7.9. SR 08-21-1995TTF.M 7 . 9 _
CONSDLTING ENGINEERS
1326 Energy Park Drive
St. Paul, MN 55108
612-644-4389
August 15, 1995
File: 236-002-20
1-800-888-2923
Fax: 612-644-9446 Honorable Mayor and City Council
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330
RE: DOWNTOWN PARKING LOT IMPROVEMENTS
Dear Mayor and Council:
At the direction of Bill Rubin, we have prepared a plan for the resurfacing and restriping
CIVIL ENGINEERING of the parking lot located north of Main Street and east of Jackson, behind the downtown
ENVIRONMENTAL
businesses. We have also asked Barbarossa & Sons, the contractor for the Western rea
MUNICIPAL
Phase II Improvements, to give us a quote on this work for a possible change order to their
~NNING project. They have provided a quote, based on unit prices, in the amount of $35,294.00.
SOLID WASTE
sTRUCruRAL Pending City Council approval, we are prepared to issue a change order for the addition
SURVEYING of this work to the Western Area Phase II Improvements.
TRAFFIC
TRANSPORTATION If you have any questions regarding this item, I will be in attendance at your August 21,
1995, City Council meeting.
ELECTRICAL/MECHANICAL
ENGINEERING: Sincerely,
HVAC
POWER DISTRIBUTION MSA, CONSULTING ENGINEERS
SCADA
SYSTEM CONTROLS ~-
Terry J. aurer, P.E.
TJM:tw
OFFICES IN:
MINNEAPOLIS
PRIOR LAKE
ST. PAUL
002-1519.aug
WASECA
CONSULTING ENGINEERS August 15, 1995
File: 236-002-20
1326 Energy Park Drive
St. Paul, MN 55108
612-644-4389
1-800-888-2923 Mr. Bill Rubin
Fax: 612-644-9446 Economic Development Coordinator
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330
RE: QUOTE FOR DOWNTOWN PARKING LOT
Dear Mr. Rubin:
As you requested, we have solicited a quote from Barbarossa & Sons for the work in the
avaENCwEERwG: downtown parking lot. The quote was prepared on a unit price basis. Following is a
ENVIRONMENTAL summary of their unit prices.
MUNICIPAL
~NNING
i
i
P
U
i
T
t
l P
uanti r
ce
n
t r
ce
a
o
SOLID WASTE
STRUCTURAL 1. Mill surface 550 SF $ 5.25 $ 2,887.50
SURVEYING 2 Bituminous removal 8,300 SF 0.65 5,395.00
TRAFFIC
3.
Bituminous overlay
430 tons
29.00
12,470.00
TRANSPORTATION 4. Tack coat 200 gallons 1.10 220.00
S. 6~~ Concrete sidewalk 80 SF 3.25 260.00
ELECTRICAL/MECHANICAL
ENGINEERING: 6. 4 ~~ Concrete sidewalk 250 SF 2.78 695.00
Flvnc 7. B612 Concrete curb and gutter 1,575 LF 7.98 12,568.50
POWER DISTRIBUTION 8. Pedestrian ramps 3 EA 106.00 318.00
SCADA 9. Adjust castings 3 EA 160.00 480.00
SYSTEM CONTROLS
TOTAL $35,294.00
This bid does not reflect the removal of the three concrete islands that Phil has requested
for ease of snow removal. This will reduce the units under concrete curb and gutter and
consequently reduce the total cost of the project. This quote is on a per unit price basis;
therefore, they are only paid for the units which are used. If you would like, we are
prepared to write a change order to the contract for the Western Area Phase II
improvements to have this work done by Barbarossa & Sons.
OFFICES IN:
MINNEAPOLIS
PRIOR LAKE
ST. PAUL
WASECA
Mr. Bill Rubin
• August 15, 1995
Page Two
Please let me know how to proceed with this item. If you have any questions regarding it,
please call.
Sincerely,
MSA, CONSULTING ENGINEERS
fie- ~a~`~
Terry J. a rer, P.E.
TJM:tw
002-1503.aug
•
•
•
INDUS
4' WIDE
TACK k
JMINOUS
/y
J
J
Mq~N \
STR f fT
O
g T-
~'' -;a.
-`-~
MILL Exlsnr+ca
SURFACE t~ 0[
STRAIGHT LIIFc
•
i MfAEar CSMKY rw~i 1M5 PUM. SPE
pt gppRT u5 PR'MED W ~[ OI CI
aRExrsa wn mgr i
vRaressc«.a mE tt
sutE~~ 7
i
tE AEG,q