4.6. SR 07-23-2001R3ver
MEMORANDUM
Item 4.6.
TO:
Mayor and Council
FROM:
Lori Johnson, Finance Director
DATE: July 23,2001
SUBJECT: Discussion of Sites for Family Center/Charlie Blesener
At the April 30, 2001, joint meeting with the School Board, the school district's family/art
center proposal was discussed. Charlie Blesener has requested an opportunity to further
discuss this proposal with the Council and will be present at Monday's meeting to initiate
discussion on sites and what city activities or spaces could be included in the facility.
Attached is a memo from Mr. Blesener that includes a request for city assistance in securing
a site for the facility; the memo does not state how much property is needed. As you know,
both the YMCA and Minnesota Sports Federation have also requested property from the
city for their facilities.
The second item of discussion on Monday is the types of space and uses that could be
included in the family/art center. The memo mentions public meeting rooms and senior
center space. The Council has briefly discussed including large meeting room space in either
the YMCA or an expanded city hall if this need is not met by the private sector. However,
the Council has not recently discussed other space needs like senior center space.
Finally, this will be mainly an informational presentation. No action is required on this item
as it is still early in the development process. Also, the Council may find it difficult to
prioritize and commit its finite resources at this point and may want additional time to
consider this request since it is currently considering several other project proposals (YMCA
and city hall expansion) that are also in the early development stages.
728
! C ih]ii. UllityEduc tion
,~*~ ~230 NW School Street Elk River, Minnesota · 5~330-2506 * [612) 241-3520
18 July 2001
To: Mayor Klinzing & City Council Members
RFrom. :.Charl!e Blesener, Administrator of Communi~"ducation
e: ~nrormation on examples of jointly planned facilities
Enclosed with this memo is information on a few facility projects that have been completed in
Minnesota in the past few years which are examples of cooperative ventures between school
districts, municipalities and/or municipal HRA's, and in some cases, additional partners. Some of this
information may have previously been shared with the council at one of the joint meetings with the
school board, but I wanted to be sure you had it in advance of your July 23, 2001 meeting.
As a follow-up to the joint City Council/School Board meeting of April 30, 2001, I will be in
attendance at your meeting on July 23. My intention is to update the council on the planned
Family/Art Center, including preliminary concepts about the facility itself, what programs are expected
to be housed there, community spaces in the facility, how the arts component will be incorporated,
funding mechanisms and the approximate timeline for the facility. In addition, I will invite the City of
Elk River to consider the planned Family/Ad Center as a viable building to also accommodate future
municipal needs such as large meeting spaces, space for senior programming, etc. Finally I will also
ask the City of Elk River to assist us in securing a suitable site in Elk River for the facility.
I look forward to beginning a dialogue with you on the 23rd that I hope will result in a quality
community facility in Elk River.
Serving the communities of:
Elk River e Otsego · Rogers · Zimmerman · Hassan · Livonia · Dayton · Ramsey · Big Lake Township · Frankfort · Burns ° Albertville
SERVICE
CENTER
RECREATIONAL, CULTURAL,
EDUCATIONAL & WELLNESS
PROGRAMS
Parks and Recreation
400 10TH STREET N.W.
NEW BRIGHTON, ~ 55112
General Information
mO~ 612-638-2120
mO~ 612-638-2130
FaX 612-638-2135
INTRODUCING NEW BRIGHTON
The City of New Brighton, population 22,000, is located in Ramsey County at the
intersection of highways 694 and 35W. Before it was a fully developed first ring
suburb, New Brighton was a free standing city.
The Parks and Recreation Department oversees the Family Service Center, 11
parks, park maintenance, forestry, 9 hole golf course and driving range. The
facilities include softball fields, tennis courts, ice finks, volleyball courts and
picnic pavilions. Programs include senior, adult and youth athletics, senior
citizen clubs, adaptive clubs, summer playground program, adult trips, fitness
training, teen night and special events.
THE PROJECT
The New Brighton Family Service Center is located on the comer of 10th Street
Northwest and Old Highway 8 in the City of New Brighton, MN. The 70,000
square foot state-of-the-art facility was funded through a general property tax
levy. The levies will average $400,000 per year with the final levy being
collected in 2008. The operation costs are paid .through membership fees, room
rentals and daily passes. The total cost for the construction of the facility was
$5.2 million or $70 per square foot. Of the $5.2 million, $800,000 was funded by
Mounds View School District #621. The planning phase began in 1993,
construction started in April 1994 and the doors were opened for business in
November 1994.
CITY OF
NEW BRIGHTON
THE DESIGN TEAM
Owner
City of New Brighton
803 5th Ave NW
New Brighton, MN 55112
(651)638-2130
Manager: Steve Rymer
School District #621
Williams/O'Brien Associates, Inc.
1111 3rd Avenue South
Minneapolis, MN 55404
(612)338-8982
Structural and Civil Engineers
Bakke, Kopp, Ballou & McFarlin, Inc.
219 North 2nd Street
Minneapolis, MN 55404
(612)333-7101
Mechanical and Electrical Eneineers
Lundquist, Wilmare, Potvin, & Bender, Inc.
1935 West County Road B2, Suite 300
St Paul, MN 55113-1355
(612)633-1223
Constructior~ Manager
Adolfson & Peterson, Inc.
6701 West 23rd Street
Minneapolis, MN 55426
(612)525-2331
BUILDING DESCRIPTION
The Family Service Center is 70,000 square feet. It is owned by the city of New Brighton and
School District//621. The city owns 83% and School District # 621 owns the remaining 17%. The
many features that are included in the Family Service Center are as follows:
Eagles Nest
The largest kids play zone in the northern suburbs is 5,000 square feet. The creative play area
includes a variety of fun and exciting components for kids of all ages as well as comfortable viewing
area for the parents.
Gymasium
The gym is 7474 square feet. The floor is Sportwood and Ultra System made of Maple. The gym
can be used for a full court game of basketball or two cross court games with the curtain drawn.
There are a total of six basketball hoops. Anchors for volleyball equipment are located 6n the floor.
Attached to the east end of the gym is a stage. It can be used as another meeting room or for karate
classes and performances.
Locker rooms
The men and women's locker rooms each contain 22 lockers. Loclc~ can be brought from home to
secure belongings. Each locker room has three showers. One shower in each locker room has a fold
down seat to accommodate persons with a disability.
Track
The 1/1 Ith mile indoor track is made of Robbins Durthan with Rubber underlay. The track
overlooks the gym, Eagles Nest and lobby area and passes by the workout room. Space is designated
so that walkers and runners can enjoy the space simultaneously.
Fitne$~ Equipment
The 1500 square foot workout room overlooks the gym and is surrounded by the walking/jogging
track. Equipment includes 2 Precor EFX cross trainers, 4 LifeFitness Stationary bikes, 1 Vitamaster
bike, 2 Tectrix ClimbMax 2, 2 sit up benches, 1 Concept II rowing Ergometer, 3 LifeFitness tread
mills, 40EI ~ee weight benches and 15 High Tech professional strength systems. The entire area
was designed to provide an open feeling.
Meeting Room
There are two meeting rooms available for business rentals, classes and community organizations.
Each room has a capacity of 28 people and are equipped with a TV, VCR, overhead projector, sink,
coffee pot, whiteboard. There are a number of windows in both rooms that create a bright open
feeling.
Multi-purpose Rooms
These large colorful rooms are great for birthday 'parties, meeting and various other events.
larger rooms can be divided to fit specific needs.
The
Communi _ty Room
The 4500 square foot community room is available to meet a variety of needs from weddings and
banquets to corporate business meetings. The community room seats up to 250 people, has a parquet
dance floor, terrace, and a scenic view. This room has access to whiteboards, telecommunications
hook-ups, TV/video, very comfortable chairs and tables. The space can divided to accommodate
specific occasions. A wonderful catering service is offered from sandwiches to full gourmet meals.
A commercial kitchen is also available for all catering or banquet needs.
The teen lounge is adjacent to the snack bar. This area includes tables, chairs, a big screen TV, VCR
and fooseball. This is a fun place for teens to hang out, watch movies, listen to music and make new
friends. . _
A snack bar is available to patrons of the Family Service Center. It is operated by Northwest Youth
and Family Services. The hours are Monday-Friday from 1 lam-3pm, Friday evenings from 6pm-
10pm, Saturday 10am-6pm and Sundays 12pm-4pm. The snack bar serves a variety of food and
beverages.
Senior Exchange
The Senior Exchange includes three rooms on the 2nd floor of the facility. One area is a lounge that
includes a variety of books and magazines, comfortable chairs, stereo and a table and chairs. The
other lounge has a number of card tables and chairs, a pool table, darts, large screen TV, VCR, sink
and a coffee maker. The third lounge has a desk, computer, typewriter, telephone and storage
cabinets for sewing projects.
STRUCTURAL -MECHANICAL-ELECTRICAL
Structural
Foundation- Spread footing with concrete slabs on grade in all of the building. Existing soils were
removed from all footings and structural fill material was used to min/mize movement from
expansive soils.
Walls- Reinforced masonry block walls with brick veneer on exterior. Ail walls accessible to the
public are painted concrete block or burnished block to reduce maintenance and inhibit vandalism.
The exterior wall are well insulated reducing heating and cooling costs.
Roof- Prestressed concrete except for the gymnasium which is steel trussed.
Mechanical
Heating- Natural gas fired rooftop units.
The mechanical systems are computer controlled to maximize efficiently. The computer can also
check the systems to ensure proper operation and control.
Cooling- Rooftop air condition units.
Fire Protection- The building is fully sprinldered and has exterior and interior audible alarms.
Electrical
Lighting- A mixture of fluorescent and incandescent fixtures are used in the building.
lighting through windows and sky lights help to lower energy costs.
Natural
VENDOR LIST
Electrical
Plumbing Fixtures
Boilers
Rooftop Units
Radiation Unit Heaters
Pumps
VAV Boxes
Temperature Controls
Grills, Diffusers & Registers
Fans
Drains/Carriers
Excavating
Asphalt
Masonry
Concrete
Metal & Steel framing
Construction
Cabinets
Hardware
Drywall
Windows
Floors
Ceilings
Gym and Track floor
Carpet
Painting
Partitions
Elevator
Mechanical
Fire Protection
Gephart Electric
Westburne Supply
Goodin Company
Trane Company
R.E. Carlson, Inc.
R.M. Cotton Co.
SVL
Pneumatic Controls
SVL
TMS
Sehumarketing
F.M. Frattalone Excavating
Midwest Asphalt Corp.
Crosstown Masonry
Spancrete Midwest Co.
Listul Industries, Inc.
George F. Cook Construction Co.
Ron's Cabinets
Gardner Hardware
Minuti-Ogle Co.
Mulcahy
Grazzini Brothers
Twin City Acoustics
Anderson Ladd
BIS Carpets
Sunrise Painting
W.E. Neal Slate Co.
Schindler Elevator
Metropolitan Mechanical
Midwest Fire Protection
HOURS OF OPERATION
Building Hours
Monday - Friday 6:00am-10:00pm
Saturday 8:00am- 10:00pm
Sunday 10:00am- 6:00pm
Eagles Nest Hours
Monday - Friday 9:00am-8:00pm
Friday Teen Time 8:00pm-10:00pm
Saturday 9:00am- 8:00pm
Sunday 12:00pm- 5:00pm
Closed: Easter, Memorial Day, July 4th, Labor Day, Thanksgiving, Christmas.
FACILITY USE GUIDELINES
Age Appropriate in the Facili _ty
*Children ages 9 and under, must be accompanied by a supervising adult at all times.
*Children must be under 12 years old to play in the Eagles Nest.
*Children under the age of 6 must be directly supervised by a parent or guardian.
*Free wights are for adult (17 years old and above) use only.
*Youth 12-16 must complete the Fitness Orientation before using the fitness equipment.
*Youth 11 years and younger many use the walking track when accompanied by an adult.
General Rules
* Wristbands must be worn at all times in designated areas.
*Food and drink are only allowed in the lounge and lobby areas.
*No gum.
*No nmning.
*Appropriate, respectful and courteous behavior is expected at all times.
*Staff reserves the right to revise facility use if necessary.
Building the Future
1991
January1993
January1993
June 1993
September 1993
October 1993
December 1993
December 1993-
March 1994
A $7 million Community Center Referendum failed (55% to 45%). The
project included a swimming pool and was not cooperatively owned.
The City Council initiated community center discussions. They directed
staff to study partnership opportunities and not to include a swimming
pool in the facility.
Staff began to look for building partners.
~'Mounds View School District
~Northwest Youth & Family Services
~Ramsey County Public Health
~Private Physical Therapy Clinics
Architect and Construction Manager hired.
Mounds View School District committed to project.
City Council authorized development of building specifications and
construction schedules.
City Council approved construction without a referendum.
Bids awarded and final budget approved.
Apfil1994
December 1994
Construction began.
Family Service Center opened.
Key Players
City of New Brighton
City Council
Mayor
City Manager
Parks and Recreation Director
Community Center Task Force
Planning Commission
Parks, Recreation and Environmental Commission
Mounds View Public Schools
School Board
Community Education Director
Early Childhood & Family Education Supervisor
Contractors
Architect Team
Construction Manager
IF WE WERE TO DO IT AGAIN
1. Better controlled access into the building
2. Sidewalk access system into the facility from the street
3. Build a small gym in the Eagles Nest
4. Include a dance, aerobic, martial arts room
5. Have a family bathroom
6. More storage space
7. Redesign front desk area away from the Eagles Nest
8. Install a PA system
G:\WI~C98\FACILITY~SCDESCR. WPD
--::amii~y Service Center
GROUND FLOOR PLAN
I!
UPPER FLO~)'R"' PLAN '
· .:....~:: ~.
.-...- j:'.- · ,.
=':: ~, ':-" :.::.
~-":.;..: -
--..:.,...... :. ·
: ·
December 1994
CITY OF CHANHASSEN AND INDEPENDENT SCHOOL DISTRICT 112,
TEAM UP TO BI..I~D A COMMUNITY SCHOOL/RECREATION CENTER
In September of 1995, Independent School District 112 and the City of _C~h~,nhassen will open
the doors to a $9.3 million elementary school and recreation center situated on a ~,0 acre
campus/park site. This cooperative venture was made possible due to the high level of mast
and interdependence displayed by both the district and the city. The school district is
financing its portion of the project, $6.8 re;ilion, with a portion of the proceeds of a $46.5
million referendum. The city is investing $2.5 m~lllon in tax increment proceeds from
Pillsbury Bakeries and Food Service into its recreation center. The 90,000 sq. ft. school and
23,000 sq. ft. recreation center stand connected as one with separate parking lots and
entrances serving both components. Each party owns 20 acres of property; however, the line
separating the two is more of a formality than a necessity. As it tums out, the city's
recreation center is located on school property. In addition to the m~i,~ bui]aing, the site will
contain a multi-purpose park shelter, five ball fields, two Lighted hockey rinks, four Lighted
tennis courts, a playground, landscaped cour~ards, outdoor classrooms, and an access
boulevard; all linked by a trail and sidewalk system. The new school and recreation center
are being built in response to a growing population within the district and city. Both facilities
will be fLlled to capacity upon opening. The new elementary school has a design capacity
and core facilities for 650 students. Individual classrooms are grouped into "family clusters"
to promote the education concept of multi-age learning groups (students within a two to three
year age difference) and the "school within a school." Lifelong learning and leisure will be
the norm here and the building is accessible to the community and parents. Hammel Green
and Abrahamson provided the architectural and associated professional se, vices fer the
building and BorSon is the general contractor. Independent School District 112 and the City
of Chanhassen are extremely excited about the opportunities th/s new facility will offer the
community.
I
$ T~ T~
NEW
ELEMENTAl
$CllO01,
',/,/
/
/
/
I ~/
I d'
I~11¥1111 fnf
HI.'W
l,l.E# I:HTARY
,SCIIOOL
eo
'!'1M It ~,' R })' 00 D
l;'S T,I
I
I
I
I
I
I
I
I
I
I
I
I
LANDSCAPE PI/N
l
AND
C HAN HASSEN RECREATION CENTER
Chanhassen, Minnesota
1
2
2A
2B
3
4
$
7
8
9
10
11
14
15
16
17
18
19
22 Equipment Raom
23 AV Equipment Room
Dm~r~om/EdiUr~
ECFE Program Room
26 Sibling Care Room
27 Parenting
lOtchen
Cafeteria
Reeling
31 Electric:d
32 Meci~nic:d
Locker Room
Adaptive G~nnrmsium
39 Gymnmium
Me~flng Ramn
41 F~me~
42 Aerobics
43 Community Entry
44 Lobby
Community Gymmsium
47 LSD 112 Gym~slum
48 Obser~ion
A Faclli~ With a Foundation of Cooperation
Bluff .Creek Elementary School and the
.cnan~assen Recreation Center have opened the
ooors to a $9.3 million Joint facility on a 40. acre
site in Chanhassen. $c1~ool District 112 has invesb
ed $6.8 million to create a 90,000 _square foot
school capable of housing 650 students. A bond
referendum in 1993 financed the new school. The
City of Chanl~assen Invested $2.5 million of tax
Increment proceeds to complete its 23,000 square
foot recreation center.. EaR party owns 20 acres.
oT property, however, me line separating the two ~
more of a formality than a. necessity. As it ~rns
out, the recreation center Is actually, located on
land owned by the District. In addition to the
main bulldin& the site will contain a multi-purpose
park shelter, five .bali fl.elds, two ligl?ted .hockey .
rinks, four lighted tennis courts, ano a pmygrou, no.
The ,e?ementary school classrooms are groupeo
into family clusters' allowing multi-age grouping
for learning as appropriate. The two facilities are
connected as one with separate parking lots and
entrances.
H-G-
ARCHITECTS * ENGII~EERS * INTI~KIOR DESIGNERS * ~E ARCHITECTS
Dedication Ceremonies
Bluff Creek Elementary School
and
Chanhassen Recreation Center ·
'llJesday, October 10, 1995
6:30 p.m.
The National Anthem
Welcome
Vocal Selection
The Spirit of Cooperation
Vocal Selection
Presentation
'Ribbon Cutting
Program
The Chan-o-laires 8
Bluff Creek 5th Grade Choir
Todd Hoffman, Chanhassen
Cathy Gallagher, Bluff Creek
.The Chan-o-laires
MarJo_ry Adams, School Board
Don Oimiel, Mayor
5th Grade Choir
HammeL Green and
Abrahamson, Inc.
School Board
City Council
Please Join us for refreshments and tours of the building
following the dedicaUon ceremony.
Development of the Colvill Family Center
Red Wing Public Schools
Description:
The Co[vSl YamSy Center ts one pan of a ~ad for the CoN4il neighborhood and the cfm' of
Wing. The Colvdli Redevelopment project includes the Coiv42i Family Ceo:er: a Women's Center
,,~;,c~ shcn :e~ sneXer anc housing for women anc children: ant a playground for
a: ~ho z .,
.. ~ ,spay ceo:er and in the neighbcrhccd.
~ ne CoN~:ri Famffy Cen~er ts a collaborative effo= ne~.~;een Red Wing Pubi!c Schools: Red W!ng
~icusing ~ Redeveicomen~ Authoff?v: ~nree Rivers Communi=u Action. Inc..Head Sta~: ~ " ~
Ccun~, Scci~ ~.,.,,~,<~- ~' Public ,~:eh,~.. So,ices cf Gcedhue and ',i/~basha Ccundes and Hiawatha
V~ey AdMt Basic Education. ~e gc~ of :he Coi~ Family Center ts :o ~-~ ~ '
,,~ce a comfcxabie
niece where adulu and ~oung ch~dren can gather for ;~4. s
and en~cument.
The agencies involved in this project believe :ha: by working :cgerher and sharing resource, we
.... . - ,~,.e.,,. of ~um:w se~cas for .... ~d,'ie~ and k'cung cnEcren
w~ ...... :ne can:er '~=~ offer the fc~c~ng nx~ m~g.~.,.s:.
Esneciaitu for Children Preschcch ~ ', ...... ~-:" Childhood Sneci~
. . a_riu Childhood ramuu acucanon:
Ezucafiop.: L ...... n~ Readness; Eariy ~h;t;~.; Screening; Head 5~an: C~fid and ~ilv bcc:m
V/on<er: ~/cme,,. infant and ChSd Nu..,n~n Program: Immunkarcn Clinics: ChSd & i eeo
Checkups: Marem~ Chffd Hemp So,ices: Oe~ Heath Sem4c~: ' '" = ' -
.,, l~ui: Basic ~cucancrT.'G.n.D.:
Red Win~ Area Literacy Project and Sibling Care.
Developmental Milestones
Th~ ;.tuFa:us for ::',is project came ~am bath a desire :o :,mzrove se,~ices far children an'i famiiias
in our communir/~ well as a demand for appropriate faciii~,~s for early childhood se~'tces
offered by Head Sta~ and Red Wing Public Schccls.
The seed for the Cot~i[1 Family Cancer was plan:ed tn 1989 while :he Red 'Nlng School Otsmc:
and Head Sm.'-: were developing plans for a joint public school Head Sca.,-:, program to se.we
children both with and without disabiiii:ies. The model provided clarity for the ,Asion of famiip'
centered ser'~fices. As this inclusive preschool program was implemented success~,:i!y. 'zcth
agencies recognized :he need to expand this 2,~p. e of collaborative relationship with other
communi~ agencies. The model proved that the ideal manner in which :o serve Foung ch~dren
and :heir families would be one of cooperation and ultimately collaboration.
Concu=ent!y. :he Ocodhue Coun(~' !nteragency Early [nte.'-venf. on Commit-tee was dfiLcent'.y
working to break down interagency banders by s~engrhening bonds and communication be.~u'een
agenc:.es se.'"~ing ~i young children. Through this process :he agencies realized that u,'crl~.ng :.n
isolation had created many problems for :he individual agencies, inc!udin~ :he duptlca:icn of
se.~-!ces, an inherent !ack of consisten,~ communication and at times, ineffective use of scarce
resources. The agencies, akhough [ndenendendk' pro,ding quali[u se.wice, realized :ha: :ego:her
:he effectiveness cf each individual prcrra:.'a would be 2reafiy enhanced throuc~h col!aborn:ica.
~ ~_noo~s has Long had a commF--m, en: to au~l~, ,~,,, ch~idhc, od se:Mces, and has
Long envisioned auuamg a ze~anent nome fcr mesa s~cas. [n !992 a oona s~ was
~o bund a new e~¢men:arx, school and a new high schcoL Th~ new eiemen:a~g school combined
collations ~om ~'o sm~Ier schoois fn the '; -~ + · ,.
' - a,s~,,c~. ~ a testat of mm project. Co~Oj! elemenzacj
was vacated and :he school ~c: hired an archi:ecmr~ fi~ :o examine ~ol~'s ~e~ness as an
early chi!dhocd center. Coi~2I was built in 1937 and was considered :o be a s~cmr~Iy sound
bu~ding. After de:a~ed study, :he ~smc: decided ~ha~ with remodeling and an ad~aon, the
building wc~d m~e a suitable home for Head Start and the dgtfic: ea~iv childhood programs.
Ye: :he schcol dg~c: and Head S~a~ ~:" , ....
:e~: that the se~ces in the ouuang codd be more
comprehensive. So. begnning in the sp~ng of i993 and continuing throughout i994.
'~i " ' ~ ~
~:c~ss~c,.s were ,,e.c with a va~e=~ of ¢,
- ea,u ch~dhco~fam~v serdces ~ '~ ~ ; :, '. .
~rO~Oe,s '~
a,,d, am~y Resource Center. Red Win~ Technic~ ~ '
~ ...... · ....... :~ Professionm Nanny and Ch~d C~re
.~g~, nee N,ng ;ecnmc~ Co~ege A~in~on. Red Wing P~va:e Indus,, Counc~. me
~i[v of Red Wing, ~ed Wing Housing and Redeveio~men: Autho~. Red Wtnq Tmnsi~on~
Hcusm~ Co~mon, ~awa:ha V~ley Ad~ Basic Education. Gocdhue Coun~ S~ci~ Se~ices, The
Leamin~ Circle Chgd C~e Center. Public He,th 5e~ices of Gcodhue and Wabasha
and Three Rivers Communi~ Ac~cn. ~nc. Reoresen~ves cf these ~ ~; ~
.. , , . ~e,,c.e~ were ~ked :o '
the schcoi =~st~c: de:e~ine wzicn cu~en: communi~, ~* ~ ......
n~_~ the uc~w~ Fam~y Center sacred
fccus on. as well as which cu~en: needs co~d be more apprcp~a:e[y se~ed in another
A: :he conclusion of these mee~n~s, cons~c~on documents were ~ ~;
~cm~,e:e~ whfch set :he
for :he remcde!ing of ~he Coi~ Eiemen~aEv School -
~;rcugh :hese mee~ngs it became apparen: :ha: wh~e the Col,d~ Family Center co~d provide a
~de va~e~: of se~ces. ~h~ center needed ad~cn~ resources :o meet ~ :he e~n~ ~
. ,,ee~s.
Mence. :he "Cci~ Redeve!o:men: P,o~ec, was ceveto~ec. In addison :o :he fam~v cen:~r.
redeveiccmen: =roiect inciudes The Women's Center and n ~' ~ '
..... a.e.~,.cc,,,coc park"plavcround.
The Red W:.ng Housing and Redeve!ooment Au:hc.~.~ ~cn~ 'Mth :h~ =~d Wing ~-~ :~ ~-:
Housin~ Cc~12on documented :ha: :he c:~, was [n d~sperz:e n~ed of a wom~n's sn~.te, and more
~nsi~on~ ~ousinq. [n addition. :hey ' "' ' :ha: : ~ '
~ ~.,_ ve~ many women aha children n
~a~E,-on~ acuszn~ and eme.gencv she!~er co~d cenefi~ fr~ ,~ ...... ~ ~-~ .....
ry, ,~ ~ ~ u~p ~..a[ ~ cen~er ,or wcmen ant cnucren neecmg temporal, shel~er
cr housing wcmc oe cons~ccted adjacen~ ~o ~he cen[er on :and owned by the schcoi c~mc:.
To suppo= the, etgnbornood and the famdy center a park"pJayground was needed. %nrcuch
meedn~s ~th ~he ci~, il was decided ~ha[ the ci~ of Red Wing woMd agree co purchase
!~nd acjacen: :o the famdv cen~r for deve!csmen: of a pIayground. %ne oiav~rcund wcMd he
cesi~.ed arcund ~he ~.ee~ of :he ,,e.ghcor.,ood and ~he famdv cen[er. The ci~ ~so a~reed :o
,,na,.ce the ~ ~, ~ ' '
c~ns~.~c~on ant maintenance of :he :iay~rcund. ~is ~om~enen: was a =~us :or
:he ,.e.~hccrnccc. as [hey were one of :he few '~ ....... '
. - ne~noornoc~ ~acmng ~ ci~. park. an~ :he :amev
center, as f: ~!owed Red Wing Schcois :o fcc~ on financin~ :he center ,~ ~, ~'
need of bu~d!ng a separate piayground for :he famgy center. ~cn .... c=cn. '~:hcu:
After the fni~ redeve[ooment ~ i ~, ·
. ~ro, e_, was deve!ocec, the involved a~encles :~' it
' · ~,~ was
to s~onscr a numeer of mee~ngs for inheres:ed communing members,,'~rcuDs to review :he ~an.
... ,.o,e~ oc~..ec a~ :,,e ,cdowtng meenn~s: a ColeJl n~i~h~crhood mee~n~: Ctq~ cf
Red Wing Piannin~ Commission. R ~ ' ' '
.e~ ,Nm~ C~ Co~nciI. ~aren:s or cniidren enro[ied in Red
Wtn~ Public $choo[s.,Head Sta~ pro,rams: R~d'Wtn~ Co~i2on fcr Transidon~ Housing Bcard:
Red Wing Hcusing and Radeveiopmen: Au:hcdtv Bcar~: Ear!'., Ch2dhccd ?~miJv EducarZcn
Ad~scr'g CcuncLi: Pa~cisan.:S tn Add.'. Basfc Edu'ca2on: Comm.'.uni:-~, Educe.loc
Commizaa: Red :Nfng Board of Education: ?ub[ic Meai,:h Ad',ScO' Ocmmizae: and :he ~ocdhue
CoL:ns; in:oregano7 Early !n:e.wenf. cn Commi~ee. T'nase mae~2nas srovided vaiuabie [nsigh: ..'.o
assfs: :he ccilabora~ve pa .rm~ers in fine .~un[ng :ha focus of :he Co[~4/'?~m~Jv Can:er. and :he
Celv:2! redeveiopmen: projec: as a whole.
P,,roiect Financing
When :ne ~ ~; ' '
..... t~e:,.~.. ~r,~ school diszf, c: needed
.:o explore ...c~e..,,al ~ndin~ .o .....for :he prcjec-.. W:.:h currenE schoc[ ~r'.dir'.g
nc: feasible for :he dismc: to remodel and add :o .'.he Cci, ii! schcoi from :he cu:ran:
fond. In adarion, a Lypica referendum did no: seem approgfia:e since s~,'o yea~ ago..'.he
community? .:assed a bond issue to build bozh a new hich schcci and a new eiemen:r~¥, school.
~ ,~e,e:cr~. :n c,~..:or :aLS prcjec: ~.~ come :o ~cir2on. :: was necessa~/ :or :ha schcc[ czsmc: :c
i~-:e Red Wino_ Homslng and Rade'.'e!cpmen: Authcf.~' was ye:-; :-,,;~.¢'--~¢->~ .... in :he :a:r. ik; can:ar
because :hey were ~read?' working on neighborhood deveicnmen: tn ~hi~
:h~v had dccumenmd a need for ~-' -; - for :e~ '
ccr. suka,icn i: was decided .:ha: :he R~d W!ng Housin~ ~r.d s,~ceve'.cpmen: .-".u:hcf..w (H.R.A.)
wcuid finance :he Colviit Family Canter. To factikate .-~ the schcoi dismic: !cna:ed
schco[ owned site ";=,-~'~' ' .......
~ ..... ,..~ aha surrounding !and) :o :he H .m: The,; in mm. scld revenue bonds
and de.$oslted :he mcne~, in Firs: Tn:s: of S:. ?a,'.2'. 'Fnesa bonds '~',' finance a farce :o~on cf :he
zroiec:. ~".e school dis~c: is resccnsibie for the design ~-'d ""='~
· ~e~e-_ s'cace..:or pro,rams when :hey. have no fad/ky of :heir cum
(!}
~cxoo, l~qentlne~ r, ee~ for..,
to house a!I ~istrict ?ro~jra'ms (199i};
School 5and Issue for a
?~sse~ (roll o71992);
school
W~ S
Architects hired
1957 one section
(spring of 1995);
to study ..... ..,,,x e!eme,,._,, y
bui!ai,ne} for future us~uI:<ess
Meetings held with agencies sewing young children
to determine the scope of the project (summer ansi
faf! of 1995);
(5) Project partners aefine4 (winter of 1994);
(6) Pr~ect financing avenues sought (winter of 1994)
(7) Community Meetings (winter of 1994);
(8) City Council Approval (spring of 1994);
(9} PIe~s ~eve!o?ed ar, d refin~'
summer of 1994);
(10) Project 5i~ (Auejust of 1994);
(11) 5bts accepted and boo, ds sold~.f*£.065.000.);
(~2) Grou~ 5rea~<~g (October 1994);
(!5) Cor~structlor, (October 1994 t~roug~ June cf 1995);
(14) Project Plans updated (1994-95);
(15)
lnterage~cy meetie~js to build relatio~sl~i?s witl~
builsii~j staff ansi lOlae for move (winter 1995
tt~rou~jf~ curreet);
(16) Grant Sources sought for additional fu~dieg
of 1994 tl~roug,~ current);
(s?ri~g
(17) 5ui!eti~g O?enin~ (August of 1995)
The
Colvill Family Center
is a coIlaboratiw.,~,
pactnership
between:
Recl Wi,~g Pu~Iic Schools'
Red Wing Housing an~t Rectevelo?me~t
Authority;
Three Rivers Community Act:o~/neaa Sta~;
Goodhue County Pul~lic Health Services;
Gooethue County Social Services; &
Hiawatha Valley A~luI't 5asic F~ducatio~
We believe that by working
together & sharinej resources,
we
for
can provide a wiete variety
of quality services
adults and young c¼iletre~
i~ our community.
NORTH
First Floor Plan
-5&i;: ~/~/~"'-:-];:o~
MAIL
lZ~-I
~E-~T_I
I1
[
Second Floor Plan
-~'~'-'i- ~'li"~';: i-;~O" ......
1'Tm-
Upper
Level
:E:: LI/ [
Plan
Third Floor Plan
Scale : 1/16" = 1'-0"
NORTH
New Hennantown Early Childhood & Family Cenier is a picturesque project which is
a shining example of interagency cooperation.
Early Childhood Screening--Required by law,
it gives kids best possible start in school
Do you have
a 4-year-old child
who has not
been screened
for development, health,
vision,
and hearing?
The Hermantown school
district provides free
Early Childhood
Screening
every month.
Early Cltildhood Screening is designed to give your child the best
possible start in school.
Minnesota Law 0VIS 123 701-7045) now requires that all children
attend Early Childhood Screening before they can enroll in
kindergarten.
In compliance with this law, the Hermantown school district will
provide this free health and developmental screening for preschool
childre~t on a montAI. V basis at the Eiementa7 School.
You will be contacted by phone or nail regarding an appointment.
At the screening, your child will receive-
. Vis~on and hearing screening;
· Developmental screening;
· Height and weight measurement.
And the parent Will receive- - Re~,~lts of the screening;
· Review of your child's health histmy and immunization status.
Health referrals will be made to your child's primary health care
provider or dentist, and developmental findings Will be followed up
by Hennantown school district personnel. Screening also provides
an opportunity to inform parents of programs that support and
improve the health and development of families-for example, Early
Childhood Family Education, HeadStart, and special education.
I:_aJly [.~IIIlUl IUVU I cllllllX ~uuv~,e~0, .~
i ntergenerational
J~t ~ ~mnfing and a family's indi~d~i values are. ~ on
from generation to generation, Herm~town's ECFE Program .
unde~ ~erent generations wi~in ~e fa~ly. Jule F~ler, a
mem~r of ~e D~u~-Su~rior Foster Gmnd~en~ ~iation,
~s volunt~r~ her time ~n our pm~ for ~c p~t ~ne y~rs.
Jule adds a dep~ ~d ric~ to Her~to~ EC~.
~m, tach spring arid Mo~er's Day, ~ ~ve ~G~dp~en~
W~" where ~1 ~d~en~ ~e invit~ to visit ~.
~ew He~antown Eady Childho~ & Family Center-
Pictumsque pmj~ was mimcle of intemgency
~o~mti~
~e m o~n t~ ~1, ~e n~ He~to~ ~ly C~i~ ·
Family Center is a remarkable colla~ration ~tween ~veral
agencies. ~rating o~a~tions include t~ He--town
~h~l di~i~ ~e A~owh~ Emno~c O~~ Agent, ~e
Ci~ of He~ntow~ ~ Hc~to~ ~no~c ~velopment
Autho~ ~DA), and ~ ~e~ ~ent of ~u~fion -
-not lo mention ~e ~n~om, am~t~ a~ ~ilde~.
The proj~ ~t~n~ a $3~,~ ~t from the Minnesota
Department of Econ6mic S~urities ~DA help~ with the
m~ng fi~cing...~ ~h~l ~s~ ~ ~OA ~11 ~y the
ci~ ~k ~er ~e next 15-y~r ~fi~. ~ pi~ue 12,~
~u~ f~t b~lding (fo~erly ~e EtOn ~en Buil~ng) ~11 then
~ o~ ~ ~e sch~ls.
~ c~len~ng from ~e "~ m~" s~d~in~ the project
~n~ct ~r~ signals from ~e AHo~ ~'s o~, ~e
Department of Economic Securities,' State Senators nnd
R~r~n~fives, ~e De~nt of Ad~s~fion, ~e Mi~esom
Depa~ment of Children, Families and ~arning, the Ci~ of
Her~to~, ~e P~ing and ~ng ~i~ion, ~DA, and
the adminisffations and sch~i ~ of ~o different ~h~l
~s~c~.
The new building will hou~ ali ~e He~nto~r~tor ~rly
Childho~ programs as well as the AEOA's ~ead Start for
Her~nto~ and Pr~tor. Other ~OA pmg~ include F~
Sheff, S~E, Ener~ Assistance, ~d W~eri~fion.
10
ALL TLL LEARN WELL AND SUCCEED
10
Why Elk River?
The invitation:
-City Needs?
Presentation to Elk River City Council 23 July 2001
Purpose:
1. Provide council with latest info. on proposed Family/Arts Center.
2. Invite City of Elk River to participate in "upgrading" the planned facility, or placing municipal
needs/programs in the planned facility--co-partner in the planning of the facility.
3. Seek City assistance in securing a suitable Elk River site for the facility.
4. Beginning of an on-going dialog regarding this issue.
Update on the Family/Arts Center:
-History & financial background:
-$500,000 Early Childhood facilities grant from CFL (Governor's bonding bill). 34,000
s.f. approximate cost (2002 construction) of $5M. Excluding land.
-District 728 responsible for above construction costs--anticipate fall 2002 bond
issue.
-School Board approved partnership with 2001 Arts Alliance (and vice versa!). Arts
Alliance would co-fund "commons" space as well as arts education spaces
(approx. 10,000 s.f.) at an approximate cost of $1.5M.
-What is proposed to be in the facility?
-A variety of early childhood programs (ECFE, ECSE, Early childhood screening, Head
Start, WIC, Crisis nursery) rooms and staff areas.
-Community education offices (including Adult Basic Education, child care for ABE,
computer lab for community and adult use)
-Community meeting spaces, including a large "commons" space
-Supervised visitation space for County Social Services
-Educational and exhibit space for the arts, and some performance space.
-Preliminary design considerations:
-Energy efficient facility to minimize operational costs.
-Aesthetically appealing--a destination in and of itself.
-Two-story construction as much as possible to minimize the "footprint" of the facility
and land requirements.
-No architect engaged at this point; we want to involve all potential partners before
going much further.
-Very natural partnership between the arts community and Community Education
(lifelong learning for all ages) as well as an excellent opportunity for
intergenerational learning and interaction under the same roof--pre-school
through adulthood, with the arts an integral part of the building environment.
-Savings for taxpayers.
-Municipal input into the facility planning process.
A site:
Current site problems at CE Center.
Publicly reported discussions of City sites offered to the YMCA.
-water tower site
-40 acre industrial park east of 169
-other city owned property?
'onclusion: