5.8. SR 07-09-2001Howard R, Green Company Item ~ 5.8. July 3, 2001 File: 814700J-0030 The Honorable Mayor and City Council City of Elk River 13065 Orono Parkway PC) Box 490 Elk River, Minnesota 55330-0490 RE: 2001 STREET OVERLAY IMRPOVEMENT CITY OF ELK RIVER, MINNESOTA Dear Council Members: Attached is the Feasibility Study authorized by the City Council in Apdl for the proposed The streets include the bituminous overlay of various streets throughout the City. following: · Streets in Pinewood Addition · Streets in Sunset Ridge Addition · 197th/198th Avenue between TH 169 and Tyler Street · Gates Avenue and Freeport Avenue between Main Street and School Street · Victoria Lane (Delayed from 1998 Oveday Improvement) · York Street in McChesney Industrial Park · Streets between TH10 and Meadowvale Road up to and including York Street Historically, the City has undertaken a street overlay project every couple of years. The streets for the project are recommended by Phil Hals, Street Superintendent. According to the City's assessment policy and past practices, the actual bituminous oveday is assessed at 100 percent of the project cost. The street department tries to keep the cost somewhat lower by doing all the preparatory work themselves, such as patching, crack sealing, and sweeping of the streets. This Feasibility Study estimates the total project cost at $386,400 including 15 percent overhead. Each residential property is one unit. Industrial lots in McChesney Industrial Park were given two units. The apartments and commercial properties along Freeport and Gates Avenues were given assessable units based on their size. There are estimated to be a total of 250 assessable units. Based on 100 percent assessment, the estimated assessment rate would be $1,550 per parcel. As a reference point, the 1998 Street Overlay Project was assessed at $1,450.00 per unit. O:\PROJ~14700j\0030\Ltr-070201-CounciI.Res.doc 1326 Energy Park Drive · St. Paul, MN 55108 ° 651/644-4389 fax 651/644-9446 toll free 888/368-4389 The Honorable Mayor and City Council Page 2 July 3, 2001 Typically, the City has held the assessment and public headng the same evening after bids are received so that actual bid costs can be presented. Using this same type of schedule, there are four resolutions attached for the City Council's consideration. They are as follows: 1. A Resolution Receiving the Feasibility Report and Ordering a Public Hearing for Monday, August 13, 2001 2. A Resolution Determining Assessed Cost and Ordedng Preparation of Proposed Assessment Roll. The assessment headng would also be held August 13, 2001. 3. A Resolution Ordering the Preparation of Plans and Specifications 4. A Resolution Approving the Plans and Specifications and Ordering the Advertisement for Bids It is anticipated that construction bids would be received on August 7, 2001, and be available for the Council to consider on August 13, 2001, after the public headng and assessment hearing are held. If you have any questions regarding any of this information, I will be in attendance at your July 9, 2001, City Council meeting. Sincerely, Howard R. Green Company Terry J. Maurer, P.E. TM:mw Enclosures Howard R. Green Company O:\PROJ~814700l'~O30\Ltr'O70201'C°uncil~',~ U LTl N G ENGINEERS RESOLUTION 01 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND ORDERING A PUBLIC HEARING ON THE IMPROVEMENT IN THE MA'I-rER OF THE STREET OVERLAY IMPROVEMENT OF 2001 WHEREAS the Feasibility Report ordered by the Council in Resolution 01-21 has been prepared with reference to the 2001 Street Overlay improvement and was received by the City on July 9, 2001; and WHEREAS the Feasibility Report recommends that the proposed improvement is feasible; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The City Council will consider the 2001 Street Overlay improvement as described in the Feasibility Report and the assessment of the property abutting this proposed improvement for all or a portion of the cost of the improvement pursuant to Minnesota Statutes, Section 429, at an estimated total cost for the improvement of $386,400. 2. A public hearing shall be held before the City Council on the proposed improvement on the 13th day of August, 2001, at six o'clock p.m. at the Elk River City Hall Council Chambers. The City Clerk shall provide two published notices (one week apart) in the official newspaper with at least three days between the last publication date and the hearing, and mailed notice ten days prior to the hearing as required by law. Passed and adopted this 9th day of July, 2001. ATTEST: Stephanie A. Klinzing, Mayor Sandra A. Peine, City Clerk C:\windows\TEM P\Res-070201 -Feasibility.814700J.doc RESOLUTION 01- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION DETERMINING ASSESSED COST OF IMPROVEMENT AND ORDERING PREPARATION OF PROPOSED ASSESSMENT ROLL IN THE MATTER OF STREET OVERLAY IMPROVEMENT OF 2001 WHEREAS costs have been determined for the 2001 Street Oveday improvement consisting of a contract pdce of $336,000, and expenses incurred or to be incurred by the City in the making of the improvement in the amount of $50,400, for a total cost of the improvement of $386,400. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: Based upon the City Assessment Policies, it is determined that the portion of this improvement to be paid by the City and not assessed to benefited properties is $--0--. The portion of the cost to be assessed against benefited properties pursuant to the Elk River City Assessment Policies shall be $386,400. The assessments shall be payable in equal annual installments and shall extend over a period of five (5) years, the first of the installments to be payable on or before the first Monday in January, 2003, with interest at the rate of 5.5% per annum from the date of the adoption of the assessment resolution. The City Administrator with the assistance of the Project Engineer shall forthwith calculate the proper amount to be specially assessed for such improvement against every assessable lot, piece, or parcel of land, without regard to cash valuation, as provided by law, and shall have available at the City Administrator's office a copy of the proposed assessment roll for public inspection. Upon completion of the proposed assessment roll, the City Administrator shall notify the Council and schedule a public headng upon the proposed assessment, causing notice of the hearing by publication and mail to be made at least two weeks prior to the hearing. Passed and adopted this 9th day of July, 2001. ATTEST: Stephanie A. Klinzing, Mayor Sandra A. Peine, City Clerk O:\PROJ~814700j~:)030\R es-O70201 -AssessmentCost.814700J ,doc RESOLUTION 01- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ORDERING PREPARATION OF PLANS AND SPECIFICATIONS IN THE MATTER OF THE STREET OVERLAY IMPROVEMENT OF 2001 WHEREAS a public hearing relating to the 2001 Street Oveday improvement will be held on August 13, 2001, before the Elk River City Council after ten days mailed notice and two weeks published notice of the headng was given; and WHEREAS the City Council will duly considered the Feasibility Report and those matter presented at the public headng by those person desidng to be heard on the matter; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: Howard R. Green Company is hereby designated as Project Engineer for this improvement. The Project Engineer is directed to prepare plans and specifications for the making of the improvement and the solicitation of competitive bids. Passed and adopted this 9th day of July, 2001. ATTEST: Stephanie A. Klinzing, Mayor Sandra A. Peine, City Clerk O:\PROJ\814700j~:~030\R es-070201 -Ordering,814700J ,doc RESOLUTION 01- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION APPROVING THE PLANS AND SPECIFICATIONS AND ORDERING THE ADVERTISEMENT FOR BIDS IN THE MATTER OF THE STREET OVERLAY IMPROVEMENT OF 2001 WHEREAS pursuant to City Council director, the Project Engineer has prepared plans and specifications for the 2001 Street Oveday improvement, which plans and specifications have been reviewed by the City; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: Such plans and specifications, a copy of which is attached hereto and incorporated herein by this reference, are hereby approved. The City Administrator shall prepare and obtain the publication of an advertisement for bids for the making of the improvement pursuant to the attached plans and specifications. The advertisement shall be published once each week for three consecutive weeks, shall specify the work to be done, and shall state that the bids will be received by the City Administrator until 10:00 A.M. on August 7, 2001, at which time the bids will be publicly opened in the Council chambers of the City Hall by the City Administrator and the Project Engineer and will then be tabulated for consideration by the City Council at a meeting thereof at six o'clock p.m. on August 13, 2001, in the City Council chambers at City Hall. No bids will be considered unless sealed and filed with the City Administrator and accompanied by a cash deposit, cashier's check, bid bond, or certified check payable to the City Administrator in the amount of 5% of the amount of such bid. Passed and adopted this 9th day of July, 2001. ATTEST: Stephanie A. Klinzing, Mayor Sandra A. Peine, City Clerk O:\PROJ~814700j\OO30\Res-070201 -Plans.814700J .doc Project No. 814700J FEASIBILITY STUDY FOR 2001 OVERLAY IMPROVEMENTS CITY OF ELK RIVER, MINNESOTA JULY 2001 Howard R. Green Company Project No. 814700J CERTIFICATION PAGE Feasibility Study 2001 Overlay Improvements Elk River, Minnesota FEASIBILITY STUDY FOR 2001 OVERLAY IMPROVEMENTS CITY OF ELK RIVER, MINNESOTA JUNE 2001 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the State of Minnesota. Terry J. Maur/e~, P.E. License No. 15316 Date Prepared By: K~i~tin~ Thompson, E.I.'~. Date Howard R. Green Company Consulting Engineers 1326 Energy Park Drive St. Paul, MN 55108 Phone: 651/644-4389 Fax: 651/644-9446 O:XPROJ~814700j\Feasibility Study2.doc Howard R. Green Company Project No. 814700J INDEX Feasibility Study 2001 Overlay Improvements Elk River, Minnesota TITLE PAGE CERTIFICATION PAGE INDEX ................................ INTRODUCTION ................................ SCOPE .................................................................... EXISTING CONDITIONS ........... PROPOSED IMPROVEMENTS ............... ...................................................................................... EASEMENTS AND PERMITS ............ ............................................................................................ NECESSITY AND COST-EFFECTIVENESS ...... .................................... ESTIMATED PROJECT COST ......... ............................................................................................. FINANCING PROJECT SCHEDULE .................................................... .............................................................. CONCLUSION APPENDIX A PRELIMINARY ASSESSMENT ROLL EXHIBIT 1 LOCA.'i-ION MAP AND TYPICAL SECTION OSPRO~814700j\Feasibility Study2.doc i Howard R. Green Company Project No. 814700J Feasibility Study 2001 Overlay Improvements Elk River, Minnesota INTRODUCTION This feasibility study was authorized by City Council Resolution 01-21, adopted at their April 9, 2001 meeting. This feasibility study was initiated by the City Council based on the City's ongoing maintenance program. This study was conducted to determine the feasibility of overlaying several streets within the City. The streets considered for improvement are shown on Exhibit 1. SCOPE The purpose of this study is to analyze the feasibility of providing a bituminous overlay to several streets within the City including: Street From T.~o 182nd Avenue Yankton Street Victoria Lane 197th/198th Avenue Lincoln Street Kennedy Street Vernon Avenue 8th Street Xenia Avenue Vale Avenue 10th Street York Avenue/Wand Avenue York Street Watson Avenue Gates Avenue/Freeport Avenue Waco Street 182nd Avenue Meadowvale Road TH 169 Cty Rd 13 Cry Rd 13 TH 10 Upland Avenue TH 10 10th Street York Street 10th Street Meadowvale Road 8th Street Main Street Cul-de-sac Cul-de-sac Meadowvale Road Tyler Street Cul-de-sac Lincoln Street Meadowvale Road Xenia Avenue Meadowvale Road Xenia Avenue Vale Street Watson Avenue Cul-de-sac Wand Avenue School Street This study will discuss the existing conditions, proposed improvements, and estimated project costs. The total project cost consists of construction costs plus overhead costs, which include City administration, engineering, fiscal and legal expenses. Minnesota Statute 429 will be followed to assess benefiting properties. EXISTING CONDITIONS Freeport Avenue and Gates Avenue is a collector road with concrete curb and gutter and ranges in width from 44 feet to 48 feet wide, with a total length of approximately 3,300 feet. The remaining streets that are proposed to be overlaid are residential streets with limited amounts of storm sewer. These streets range in width from 22 feet to 32 feet wide, with a total length of approximately 18,700 feet. The streets nominally have a two to three-inch thick bituminous surface. Up to this time, there has been minimal preventive maintenance done on these streets. The streets are generally in good condition, but additional surfacing is needed to maximize the useful life of these streets before more costly repairs such as reconstruction are necessary. O:LPROJ~814700j'xFeasibility Study2.doc Howard R. Green Company Project No. 814700J Feasibility Study 2001 Overlay Improvements Elk River, Minnesota PROPOSEDIMPROVEMENTS The proposed improvement to the streets is to overlay with 1-~ to 2 inches of bituminous surfacing. The streets can be overlaid while maintaining traffic, so there will be minimal disruption during construction. Gates Avenue and Freeport Avenue will be milled on either side to ensure that they properly match into the existing concrete curb and gutter. In addition, the improvements would consist of milling and/or removal of a small portion of each driveway to ensure they can be made to match properly with the newly overlaid street. Exhibit 2 shows the relationship between life of service and strength of pavement. This graph shows that, once a street reaches 75% of years of service, the pavement strength rapidly drops and the cost to maintain the road increases. By overlaying these roads, the strength and life of the road will increase. The overlay will seal the cracking in intermediate stages. The overlay will also fill the Iow areas in the pavement, which collect water and decrease the life of the pavement. Existing transverse cracks, which are caused by freeze-thaw cycles, will likely reflect through the overlay in the future. There may be areas that need to be patched before placement of the bituminous. EASEMENTS AND PERMITS The right-of-way width for these streets ranges from 30 feet to 66 feet and is adequate for these improvements. No work is proposed outside of the right-of-way. No permits from any local or state agencies will be required for this project. NECESSITY AND COST-EFFECTIVENESS The streets being reviewed are in need of repair. The project is necessary to provide the residents of this area with a safe and adequate public transportation system. If the overlay is not done in a timely fashion, the roads will continue to deteriorate and reach a point where an overlay will not be a feasible alternative. The project will minimize maintenance cost, provide a cleaner neighborhood appearance, increase traffic safety, and minimize disruption outside of the right-of-way and to adjacent properties. The size of the project will ensure competitive bidding, from this standpoint the project is cost-effective. ESTIMATED PROJECT COST The estimated construction and project cost for the proposed improvements is provided below in Table 1. The project cost includes both construction and overhead costs. In accordance with the City's assessment manual, the overhead costs are estimated as 28% of the total construction cost. The overhead cost includes city administration, engineering design, construction staking and inspection, and fiscal and legal costs. Since this project will not require detailed plans and specifications, the overhead has been reduced to 15%. O 5PRO J\814700jLVeasibility Study2.doc 2 Howard R. Green Company Project No. 814700J Feasibility Study 2001 Overlay Improvements Elk River, Minnesota TABLE 1 2001 OVERLAY IMPROVEMENTS ESTIMATED COST Estimated Total Construction Cost Overhead (15%) TOTAL OVERALL PROJECT COST $336,000.00 50,400.00 $386,4OO.OO FINANCING As has been the City's practice in past overlay projects, it is proposed that 100% of the cost of the improvements be financed by assessments to the benefiting properties abutting the improvements. As outlined in the City's Assessment Manual, all properties with frontage abutting the roads or properties dependant on the road to be overlaid shall be assessed on a per unit basis. Each residential property is considered one unit. Lots in McChesney Industrial Park were considered two units. The apartments and commercial properties along Freeport and Gates Avenues were assigned assessable units based on their size. The assessable units based on size range from two units for the Bank of Elk River, eight units for North Memorial Health Care, and fourteen units for Evans Meadows Apartments. The total number of assessable units in the residential, industrial, and commercial areas of the project is 250. Dividing 250 by the total project cost of $386,400.00 results in a per unit cost of $1,550.0O. The existing parcels and corresponding property identification numbers forthe benefiting properties are shown on Exhibit lA through Exhibit 1E. PROJECT SCHEDULE The following project schedule for the 2001 Overlay Improvement Project is based upon guidelines in Minnesota State Statues Chapter 429 for assessment of local improvements: Order Feasibility Study Receive feasibility study, order public hearing Determine cost to be assessed/Order Assessment Hearing Order plans and specifications. Authorize advertisement for bids Open bids Hold public hearing Award contract Begin construction Complete construction April 9, 2001 July 9, 2001 July 9,2001 August7,2001 August13, 2001 August2001 September 2001 O:\PROJ\814700j\Feasibility Study2.doc 3 Howard R. Green Company Project No. 814700J Feasibility Study 2001 Overlay Improvements Elk River, Minnesota CONCLUSION Based on the information gathered and the analyses presented, the proposed overlay improvements are feasible from an engineering standpoint and would meet all standards set forth by the City. The improvement in this street would be another step in improving the street infrastructure within the City of Elk River. The estimated project cost is $386,400.00. O:LPRO.I~814700jLFeasibility Study2.doc 4 Exhibit 1 - 1 E Location Map and Typical Section DESIGNED BY:DES)GNED-BY DRAWN BY: DRAWN_BY. APPROVED BY:APPROVED-BY JOB NUMBER JOB~ CAD DATE: Ju)y 02, 2001 2:21:27 p.m. CAD FILE: 814700J~S14700J_OVERLAY4.DWD AREAS TO BE OVERLAYED VARIES VARIES I 1 1/2 - 2' 2350 TYPE MV3 BITUMINOUS WEAR COURSE MVWE35035B TACK COAT EXISTING BITUMINOUS t~EXISTING BITUMINOUS CURB TYPICAL STREET SECTION RESIDENT]AL STREETS 44'-48' i6' MILLi 2"2350 TYPE MV3 BITUMINOUS WEAR COURSE MVWE35035B TACK COAT EXISTING BITUMINOUS ~EXISTING BITUMINOUS CURB TYPICAL STREET SECTION GATES AVENUE/ FREEPORT AVENUE NOTE; MILL TO BE 1 1/2' DEEP AT CURB, TAPER TO O" DEEP 6' AWAY FROM CURB. 1326 ENERGY PARK DRIVE ST. PAUL. MINNESOTA 55108 (651) 644-4389 Howard R. Green Company CONSULTING ENGINEERS EXHIBIT 1 )210 sp EWOOD ,OLF COURSE FDESIGNED BY:DES)GNED-BY DRAWN BY: / /APPROV[D BY:APPROVED-BY JOB NUMBER OVERLAY VATE STREETS TO BE OVERLAID '5-495-0130 - 182ND STREET - YANKTON STREET - VICTORIA LANE 75. 75-495-0145 1326 ENERGY PARK DRWE ST. pAUl. MINNESOTA 55108 (651) 644-4389 Howard R. Green Company CONSULTING ENGINEERS EXHIBIT lA 75-510-0160 75-510-0340 75-510-0345 75-510-0455 75-510-0650 CITY PARK 200TH 75-123-3415 Z NW OAK 2ND 75-471-0140 75-620-010"- ,TH 75-126-2142 75-126-2140 APPROVED BY:APPRO '-- ~,n n~Tr-.~,,Iv 02. 2(301 10:57:.31 o.m. STREETS TO BE OVERLAI____~D OVERLAY - 197TH AVENUE - 198TH AVENUE 200 1326 ENERGY PARK DRIVE ST. PAUL, MINNESOTA 55108 (651) 644-4389 Howard R. Green Company CONSULTING ENGINEERS EXHIBIT lB AVENUE UPLAND 0~: LO-9~'-gL LO;~O-~Ot7-gL / 0 L LO-9~-CjL 0 I. gO-'kgl,-gZ o ~ o ~./ I.O-EOt~-GL gB tO-~Ot,-gL 98 LO-~Ot-gL £L DESIGNED BY: DESIGNED_BY DRAWN BY: DRAWN_BY APPROVED BY:APPROVED_BY JOB NUMBER JOB~ CAD DATE: July 02, 2001 5:25:55 CAD FILE: 814700J\814700J_OVERLAY. DWG OVERLAY STRE______ET_S_ TC) B__~E O~VE_FILAI____~D 1~0 ~ - YORK ST, - WATSON ST. - 8TH ST. ST!Sp2A6ULE'N WAND AVENUE - VALE AVENUE - FRONTAGE RCA o ~Howard R. Green CompanyJ XENIA AVENUE - VERNON AVENUE ~ CONSULTING ENGINEERS J /~/ EXHIBIT 75-442-0220 75-442-0~ GATE DESIGNED BY:DESIGNED-BY DRAWN BY: DRAWN_BY APPROVED BY:APPROVED-BY JOB NUMBER JOB~ CAD DATE: Jul 02 2001 3:25:55 .m. CAD FILE: B14700J 814700J OVER Y.DWG 75-64-0-0115 JE 75-447-0120 75 - 4 54--,,~!,"~ ?? Y 75-401-0440 75-401-0405 75-401-0130 ~-401-0105 GATES AVE. OVERLAY STREET TO BE OVERLAID - FREEPORT AVENUE 75, 75-405-1330 75-405-133~ HOLT  ST. PAUL MINNESOTA 55108 (651) 644-4389 Howard R Ween Company CONSULTING ENGINEERS 1D EXHIBIT 75-518-0~05 75-518-0210 75-518-0310 75-518-0 75-518-0260 75-518-0220 75-518-0320  '~ESIGNED BY: DESiGNED-BY DRAWN BY: ~/ PPR0V~D B¥:APPROV[B-BY JOB NUMBER 75-518-0120 OVERLAY r5-518-0330 75-51B-034C 75-518-0350 ard R. Gree Company KENNEDY STREET ._.J CONSULTING ENGINE'ER~S EXHIBIT 1E Exhibit 2 Pavement Strength versus Years of Service '1 THE COST OF '~MELY' MAINTENANCE From "THE HOLE .STORY .... FACTS AND FALLICIES OF POTHOLES" American Public Works Association, 1985 PSR VERY GOOD GOOD FAIR POOR VERY POOR 75~ TIME 40% DROP IN~ DUALITY ,, 40% DROP IN QUALITY Each $1.00 of Renovation cost here Will cost $4.00 to $5.00 if Delayed until ...... ~ here ;'~ TOTAL FAILURE 12~ TIME YEARS OF SERVICE The Advantage of Doing Timely Maintenance BWO16EX PAVEMENT STRENGTH VERSUS YEARS OF SERVICE City of ELK RIVER