Loading...
5.13. SR 09-18-1995~r ~ ~~ ,. ~- ~ ~~ 'ty of ~ MEMORANDUM l~ ~ TO: Mayor & City Council Rover FROM: Pat Klaers, City Adm ato DATE: September 18, 1995 SUBJECT: Consider Change Order for Elk Hills Drive/Dodge Avenue Improvement Project The city engineer will distribute a report on this agenda item at Monday night's meeting. The city engineer, city planner, city attorney and I have all had conversations with Gary Santwire (representing REP) regarding this change order. In turn, Gary Santwire has had numerous conversations with the owner of McDonalds in order to get his concurrence with the change order. We are all in agreement that the change order makes sense to minimize construction in this area when a 1996 Dodge Avenue project takes place. It is anticipated that by Monday evening, staff will have received a signed waiver of assessment appeal statement from the benefited property owners which will state the amount, interest rate, and length of the assessments for the four benefited property owners. One hundred percent of the cost of this change order is planned to be assessed out to these individuals per our mutual agreement. Unless something changes between now (Thursday) and Monday's Council meeting, staff recommends approval of the change order and the assessment appeal waiver as presented by the city engineer and city attorney. • 5.13. 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 ~ September 18, 1995 File: 230-246-30 ['OISCLTItiG E1GIIEENS 1326 Energy Park Drive Honorable Mayor and City Council St. Paul, MN 55108 City of Elk River 13065 Orono Parkway 612-644.4389 p O. Box 490 1.800-888-2923 ~ Elk River, MN 55330 Fax:bl2.644.9446 ~~~~~~ 5 - ~.~ RE: ELK HILLS DRIVE AND DODGE IMPROVEMENT PROJECT CHANGE ORDER NO. 1 Dear Council Members: Mr. Gary Santwire representing REP Limited, David Decker, and McDonalds has approached staff concerning a change order to the Elk Hills Drive/Dodge Improvement project. The change order would add to the construction of Dodge Avenue south from its current terminus point to the south lot line of the McDonalds property. Mr. Santwire uw~ ENGINEERING indicated the property owners that he represents are interested in having this added to the ENVIRONMENTAL current project so in the future there would be no disruption in front of their properties. MUNICIPAL Mr. Santwire indicated that the property owners he represents are willing to sign a petition PiANNING and waive their rights to appeal an assessment for the Dodge Avenue improvement. ~SOLiD WASTE sTRUCruRAL City Attorney Peter Beck has drafted the necessary petitions and waivers for the four suRVErING property owners involved. They include the three office buildings north of McDonalds and TRAEE~c the McDonalds site. We understand that Mr. Santwire will have the signed petitions and TRANSPORTATioN waivers available at Monday evening's meeting. ELEaRicnuMECHANICaL The Dodge Avenue improvement will include a 42-foot wide urban road with concrete curb ENGINEERING: yvac and gutter, and a sidewalk on the east side.. The roadway will be striped with two =ow~ER DisTRlsuTioN southbound lanes and one northbound. We would recommend approval of the change order s-ADA contingent upon all four property owners signing the petition and waiver of their rights to svsTEM coNrROLS appeal the assessment. __ _ If you have any questions regarding this, I will be in attendance at Monday evening's City Council meeting. Sincerely, OFFICES IN: MINNEAPOLIS PRIOR LAKE ST. PAUL WASECA MSA, CONSULTING ENGINEERS ~/ ~° l Terry J: Maurer, P.E. TJM:tw 246-1812.sep An Equal Opportunity Employer