Loading...
3.3. SR 04-12-2010~/ City of Elk -~ River REQUEST FOR ACTION To Item Number Ma or & Ci Council 3.3. Agenda Section Meeting Date Prepared by Consent April 12, 2010 Rebecca Haug, Environmental Administrator Item Description Reviewed by MS4 and Construction Site Erosion Control Training Lori ohnson, Ci Administrator Reviewed by Action Requested Approve spending $4,000 out of the Surface Water Management Fund to hire Bonestroo, Inc., to provide training to required City Staff on construction site erosion and sediment control and the MS4 program. Background/Discussion The City of Elk River has been classified as a Municipal Separate Storm Sewer System (MS4) community by the Minnesota Pollution Control Agency (MPCA) since 2003. As part of this program, the MPCA is doing random audits of communities to ensure that the permit requirements are being met. Staff has been in contact with some of the communities that have been audited and one of the issues that the MPCA has noticed was lack of training for staff who deals with erosion and sediment control in the communities. After being notified of this, staff contacted the League of MN Cities MS4 Coordinator who suggested having employees attend the University of MN Extension training or hire Bonestroo to conduct a specialized training for Elk River staff. Staff felt that a specialized training would better meet the needs of Elk River and contacted Bonestroo to see about the feasibility of providing this training. They are willing to provide atwo-day training course, course materials, and certificates of attendance. This training will satisfy the MPCA training requirements for the MS4 program. Employees from the Environmental Division, Building Division, Planning Division, Streets Division, Park and Recreation Department, and Elk River Municipal Utilities would be attending this two-day course. The training is tentatively scheduled for all day May 4 and May 6 with half of the second day being out in the field. The fee for this specialized training is $4,000 and will certify that approximately 22 City of Elk River employees are certified in construction site erosion and sediment control and the MS4 program. Financial Impact • $4,000 out of the Surface Water Management Fund Attachments • • Letter dated April 2, 2010 from Jesse Carlson, Bonestroo, Inc. C:\Documents and Settings\jmiller\Local Settings\Temporary Internet Files\OLK3E\Action Requested-training.doc Action Motion by Second by Vote Follow Up C:\Documents and Settings\jmiller\Local Settings\Temporuy Internet Files\OLK3E\Action Requested-training.doc 2335 Highway 36 W St. Paul, MN 55113 Tel 651-636-4600 Fax 651-636-1311 www.bonestroo.com April 2, 2010 Rebecca Haug Environmental Administrator City of Elk River 13065 Orono Pkwy Elk River, MN 55330 Re: MS4 and Construction Site Erosion Control Training City of Elk River Bonestroo File No.: M01482-10001-0 Dear Rebecca: Bonestroo RECEIVEp qpR 451010 Thank you for the opportunity to discuss our training program with you and Bob last week. As discussed, the training will cover topics on construction site erosion and sediment control, and the MS4 program. As decided during the meeting, work will include atwo-day training course, course materials, and certificate of attendance. The training will satisfy the Category 2 (site manager) requirements identified in the Minnesota Construction Site General Permit. The following topic areas will be covered: • Illicit discharge detection and elimination • Construction site erosion and sediment control • Post construction operation and maintenance • Pollution prevention and good housekeeping This training will include classroom exercises to discuss appropriate BMPs based on example construction sites with an emphasis on single-family home construction. The second day will include an afternoon field session, which will be broken into two groups. Group one will focus on construction site erosion and sediment control. Group two will perform inspections on ponds, outfalls, and structural pollution control devices. For the work described above, we propose a lump sum fee of $4,000. This will also include the cost to print 22 copies of a 130-page training booklet, which we will reference during the training. We hope you find this proposal acceptable. Prior to moving forward with this work we will need to execute a contract, which I can send along once approval to move forward is given. If you have any questions regarding this proposal, please call me at 651-967-4643. Sincerely, BONESTROO, INC. Jesse Carlson Project Manager