: As you requested, we have solicited a quote from Barbarossa & Sons for the work in the avaENCwEERwG: downtown parking lot. The quote was prepared on a unit price basis. Following is a ENVIRONMENTAL summary of their unit prices. MUNICIPAL ~NNING i i P U i T t l P uanti r ce n t r ce a o SOLID WASTE STRUCTURAL 1. Mill surface 550 SF $ 5.25 $ 2,887.50 SURVEYING 2 Bituminous removal 8,300 SF 0.65 5,395.00 TRAFFIC 3. Bituminous overlay 430 tons 29.00 12,470.00 TRANSPORTATION 4. Tack coat 200 gallons 1.10 220.00 S. 6~~ Concrete sidewalk 80 SF 3.25 260.00 ELECTRICAL/MECHANICAL ENGINEERING: 6. 4 ~~ Concrete sidewalk 250 SF 2.78 695.00 Flvnc 7. B612 Concrete curb and gutter 1,575 LF 7.98 12,568.50 POWER DISTRIBUTION 8. Pedestrian ramps 3 EA 106.00 318.00 SCADA 9. Adjust castings 3 EA 160.00 480.00 SYSTEM CONTROLS TOTAL $35,294.00 This bid does not reflect the removal of the three concrete islands that Phil has requested for ease of snow removal. This will reduce the units under concrete curb and gutter and consequently reduce the total cost of the project. This quote is on a per unit price basis; therefore, they are only paid for the units which are used. If you would like, we are prepared to write a change order to the contract for the Western Area Phase II improvements to have this work done by Barbarossa & Sons. OFFICES IN: MINNEAPOLIS PRIOR LAKE ST. PAUL WASECA Mr. Bill Rubin • August 15, 1995 Page Two Please let me know how to proceed with this item. If you have any questions regarding it, please call. Sincerely, MSA, CONSULTING ENGINEERS fie- ~a~`~ Terry J. a rer, P.E. TJM:tw 002-1503.aug • • • INDUS 4' WIDE TACK k JMINOUS /y J J Mq~N \ STR f fT O g T- ~'' -;a. -`-~ MILL Exlsnr+ca SURFACE t~ 0[ STRAIGHT LIIFc • i MfAEar CSMKY rw~i 1M5 PUM. SPE pt gppRT u5 PR'MED W ~[ OI CI aRExrsa wn mgr i vRaressc«.a mE tt sutE~~ 7 i tE AEG,q