Loading...
6.5. SR 07-16-2001City MEMORANDUM Item # TO: FROM: Mayor and City C~ Michele McPherso~a~Director of Planning DATE: July 16, 2001 SUBJECT: Case No. CU 01-21 Elk River Municipal Utilities - Conditional Use Permit Request for a Well and Water Processing Facility 6.5. Request The Elk River Municipal Utilities requests approval of a conditional use permit to allow construction of a water treatment facility. Location The property is located south and east of Twin Lakes Boulevard and north and west of Trott Brook Farms, at approximately the 5th Street alignment. Attachments · Location Map · Architectural Elevations · Site Plan · Landscape Plan · Building Layout · Building Sections Zoning/Land Use Rlc, Single Family Residential (11,000 sqft lot area) / MR, Medium Density Residential Memo to Mayor & City Council/CU 01-21 July 16, 2001 Page 2 Overview The Municipal Utilities continues to expand its water production facilities into the east Elk River area. In order to accomplish this, well and water treatment facilities must be constructed. The subject property is a remnant property, which the city purchased for the Twin Lakes Boulevard (Tyler Street) road construction. The west portion of the subject property has been utilized for Twin Lakes Road fight-of-way and the remnant property will be utilized for the well and treatment facility with a portion possibly being sold to the adjacent developer to the east. Located on the property was a single family home and Quonset hut. The property is currently vacant and has a large wetland complex in the southeast portion of the property. The Utilities proposes to construct Well #7 on the subject property and in concert with the well, will also construct a water treatment and processing facility. Project Description The Municipal Utilities proposes to construct a 26' x 74' water treatment building constructed of pre-cast raked finished concrete panels. The structure will be 17' high with an interior roof of 14'10". Located in the building will be a filter, a backwash reclaiming area, and space for a variety of chemicals used in the treatment of water. The proposed structure will be located on the east side of Twin Lakes Boulevard 50' from the property line. One driveway access is proposed which will be a "right-in right-out" on Twin Lakes Road. The surrounding area is predominantly residential and staff would suggest minor modifications to present a more residential design for construction. This would include modifying the roof and perhaps changing the concrete panels to have a brick- like texture impressed into them. A landscape plan was not submitted, however, staff did develop a plan which includes evergreen trees and overstory trees. Parking is not a requirement for the use of this building. The proposed access driveway will also serve as a parking area for the employee who will check on the operation of the facility on a regularly basis. Staff would suggest, however, that a turnaround be included to provide space for trucks to back into for ease of turning around. Planning Commission Action The Planning Commission conducted a public hearing at its June 26, 2001 meeting. No one spoke for or against the request. The Commission tabled the request until the July 10, 2001 in order to review building material and design options. Staff presented three building design options for the Commission to consider. The Commission voted 4-1 to recommend approval of the project with design Option 3. S:\PLANNING\MICHMC\CCREPRTS\CU01-21 .DOC Memo to Mayor & City Council/CU 01-21 July 16, 2001 Page 3 Recommendation Staff and the Planning Commission recommend that the City Council approve the request for a conditional use permit for construction of a water treatment facility with the following conditions: I. The building shall comply with the Building Code requirements. 2. The building shall be built as designed in Option 3. 3. Landscaping shall be provided as noted on the proposed landscape plan. 4. A backup area shall be provided as part of the access driveway. S:\PLANNING\MICHMC\CCREPRTS\CU01-21 .DOC SCHEMATIC ELEVATIONS NOT TO SCALE Itaver WATER TREATMENT PLANT #7 ELK RIVER MUNICIPAL UTILITIES 6/26/2001 CML Sr'[ OR~WING SD1 SCHEMATIC ELEVATIONS NOT TO SCALE WATER TREATMENT PLANT #7 ELK RIVER MUNICIPAL UTILITIES SEE 'DRAWING SD2 SCHEMATIC ELEVATIONS NOT TO SCALE Pdver WATER TREATMENT PLANT #7 ELK RIVER MUNICIPAL UTILITIES OI~kWN SEE 'I)IC~A, WING SD3 0B.27 I ~.35 I I 06 DRAWN BY: EY DESIGNED BY: K_T/EY JOB NUMBER 81330OJ APPRO'~ED BY: CAD DATE: Mey 10, 200t 1:O6:19 p.m. ._ CAD FILE: 8'i33OOi\8133OOCUP.DWG ,9o9.42 ; 909.5 ... ,X9o9.;6 --. 9o9.9%. /II //// ' -.... -9~7.86" 908 01 ii, ,' z ~ ,.,,~.~( -,, . . ¥9o6.o~ ~o -~ ~ \ · ~ ~ .- 0 ~ ,< 913.674~ ' t' .' ~,, \ O \ ~ ~ / / ~ / ' ''/ ~ , , / · -- ~-- -~-~ -- -- ~ ' ' .~o., ~ ~~.~'- ':'~- ,' , ~ ~ ~ - .~4 ~ ~ ~ 5o' ' ~' - ' ' ,~ ~~.x .... __'~ -~-, ~ ~?==_:__ -- ~ht ~ ~ ~ ~ ~ 90~5~x 99.61 ~ ~ x/8~ LO2 ~ n~= x 902.94 D.77 / ~T PAUL ~INN¢$OTA 5~08 · (":'~ ....... I I WATER TR,~,,I'MENT I=ACILFFY NO. 7 ~rd IR. Green Oompany II D'~ M, 909.4-2 ~ Q~Q ,~ ' X ''* 909.99, ii .7 u u.,.~ ''. ~ 909.26 , ~ ~.% .~ ,,' , .. l; ,',~.'~ ~' ',/',, ,%~89~ ~'i' ' / ~) x 9~59 / ,, -.. ,, ~ ~ 50' ~ ~ ~ -.__ ,, ~.~ -~- , , ~-=_~----~-- -- ~ , ~ ? , , ' ' -'-~' ', ,, ; '. '. ' ~ ~ ~ ~ ~x 9~3.8~* 899.38 909 ' ~ ~ ~ ' ', ~ ,~ , ~ 902.94 x 08.27 I O6 X DESIGNED BY:KT/EY DRAWN BY: £Y APPROVED BY: JOG NUMBER 813300J CAD DATE: Moy 10, 2001 1:06:19 CAD FILE: .815300iX, 813300CUP.DWG ~C.,~O, .95 1,]26 ENERGY PARK ~)RIVE ST, PAUL. MINNESOTA 551~ ~~ (651) 644-d. 389 ~rd R. Ceen Company CONSULTING ENGINEERS ELK RIVER MUNICIPAL. UTUI'iES J WATER TREATMENT FACILITY NO. 7 CONDITIONAL USE PERMiT EXHIBIT ~4E/T NO. 1 74' -0' ---' J'- MCC J CON~ ~ELS ,, , ~ I . I I I / SUP~T ~ ~ I I I Z__ - ................ J I r ...... ZZE~Z~ZZZZ~ZZ-- ~ [ / II ~0'~ . 42' LO~~ FILTER ; I ' J J j j J J ~ j C~L~RI~ J J J ~ I ~ Il II I ' i I i I ~ II II I I j I I ~11 --~ ...... ___~-_ ..................... f I ~ I I I ~ I I I I I I i I I ] J J ] J J J ~ I I I DESIGNED BY: ~ JOB I:~.tE: u~¥ 2001 0RAWN gY: KL~ JOB NUUBER 813300J CAO O~TE: ).40? 03. C)OO1 CAD FILE: 813300jX, Dwqs~P',~P 1 .DWG KL'V1N NEWMAN R~'VISION DESC RII;rTION ~,~_ .~' st. pauL. ~NNEsOt^ s~to8 I j Howard FR. Green C, omoany WElL ,17 ~ ,I,8 WATER TFJEA~ PI_ANT ELK RIVER MUMC~AL UT1LJllE8 WATEFI ~TMENT BULDING LAYOUT SHEET D[SlCNED ~Y: ~ JOB DATE: MAy 2001 CA~ OAT[: MQy 05. 2001 12:29:5,5 o,~, CAD rILE: 815500~Dwc~s'~P~P2.DWG 26'-8' KI~'VI N NEWMAN DESCRIPTION . ~ ~,..~. ~.~ I .I26 PARK ST. PAUL, MINNESOTA ~ ] H~rd R. Green W,F:I I ,I,7 AND ,I,8 WATER 'TTEATMENT PLANT ELK RIVER MUNK:~AL UTLTES WATER ~TMENT BUILDING SC-CT1ONS NO. P2