6.1. - 6.3. SR 1-08-1996'ty of
iver
ITEMS 6.t . 6.3.
MEMORANDUM
MAYOR & CITY COUNCIL
FROM:
DATE:
WILLIAM RUBIN, ED COORDINATO~5~ ~.~
JANUARY 8, 1996
SUBJECT:
INTERMODAL SURFACE
TRANSPORTATION EFFICIENCY ACT
(ISTEA) GRANT APPLICATION
TOPICS/ISSUES
Introduction
At its meeting on January 8, the Elk River City Council will be asked to
consider three matters concerning the ISTEA Grant Application relating to
the Mississippi Riverfront Pathway Project:
To consider source(s) for the non-federal share of the project
costs;
To consider a presentation by Hoisington Koegler Group
concerning the contents of the ISTEA Grant application; and,
To consider a resolution of support of the ISTEA Grant
application.
Background
Since its formation in August of 1994, the HRA's Riverfront Corridor
Committee has diligently participated in the development of concept plans for
the Mississippi Riverfront Pathway Project in downtown Elk River. In
October of 1995, the concept plans were approved by the HRA and City
Council. As a result, this enabled the Riverfront Committee to advance the
project to its next phase. A component of this phase is the preparation of a
grant application for Intermodal Surface Transportation Efficiency Act
(ISTEA) funds. The ISTEA funds only cover a portion of a project's total
costs. In fact, the average federal funding request has historically been
approximately $258,000 per project. As a result, each applicant, known as
the sponsoring agency, is required to secure and guarantee the local share of
costs associated with their respective project. On a separate attachment, a
variety of sources has been identified for this exercise.
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425
Assuming the non-federal shares can be agreed upon, the City Council will
next hear a presentation on Elk River's ISTEA grant request. The ISTEA
request is for a transportation enhancement project. While bicycle facilities
and pedestrian facilities are examples of eligible enhancement projects, a
decision has been made to pursue the historical component of the Mississippi
Riverfront Pathway Project. This was done in order to potentially score
higher points in the application. Mr. Bruce L. Chamberlain, RLA, will be in
attendance to provide an overview of Elk River's ISTEA grant application.
Following this presentation, the last action item for the City Council is the
adoption of a resolution of support concerning Elk River's sponsorship of an
ISTEA grant for a transportation enhancement project. A component of this
resolution is a document entitled Agreement to Maintain Facility. Under this
agreement, the City of Elk River agrees to assume full responsibility for the
operation and maintenance of facilities related to the transportation
enhancement project (Mississippi Riverfront Pathway Project).
Action Requested
The Elk River City Council is asked to:
1. Identify and finalize various sources of the non-federal local share of the
Mississippi Riverfront Pathway Project costs not funded by ISTEA dollars;
2. Hear a presentation from Hoisington Koegler Group concerning the
details of Elk River's ISTEA grant application; and,
3. Adopt a resolution of support of an ISTEA grant for a transportation
enhancement project.
MISSISSIPPI RIVERFRONT PATHWAY PROJECT
FINANCING ILL US TRA TIO N
Elk River Municipal Utilities
$200,000
Elk River HRA
$150,000
1996:
1997:
1998:
1999:
2000:
$50,000 Cash
$25,000 Levy
$25,000 Levy
$25,000 Levy
$25,000 Levy
Tax Increment
(District No. 2 & District No. 3)
$ 50,000 (No. 2)
$150,000 (No. 3)
Other Local Sources
Including, but not limited to:
Park Dedication Fees
Liquor Store Revenues
NSP Contribution
Equipment Reserves and/or
Capital Project Reserves
In-Kind Contributions
(Civic Clubs & Organizations)
ISTEA Grant
$200,000
$200.000
$950,000
RESOLUTION 96 -
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION OF SUPPORT FROM THE CITY OF ELK RIVER
CONCERNING ITS SPONSORSHIP OF AN INTERMODAL SURFACE
TRANSPORTATION EFFICIENCY ACT (ISTEA) GRANT FOR A
TRANSPORTATION ENHANCEMENT PROJECT
WHEREAS,
the Intermodal Surface Transportation Efficiency Act
(ISTEA) of 1992 allocates approximately $7 million in
Federal Transportation Funds for qualifying projects in
Minnesota; and,
WHEREAS,
the City of Elk River has prepared an application for
ISTEA funding consideration; and,
WHEREAS,
the application seeks ISTEA grant funds for
transportation enhancements; and,
WHEREAS,
the ISTEA grant funds will be incorporated into the
Mississippi Riverfront Pathway Project in downtown
Elk River.
NOW, THEREFORE, BE IT RESOLVED that the City of Elk River act as
the sponsoring agency for a transportation enhancement
project identified as the Mississippi Riverfront Pathway
Project and acknowledges herewith that it is willing to be
the project sponsor, knowing full well that such
sponsorship includes a willingness to secure and
guarantee the local share of costs associated with this
project and responsibility for seeing this project through
to its completion, with comphance of all apphcable laws,
rules and regulations.
BE IT FURTHER RESOLVED that William Rubin, Economic Development
Coordinator, is hereby authorized to act on behalf of this
applicant.
BE IT FURTHER
RESOLVED that the Agreement to Maintain Facility
attached hereto is incorporated into, and made a part of,
this Resolution.
Passed and adopted by the City Council of the City of Elk River this 8th day
of January, 1996.
Henry A. Duitsman, Mayor
ATTEST:
Sandra A. Thackeray, City Clerk
AGREEMENT TO MAINTAIN FACILITY
WHEREAS,
the Federal Highway Administration (FHWA) requires
that states agree to operate and maintain facilities
constructed with federal transportation funds for the
useful life of the improvements and not change the use of
fight-of-way acquired without prior approval from the
FHWA; and,
WHEREAS,
transportation enhancement projects receive federal
funding from the Surface Transportation Program (STP)
of the Intermodal Surface Transportation Efficiency Act
(ISTEA) of 1991; and,
WHEREAS,
the City of Elk River is the project sponsor for the
transportation enhancement project, identified as the
Mississippi Riverfront Pathway Project.
NOW, THEREFORE, BE IT RESOLVED that the City of Elk River,
Minnesota, hereby agrees to assume full responsibility
for the operation and maintenance of facilities related to
the aforementioned transportation enhancement
project.
SIGNED:
(Signature)
Mayor
(Title) (Date)
(Signature)
WITNESSED:
City Administrator
(Title) (Date)
(Signature)
City Clerk
(Title) (Date)
Creative $olutioas for Land P]unaing and Dcsign
I-loisington Koegler Group Inc.
MEMO
January 3, 1996
To: BHI Rubin
From: Bruce Chamberlain
Re: ISTEA application for the riverfront project.
In preparation of an ISTEA application for a trail project in Elk River, this memo describes the
extent of the project we suggest and how the project can be best positioned to score as high as
poss~le. The riverfront pathway project from King Avenue to just east of the Otsego bridge, in
our view, will be viewed strongly ia the ISTEA "historic" category based on information sent by
the Sherburne County Historical Society. Due to the short length of the improvements though, I
suggest that we request a smaller amount oflSTEA funds - no more than $200,000. The reason
Ibr this is that the scoring process uses a cost/benefit ratio and I'm not sure we can justify more
than this amount for a trail segment this short even with the strong historic features.
The project can be best positioned as an interpretive river walk depicting the historical
transportation systems of early pioneer trade and how those systems came together to create the
settlement of Elk River. The historical strength lies in a number of areas including:
· log booms passing through Elk River on the Mississippi;
· ferry crossing at the Otsego bridge;
· ox cart trail along the alignment of Jefferson Highway;
· river boat which docked in Elk River;
· military road which came into Elk River from the north;
· commerce which occurred as a result of these transportation systems converging.
The Elk River Interpretive Trail (as the project could be titled for the ISTEA application) should
be described as a component of the larger riverfront project. The elements which would be part
of the ISTEA application should minimally include trail construction, landscaping, construction of
a pier or dock and interpretive elements that tell a story of local h.Lqtoric transportation. The story
can be told through depictions in paving, story boards, construction materials used and so on.
The project should also be described as a piece ora larger future trail network which connects to
significant transportation and historicaI sites such as the Oliver Kelly Farm.
The application must be 10 pages or fewer and include a project description, response to a
a£
7300 Metro Boulevard. Suite 525, MinncapollL Minnesota 55439
(612) 835-9960 Fax (612) 835-3160
96, EM NWl 20d T82 M399BOM NOIgNISIOH
09T£-g£8-~T9
Memo. Biff Rubin
January 3, 1995
Page 2
number of criteria, cost estimate, project timetable and a description of local funding. I also like
to include a short segment on project context to paint a picture of why this project is significant
within a larger framework, Exhibits can go beyond the ten pages. The exhibits we should
consider include the resolution of support, the riverfi.ont pathway concept plan, the City trail map
and historic photos & maps. We have located a number of photos fi.om the Historical Society but
il' you know of any which pertain to the riverfront and especially historic transportation, please let
me know. Paul Paige mentioned that there is a photo of a steamboat in the basement of the bank
and we were wondering if we could loan it for a short time to make a print.
The application generally scores points based on the project's significance and relationship to
transportation. One criteria asks if the project demonstrates more than a local impact or benefit.
This could be a stretch for our project so if you or others in Elk River can describe ways the
project has regional or statewide significance, we welcome your input.
Since ISTEA is about transportation, it is to the City's benefit to demonstrate that the project
revolves around transportation as much as poss~le. To that end, them may be some components
of the project worth adding to or modifying slightly including:
· naming the plaza identified near the Otsego bridge "Ferry Boat Plaza" to signify the
historic ferry crossing,
· including some etched paving stones in the plaza ti'om Main Street to the riverwalk
which depict local history and especially historic transportation,
· adding some historic story-boards which tell the early history of Elk River,
· adding a function to the dock to include interpretation of how the environment and
ecology of the river has changed since pioneer settlement and the impact log booms
and other forms of transportation had on the river.
Paul and I will be at the Riverfront Commission meeting this evening to discuss ISTEA and
answer any questions the Commission may have. If you have any questions, please give me a call.
M:X,F-.LKRIVER~9$.2..qiSTF_.At~O$,M£M
E£:SI 96, £0 N~£ £0d ~SE ~B]gBO~ NOIgNISIOH 09~£-S£8-~9
612-8~5-~160 HOISINGTON KOEGLER 585 PO1 JAN 88 '96 i6:2@
ISTE. A. Transportation Enhancement - Elk River Interpretive Walk
January 16, 1~96
Page 3
Project Context
During early European settlement, several forces of transportation converged at a bend in the
Mississippi River to create the beginnings of a village called Elk River.
The earliest Europeans to arrive ia the Midwest were trappers and fur traders. This became an
important economy prior to Minnesota statehood and continued to be until the latter part of the
19th Century. Furs were trapped in abundance ia the Red River Valley, primarily by the Hudson
Bay Company, and brought to market in Mendota and later St. Paul. The route taken between
these two points was an ox cart path known as the Red River Trail used as early as the 1840s.
The trail followed the Mississippi River and passed through Elk River. There, several businesses
established themselves to support the traders. In 1860 alone, 1400 carts passed along the trail.
By 1858 a new military road was constructed to provide access to the Minnesota Territory
hinterlands where forts were to be constructed including Fort Ripley. The road followed the ox
cart trail and the Elk River House, an early hotel, was a designated stopping place along the route.
The Mississippi was obviously an important transportation route in the early years. By 1851
Steamship traffic was common on the upper Mississippi carrying dry goods, hardware and
furniture as far as St, Cloud and Elk River became a regular docking place for the steamers.
There was also a ferry established in I856 to cross the Mississippi at Elk River. Ferry service was
short lived but provided an important crossing before the first bridge wa.q constructed in 1906.
Perhaps the most significant transport which shaped the community of Elk River and much of
Minnesota was logging. Log boorrkq were prevalent from the 1840s to the turn of the Century on
the Mississippi from its upper reach to St. Anthony (now Minneapolis). Virgin timber was cut in
the pine forests of the upper Mississippi and floated to mills downriver. Elk River had its own
sawmill which drove much of the early development of the community. "Teamsters serving the
pinery camps brought business to Sherburne County taverns and many of the pioneers of the
county were able to earn a cash income by working in the woods during the winter season.''m By
1856, Elk River boasted a lumber mill, ferry service, a school, two general stores, the Elk River
House and a door & sash factory? all driven by the development and use of the various routes of
transport through the community which converged at the downtown riverfront.
Today, Elk River's downtown riverfi-ont plays little importance in the everyday life of the
community. Main Street buildings back up to the river and parking lots consume the landscape.
Them are few remaining clues that this place was once the stopping point of travelers, the driving
force of the economy and the heart of community life.
The community would like to change that. Last year the Elk River City Council adopted a
concept plm~ for the Riverfront Pathway project, an important component of which is the Elk
River Interpretive Walk depicting the early transportation history of the region.
(1) History of.?joneer Lumbering. on the Up.r~r Mississippi and It~ Tributaries, Daniel Stanchtield, St. Paul,
1901: Collections of the Minnesota Historical Society.
(2) Historical Sketch; Sherbume County Historical Society.
61~-8J5-~160 HOISINGTON KOEGLER ]0~ PO~ JAN 08 '96 16:~9
ISTEA - Trampor~6on Enhancement - Elk River Interpretive Walk
January 16, 1996
Page 4
Project Description
The Elk River Interpretive Walk is an important component of the community's Riverfront
Pathway project anticipated to be constructed over the next few years. The interpretive walk will
be a several block long stretch of pathway, landscaping and historic elements depicting the
historical transportation systems of early pioneer trade and how those systems came together to
create the settlement of Elk River. As discussed earlier, there are a number of significant
historical transportation systems which will be depicted in the interpretive walk including:
· log booms passing through Elk River on the Mississippi;
· ferry crossing at the Otsego bridge;
· ox cart path (Red River Trail) along the alignment of Jefferson Highway;
· river boat steamboats which docked in Elk River;
· military road which traveled through Elk River from Fort Ripley to Twin Cities.
The City of Elk River is applying for ISTEA Enhancement funds to assist with the following:
1) Construct a 1,000 foot long interpretive walk and plaza connecting Main Street with
the new improvements at the riverfront along with necessary retaining walls.
2) Construct a I/4 mile bike trail with necessary retaining walls along the riverffont which
will eventually connect to the regional trail system.
3) Provide landscaping 'along the length of the interpretive walk and trail.
4) Install a dock in the Mississippi River to interpret the river's environmental history and
river transportation's impact on ecological systems.
5) Install pedestrian and bicycle facilities including bike racks, benches and trash
receptacles.
6) Install murals, etched pavers and story boards throughout the project to tell the history
of transportation systems listed above.
Project costs are:
Interpretive walk ...................................................
Bike trail ................................................................
Landscaping ...........................................................
River dock .............................................................
Pedestrian and bike facilities ...................................
Historical interpretive elements ................. . ..............
Subtotal (ISTEA eligible) ..........
Design/Administration (22%) .................................
Total ........................................
$90,000
$40,000
$48,000
$38,000
$20,000
$261,000
$57,000
$318,000
The City of Elk River is applying for $198,000 of ISTEA funds (76% of eligible project
costs). The City has identified the necessary funds in the amount of $120,000 which czm be used
to pay the remainder (see Exhibit 1).