3.3. SR 06-18-2001TO: FROM: DATE: SUBJECT: MEMORANDUM Mayor and Council Lori Johnson, Finance Director June 18, 2001 Pay Estimates **Item 3.3.** Attached is a pay estimate for the downtown sidewalk improvement project that is nearing completion. The city engineer has reviewed the pay estimate and recommends approval. CONTRACTOR PAYMENT REQUEST RETAINAGE Pay Estimate #2- Downtown Sidewalk Improvements Schmidt Curb Company, Inc. $159,639.86 $ 9,170.97 Action Requested The City Council is asked to approve the pay estimate as listed above. FROM: TO: PARTIAL PAYMENT ESTIMATE NO. 2 MAY 1,200 MAY 31, 2001 CONTRACTOR: ADDRESS: OWNER: PROJECT: SCHMIDT CURB CO., INC. 13195 95TH STREET NE CITY OF ELK RIVER DOWNTOWN SIDEWALK IMPROVEMENTS COMPLETION DATE AMOUNT OF CONTRACT SUBSTANTIAL: June 15, 2001 ORIGINAL: $209,943.80 FINAL: REVISED: SCHEDULE 1.0 I MOBILIZATION LS 1 $5,000.00 0.25 $1,250.00 0.75 $3,750.00 2 REMOVE CONCRETE SIDEWALK SF 23315 $1.00 17750.00 $17,750.00 18350.00 $18,350.00 3 REMOVE CONCRETE CURB & GUTTER LF 600 $3.50 1002.00 $3,507.00 1282.00 $4,487.00 4 COMMON EXCAVATION (P) CY 385 $12.50 200.00 $2,500.00 285.00 $3,562.50 5 CLEARING TREE 20 $100.00 5.00 $500.00 15.00 $1,500.00 6 GRUBBING TREE 20 $100.00 5.00 $500.00 15.00 $1,500.00 7 SALVAGE & REINSTALL SIGN EA 5 $40.00 0.00 $0.00 0.00 $0.00 8 AGGREGATE BASE (P) TON 915 $17.80 486.00 $8,650.80 686.00 $12,210.80 9 BEDDING SAND (P) TON 195 $10.00 96.00 $960.00 146.00 $1,460.00 10 PEDESTRIAN CURB RAMP EA 9 $300.00 8.00 $2,400.00 8.00 $2,400.00 11 CONCRETE PAVER SIDEWALK SF 22365 $5.62 17943.00 $100,839.66 17943.00 $100,839.66 12 4" CONCRETE SIDEWALK SF 650 $3.00 407.00 $1,221.00 407.00 $1,221.00 13 CONCRETE CURB & GUTTER - TYPE B618 LF 600 $17.50 1082.00 $18,935.00 1282.00 $22,435.00 14 1' WIDE CONCRETE - 4" THICK LF 300 $6.50 623.00 $4,049.50 623.00 $4,049.50 15 TREE FRAME - 3' x 3' EA 19 $180.00 15.00 $2,700.00 15.00 $2,700.00 16 SODDING TYPE LAWN SY 200 $5.00 0.00 $0.00 0.00 $0.00 17 TOPSOIL BORROW CY 50 $15.00 0.00 $0.00 0.00 $0.00 18 TRAFFIC CONTROL LS 1 $2,000.00 0.50 $1,000.00 0.75 $1,500.00 19 PROCTOR TEST EA 2 $200.00 2.00 $400.00 2.00 $400.00 20 GRADATION TEST, AGGREGATE BASE EA 2 $194.00 1.00 $194.00 1.00 $194.00 21 CONCRETE TESTING EA 3 $160.00 1.00 $160.00 1.00 $160.00 22 DENSITY TEST, IN PLACE EA 30 $35.00 15.00 $525.00 20.00 $700.00 SCHEDULE 1.0 - TOTAL BID SUMMARY SCHEDULE 1.0 - TOTAL $168,041.96 $183,419.46 TOTAL THIS PERIOD TOTAL TO DATE $168,041.96 $183,419.46 TOTAL BID SUMMARY THIS PERIOD TOTAL BID SUMMARY TO DATE $168,041.96 $183,419.46 MATERIAL ON SITE $0.00 $0.00 MATERIAL DEDUCT. $0.00 $0.00 PREVIOUS PAYMENTS ..................................... $14 608 62 AMOUNT DUE $ ,6 .86 $159,639.86 o:\I)mj\80441 ] ]\Payset8 ! Page