5.5. SR 09-18-1995I~
'~
!September 12, 1995
j File: 230-271-20
('OISt~LTISC EtiG11EERS
1326 Energy Park Drive Honorable Mayor and City Council
St. Paul, MN 55108 City of Elk River
13065 Orono Parkway
612.644-4389 p.O. Box 490
1.800.888-2923 'Elk. River, MN 55330
Fax:bl2.644.9446
RE: 1995 OVERLAY IMFROVEMENTS
BROWN AND SELIGA ASSESSMENTS.
Dear Council Members:
TTFM 5.5_
As directed, we have investigated the Brown and Seliga properties relative to the proposed
assessments against them. The Seliga properties are two distinct parcels separated by 154th
Avenue. They were originally proposed to have one assessment for each. We can find no
reason to change this recommendation; therefore, we would recommend that the
uv;~ ENCINEERtNG: assessments stay "as is" with one $1,300 assessment against each parcel.
ENVIRONMENTAL
MuNiuPAt The confusion at the last hearing concerning the Brown property comes from the fact that
•R~NN!NG they own three parcels. We were recommending that two of these parcels, which are
sot! WASTE contiguous, be combined and only assessed one unit. Officially, they cannot be combined
sTRUCTuRAI by the County because one is platted and one iS metes and bounds. The third parcel, which
suRVmNG is separated from the others by a lot under different ownership, is still recommended to be
rRAEEic assessed one unit, $1,300. The confusion at the hearing was caused by the fact that
TRANSPOeranoN Mr. Seliga thought that they were combining two parcels not contiguous.
E~ErRICAuMECHANicAt In conclusion, we would recommend that the total Brown assessment be reduced from three
ENGINEERING:
units to two units, with the two. parcels considered combined for assessment purposes and
HvAc
RowER ~isTRiauTioN only allowed one buildable unit.
SCADA
SYSTEM CONTRO!.5 I have attached an exhibit which shows the. area in question and have. abeled the Brown
property and the Seliga property. I will be prepared at Monday evening's Council meeting
to explain this in further detail, if necessary.
Sincerely,
MSA, CONSULTING ENGINEERS
~~ ~~ ~
~~
OFFICES IN:
Terry J. Maurer, P.E.
. MINNEAP0~1S
PRIOR LAKE TJM:tW
S7. PAUL Attachment
WASECA 271-1120.sep
An Equal Opportunity Employer
519.31' #
~~ s
AVON „'°*"01~
~'
s
arw.aw
YlM' ~~-
~ ACRES
~
a
i
e ~~~
s
1 »..~rs.wm
~• i'~~
~~~\TM,~
n-~.-~
\:
:~...~-
,~-~~ BROWN
~~
~, `
^\ \ ~
\
~'~
~
+s~s:.-one w~.+a'
SELIGA
,«a,
164 1k
AYBR~
d.wmo' wam roam' arr i;_
13it.30'
BROWN
Q ~~~
~1 BROWN / SELIGA ~ ~ ~}~apQpS~
~11 OWNERSHIP citp of
-J EXHIBIT
~~~ Elk fiver
•
RESOLUTION 95-
A RESOL~[TTION FOR THE CITY OF ELK RNER
A RESOLUTION ADOPTING FINAL SUPPLEMENTAL
ASSESSMENT ROLL FOR THE
1995 OVERLAY IMPROVEMENT
WHEREAS, upon due notice properly made as required by law, the Elk
River City Council has met anal heard and passed upon all
objections to the proposed assessment for the 1.995 Overlay
Improvement .and has determined the .amount to be assessed
against each individual property as the Council deems just.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Elk River, Minnesota:
1. Final assessment roll, a copy of which is attached hereto and
incorporated herein by this reference, is hereby accepted and adopted
• and shall constitute the special assessment against the lands therein
named. Each such tract of land in the assessment roll is hereby found
to be benefited. by the improvement in an amount not less than the
amount of the assessment levied against it.
2. Such assessment shall be payable in equal annual installments,
including both principal and interest, amortized in such amount
annually as is required to pay the principal with interest at $°!° over a
period of five years.
3. The owner of .any property so assessed, may, at any time prior to
certification to the County Auditor of the assessment or the first
installment thereof, pay to the City Treasurer the whole of the
assessment on such property, with interest accrued to the date of
payment; except that no interest shall be charged if the entire
assessment is paid within 30 days after the adoption of this
Resolution. Prepayment may also be made after the certification of the
assessment or first installment thereof by paying to the City Treasurer
the entire amount of the assessment remaining unpaid with interest.
In the case of a payment made before November 15, interest will be
calculated through December 31 of the next succeeding year. Partial
prepayments may be made in .accordance with Ordinance 1404.02.
•
4. The City Administrator shall transmit to the County Auditor a
certified duplicate of the attached assessment roll to be extended on
the property tax lists of the County. Such assessment shall be
collected and paid over in the same manner as other municipal taxes.
Passed and adopted by the Elk River City Council this 18th day of
September, 1995.
Henry A. Duitsman, Mayor
ATTEST:
Sandra A. Thackeray, City Clerk
•
n
L_ ~
SUPPLEMENTAL ASSESSMENT ROLL
• X995 OVERLAYIMPROVEMENTS
ROLL ADOPTED ON SEPTEMBER 18, 1995
PARCEL ID# NAME AMOUNT ASSESSED ADDITION
75-024-2115 Seliga $1300 Unplatted
75-024-1202 Seliga $1300 Unplatted.
75-470-0211 Brown $1300 Avon Acres
75-024-2116 Brown -0- Unplatted
s: \admin\engineer\assesres.doc
•